Sl. No. |
Updated On |
Name of Project |
Daily Progress |
Project Layout |
Photo Album |
Scheduled date of completion |
AS Amount (in Lakhs) |
View Project |
1 |
|
AMRUT 2.0-UWSS to Muvattupuzha-Providing FHTC to all Households in Muvattupuzha Municipality-Pipeline Work (EKMAMRUT 2112214264) |
No Updates
|
NA |
No Updates
|
31 Jul 2024 |
869000 |
View Project |
2 |
|
Jal Jeevan Mission (JJM) - Parassala GP (TVMJJM022214486) |
No Updates
|
NA |
No Updates
|
20 Aug 2025 |
541193 |
View Project |
3 |
|
Jal Jeevan Mission (JJM)-RWSS to Thevalakkara-Consructing Newly Drilled Tube well at Koozhamkulam Pump House compound (Ward 19)in Thevalakkara Panchayath (KLMJJM082015933) |
No Updates
|
NA |
No Updates
|
Date is not specified |
242918 |
View Project |
4 |
|
Jal Jeevan Mission (JJM) - 2022-23 - CWSS to 13 Panchayath based on Malankara Resorvoir (KTMJJM102214715) |
No Updates
|
NA |
No Updates
|
31 Mar 2024 |
125163 |
View Project |
5 |
|
CWSS to 13 Panchayaths based on Malankara Reservoir (KTMJJM102214992) |
View Progress
|
View Layout |
View Photos
|
08 Jan 2025 |
124300 |
View Project |
6 |
|
Jal Jeevan Mission- 21-22- CWSS to Thazhekkode and Alipparamba Panchayath in Malappuram District (MLPJJM092110135) |
No Updates
|
View Layout |
No Updates
|
31 Dec 2024 |
118000 |
View Project |
7 |
|
JJM PhaseII-WSS To Ulliyeri,Moodadi and adjoing 13 Panchayath in Kozhikode disrtict Providing FHTC's by Surveying,Planning ,Designing and constrcution and commissioning of water supply facilities -Construction of floating Intake structure , Raw water pumpset, Raw water pumping main, 100 mld WTP, Clear water sump,Claer water pumping main , supply and erection of transformers ,Construction of reservoirs at Ulliyeri,Kayanna,Atholi,Chenghottukavu,Chemanchery,Arikkulam,Moodadi,Nochad,Keezhariyur,Mepayur ,Chengaroth,Koothalo,Panangadand Thikkodi,Laying transmission main and distribution system. (CLTJJM09219092) |
View Progress
|
View Layout |
View Photos
|
31 Mar 2025 |
104280 |
View Project |
8 |
|
Jal Jeevan Mission 2022-23: (5th SWSM) Thrikodithanam Grama Panchayath: Laying distribution net work and providing 8500 FHTC’s and Road restoration work in Thrikodithanam Panchayath (KTMJJM052210824) |
View Progress
|
View Layout |
View Photos
|
08 Apr 2024 |
96300 |
View Project |
9 |
|
JJM-WSS to Vazhapally panchayat Ph2 (KTMJJM052210825) |
No Updates
|
NA |
No Updates
|
31 Dec 2024 |
83840 |
View Project |
10 |
|
Jal Jeevan Mission - Kannur District- WSS to Alakkode and adjoining Panchayaths (KNRJJM02229468) |
View Progress
|
NA |
View Photos
|
Date is not specified |
81590 |
View Project |
11 |
|
Jal Jeevan Mission (JJM)-JJM-PHASE-II – WSS TO CHATHAMANGALAM AND ADJOINING 7 PANCHAYATHS IN KOZHIKODE DISTRICT -PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION TO KODANCHERY GRAMA PANCHAYATH - (CLTJJM092112432) |
View Progress
|
View Layout |
View Photos
|
31 Aug 2024 |
70100 |
View Project |
12 |
|
JJM PhaseII-WSS To Chathamangalam, Madavoor,Kizhakoth, Unnikulam, Thamarassey,Kodancheri,Puthuppadi and Kattipara G.P's-Providing FHTC's by Surveying,Planning ,Designing and constrcution and commissioning of water supply facilities -Construction of Intake well, Raw water pumpset, Raw water pumping main, 100 mld WTP, Clear water sump,Claer water pumping main, Pumpsets , supply and erection of transformersConstruction of reservoirs at Chathamngalm,Madavoor,Kizhakoth, Unnikulam and Thamarassery, Laying transmission main and distribution system. (CLTJJM092111004) |
View Progress
|
View Layout |
View Photos
|
25 Jun 2024 |
70100 |
View Project |
13 |
|
JJM-2021-24 ANADU AND NANNIYODE PANCHAYATH-PHASE III-PACKAGE V&VIII I (TVMJJM092111320) |
View Progress
|
View Layout |
View Photos
|
15 Oct 2022 |
65666 |
View Project |
14 |
|
Jal Jeevan Mission - CWSS to Eramala and Adjoining Seven Panchayats (CLTJJM092111005) |
View Progress
|
NA |
View Photos
|
31 Dec 2024 |
56977 |
View Project |
15 |
|
JJM-KANNUR DISTRICT- WSS TO TRIPPANGOTTUR & ADJOINING PANCHAYATHS (KNRJJM022213306) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2024 |
48642 |
View Project |
16 |
|
JJM-KAREEPRA -PHASE-II-CONSTRUCTION OF PROPSED OHSRS,LAYING OF PUMPING MAIN 200MM,GRAVITY MAIN 150MM,SUPPY AND INSTALLATION OF CENTRIFUGAL PUMP FOR NEW PUMPING MAIN,REPALCEMENT OF OLD PUMPS AT WTP&INTAKE WELL, RENNOVATION OF EXISTING WELL CUM PUMP HOUSE & WTP INCLUIDNG CONSTRCUTION OF CHLORINATION ROOM AND DISTRIBUTION NETWORK FOR UNCOVERED AREA OF KAREEPRA (KLMJJM08206899) |
View Progress
|
View Layout |
View Photos
|
24 Nov 2023 |
46872 |
View Project |
17 |
|
Jal Jeevan Mission (JJM)-Jal Jeevan Mission (JJM)- 2021-24 WSS to Desamangalam, Varavoor, Erumapetty, Kadangode, Velur ,Choondal,Kandanassery,Mullurkara Part(W-1,2,3,4,half of 5 and 14) Panchayaths -Clear Water Pumping main from proposed sump to Desamangalam master Tank and CWGM from Desamangalam master tank to Velur, varavoor, Kadanassery, Kadangode, Erumapetty, Choondal, Mullakkkara and Elavally Tanks-General Civil Work (TCRJJM052215571) |
No Updates
|
View Layout |
No Updates
|
05 Nov 2024 |
44971 |
View Project |
18 |
|
Jal Jeevan Mission (JJM)-JJM PHASE 2- 2021-22 WSS to Desamangalam, Varavoor, Erumapetty, Kadangode, Velur ,Choondal,Kandanassery,Mullurkara Part(W-1,2,3,4,half of 5 and 14) Panchayaths & Wadakkanchery Muncipality -Package I --Construction of 12m Dia intake well at Kondayur -General Civil Work- (TCRJJM052215568) |
No Updates
|
View Layout |
No Updates
|
18 Jun 2024 |
44971 |
View Project |
19 |
|
Jal Jeevan Mission (JJM) - JJM PHASE 2- 2021-24 WSS to Desamangalam, Varavoor, Erumapetty, Kadangode, Velur ,Mulloorkara part,Choondal,Kandanassery and Elavally Panchayaths in Thrissur District – Package - I - Construction of 40 MLD WTP at DESAMANGALAM. (TCRJJM052215569) |
No Updates
|
View Layout |
No Updates
|
29 Apr 2025 |
44971 |
View Project |
20 |
|
JJM- CWSS to Kunnathoor, Poruvazhy, Sooranad North Panchayaths in Kunnathoor Taluk and Thazhava, Thodiyoor, Kulasekharapuram Panchayaths in Karunagappally Taluk (KLMJJM092110774) |
View Progress
|
View Layout |
View Photos
|
22 Nov 2025 |
43939 |
View Project |
21 |
|
Jal Jeevan Mission (JJM)-WSS to Chungathara,Pothukallu,Edakkara and Vazhikadavu Grama Panchayaths in Malappuram District (MLPJJM022214994) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2024 |
42947 |
View Project |
22 |
|
JJM- CWSS to Thrikkalangode, Porur and Pandikkad Panchayaths in Malappuram district (MLPJJM09218682) |
View Progress
|
View Layout |
View Photos
|
31 Mar 2025 |
42242 |
View Project |
23 |
|
JJM-CWSS to Idukki- Kanjikuzhi, Vazhathope, Mariyapuram, Kamakshi, Vathikudy and Vannapuram (Part) Panchayaths in Idukki District (IDKJJM052210880) |
View Progress
|
View Layout |
View Photos
|
31 Oct 2025 |
41900 |
View Project |
24 |
|
JJM-CWSS to Vettathur, Keezhattur and Melattur GPs (MLPJJM052212037) |
No Updates
|
NA |
No Updates
|
31 Mar 2024 |
40372 |
View Project |
25 |
|
Jal Jeevan Mission - WSS to Thiruvallur,Ayanchery,Maniyur and Cheruvannur Panchayats (CLTJJM052211010) |
View Progress
|
NA |
View Photos
|
31 Dec 2024 |
37157 |
View Project |
26 |
|
5th SLSSC - RWSS to Cherukole Naranganam and Ranni (part) Grama Panchayaths - Supplying and laying distribution lines, RWPM, CWPM and providing 8915 FHTCs in various wards (PTAJJM102214895) |
No Updates
|
NA |
No Updates
|
Date is not specified |
36991 |
View Project |
27 |
|
5th SLSSC - RWSS to Cherukole Naranganam and Ranni (part) Grama Panchayaths - Supplying and laying distribution lines, RWPM, CWPM and providing 8915 FHTCs in various wards. (PTAJJM102214842) |
No Updates
|
NA |
No Updates
|
Date is not specified |
36991 |
View Project |
28 |
|
JJM : 5th SLSSC - RWSS to Cherukole, Naranganam & Ranni(part) Grama Panchayaths - Supplying and laying Distribution lines, RWPM, CWPM and providing 8915 FHTCs in various wards. (PTAJJM022214970) |
No Updates
|
NA |
No Updates
|
05 Apr 2024 |
36991 |
View Project |
29 |
|
Jal Jeevan Mission (JJM)- (KNRJJM022213834) |
No Updates
|
NA |
No Updates
|
Date is not specified |
36870 |
View Project |
30 |
|
Jal Jeevan Mission (JJM)-WSS to Peravoor &adjoining Panchayths(Peravoor,Muzhakunnu,Kolayad, Chittariparamba,Aralam and Ayyankunnu) -Laying Distribution Network and providing FHTCs-Zone III-Pipeline Work (KNRJJM022213833) |
View Progress
|
NA |
View Photos
|
31 Dec 2024 |
36870 |
View Project |
31 |
|
Jal Jeevan Mission (JJM)-WSS to Peravoor &adjoining Panchayths(Peravoor,Muzhakunnu,Kolayad, Chittariparamba,Aralam and Ayyankunnu) -Laying Distribution Network and providing FHTCs-Zone II-Pipeline Work (KNRJJM022213831) |
View Progress
|
NA |
View Photos
|
13 Oct 2024 |
36870 |
View Project |
32 |
|
Jal Jeevan Mission (JJM)-WSS to Peravoor &adjoining Panchayths(Peravoor,Muzhakunnu,Kolayad, Chittariparamba,Aralam and Ayyankunnu) - Laying Distribution Network and providing FHTCs-Zone I-Pipeline Work (KNRJJM022210849) |
View Progress
|
NA |
View Photos
|
13 Sep 2024 |
36870 |
View Project |
33 |
|
Jal Jeevan Mission (JJM)-WSS to Peravoor &adjoining Panchayths(Peravoor,Muzhakunnu,Kolayad, Chittariparamba,Aralam and Ayyankunnu) - Laying Distribution Network and providing FHTCs-Zone IV- (KNRJJM020214934) |
View Progress
|
NA |
View Photos
|
Date is not specified |
36870 |
View Project |
34 |
|
Jal Jeevan Mission (JJM)-WSS to Peravoor &adjoining Panchayths(Peravoor,Muzhakunnu,Kolayad, Chittariparamba,Aralam and Ayyankunnu) - Laying Distribution Network and providing FHTCs-Zone-V (KNRJJM022214943) |
View Progress
|
NA |
View Photos
|
Date is not specified |
36870 |
View Project |
35 |
|
Jal Jeevan Mission (JJM)-WSS to Peravoor &adjoining Panchayths(Peravoor,Muzhakunnu,Kolayad, Chittariparamba,Aralam and Ayyankunnu) - Laying Gravity main for Aralam and Ayyankunnu Panchayaths.-Pipeline Work (KNRJJM020214942) |
View Progress
|
NA |
View Photos
|
09 Dec 2024 |
36870 |
View Project |
36 |
|
JJM-2021-22 CWSS TO KARULAI,MOOTHEDAM,AMARAMBALAM AND CHOKKAD PANCHAYATHS IN MALAPPURAM DIST (MLPJJM022214465) |
No Updates
|
NA |
No Updates
|
31 Mar 2025 |
36230 |
View Project |
37 |
|
WSS to Enadimangalam, Ezhamkulam, Erath and Kalanjoor [Part] in PTA (PTAJJM052210805) |
View Progress
|
View Layout |
View Photos
|
28 Jun 2024 |
35605 |
View Project |
38 |
|
JJM - WSS to adjoining panchayaths of varkala Phase II (TVMJJM022213488) |
View Progress
|
NA |
View Photos
|
31 Dec 2024 |
35264 |
View Project |
39 |
|
JJM-CWSS to Harippad and Adjoining Panchayaths-Phase III Supplying and Laying of Distribution network and giving FHTC (ALPJJM052210783) |
View Progress
|
NA |
View Photos
|
31 May 2025 |
34548 |
View Project |
40 |
|
JJM - WSS toThriprangodu, Mangalam, Purathur, Thalakkad and Vettom Panchayaths (MLPJJM092112039) |
View Progress
|
NA |
View Photos
|
08 Jun 2024 |
34400 |
View Project |
41 |
|
Jal Jeevan Mission (JJM -5th SWSM) CWSS to Vazhappally, Thrikodithanam, Paippadu, Kurichy & Changanasserry Municipality - Construction of 22 MLD Water treatment Plant at Morkulangara including alied works (KTMJJM052215250) |
View Progress
|
View Layout |
View Photos
|
21 May 2025 |
34002 |
View Project |
42 |
|
Jal Jeevan Mission (JJM)-JJM 5th SWSM-WSS to Paippadu, Thrikkodithanam, Vazhapally and Kurichi panchayaths - SUPPLYING , LAYING,TESTING,TRIAL RUN AND COMMISSIONING OF 711mm MS RAW WATER PUMPING MAIN FROM RAW WATER PUMPHOUSE AT KATTODU TO WTP AT MORKULANGARA, SUPPLY , ERECTION TESTING,TRIAL RUN AND COMMISSIONING OF VT PUMPSETS, TRANSFORMER, PRESSURE FILTER ETC (KTMJJM052215551) |
View Progress
|
NA |
View Photos
|
18 Jan 2025 |
34002 |
View Project |
43 |
|
JJM Athiyanoor Panchayath supplying laying 350mmDIK9pumping main (TVMJJM092114011) |
No Updates
|
NA |
No Updates
|
31 Aug 2023 |
33382 |
View Project |
44 |
|
JJM - Construction & Commissioning of Production Componenets and Providing FHTCs in Mampad Pt (MLPJJM092112617) |
No Updates
|
View Layout |
No Updates
|
02 Sep 2023 |
32280 |
View Project |
45 |
|
JJM - WSS TO NEDUMKANDAM, PAMPADUMPARA, UPPUTHARA ELAPPARA (PART) AND ARAKULAM (PART) PANCHAYATHS IN IDUKKI DISTRICT (IDKJJM052210879) |
View Progress
|
View Layout |
View Photos
|
31 Oct 2025 |
31708 |
View Project |
46 |
|
Jal Jeevan Mission (JJM)-JJM-Phase 3-CWSS to Edappal and adjoining Panchayaths-Package 4-Laying distribution line and providing balance FHTCs in Edappal Grama Panchayath. (MLPJJM022214986) |
View Progress
|
NA |
View Photos
|
Date is not specified |
31602 |
View Project |
47 |
|
Jal Jeevan Mission(JJM)-JJM Phase 3-CWSS to Edappal and adjoining Panchayaths-Package 5-Laying distribution line and providing balance FHTCs in Vattamkulam Grama Panchayath-Pipeline Work. (MLPJJM022214961) |
View Progress
|
NA |
View Photos
|
Date is not specified |
31602 |
View Project |
48 |
|
Jal Jeevan Mission(JJM)-JJM-Phase 3-CWSS to Edappal and adjoining Panchayaths-Package 6-Construction of 25 LL Capacity OHSR at Changaramkulam for Nannamukk Panchayath-General Civil Work. (MLPJJM022215963) |
View Progress
|
NA |
View Photos
|
Date is not specified |
31602 |
View Project |
49 |
|
Jal Jeevan Mission(JJM)-JJM-Phase 3-CWSS to Edappal and adjoining Panchayaths-Package 7-Laying distribution line and providing balance FHTCs in Nannammukku Grama Panchayath-Pipe line work. (MLPJJM022214969) |
View Progress
|
NA |
View Photos
|
Date is not specified |
31602 |
View Project |
50 |
|
Jal Jeevan Mission (JJM)-JJM-Phase 3-CWSS to Edappal and adjoining Panchayaths-Package 8 - Construction of 16 LL Capacity OHSR at Kokkur for Alancode Panchayath-General Civil Work (MLPJJM022215860) |
View Progress
|
NA |
View Photos
|
Date is not specified |
31602 |
View Project |
51 |
|
Jal Jeevan Mission (JJM)-JJM-Phase 3-CWSS to Edappal and adjoining Panchayaths-Package 9-Laying distribution line and providing balance FHTCs in Alancode Grama Panchaayath-Pipeline work. (MLPJJM022215777) |
View Progress
|
NA |
View Photos
|
07 Apr 2024 |
31602 |
View Project |
52 |
|
Jal Jeevan Mission (JJM)-JJM-Phase 3-CWSS to Edappal and adjoining Panchayaths-Supplying, Laying, Testing and Commissioning of Gravity Main Pipeline (from 700mm-350mm DI K9) from Koorada OHSR to Kokkur OHSR.Pipe line work. (MLPJJM022215775) |
View Progress
|
NA |
View Photos
|
Date is not specified |
31602 |
View Project |
53 |
|
JJM -CWSS to Kunnathoor, Poruvazhy, Sooranad South Panchayaths in Kunnathoor Taluk and Thazhava , Thodiyoor, Kulasekharapuram Panchayaths in Karunagappally Taluk (KLMJJM092110771) |
No Updates
|
NA |
No Updates
|
Date is not specified |
30750 |
View Project |
54 |
|
JJM - Supply and laying Various size distribution mains and Providing FHTC (3378) in Kunnathoor Grama Panchayath (KLMJJM092111839) |
View Progress
|
View Layout |
View Photos
|
24 Jul 2023 |
30750 |
View Project |
55 |
|
JJM 2021-WSS to Moonniyoor,Thenhipalam,Chelembra,and Vallikkunnu Pts . (MLPJJM092112338) |
View Progress
|
NA |
View Photos
|
06 Aug 2024 |
30578 |
View Project |
56 |
|
Jal Jeevan Mission (JJM)-JJM-PHASE CWSS TO KARASSERY KODIYATHUR OMASSERY AND THIRUVAMBADY GRAMA PANCHAYATH IN KOZHIKODE DISTRICT - PROVIDING FUNCTIONAL HOUSEHOLD CONNECTION IN KOODARANHI GRAMA PANCHAYATH IN KOZHIKODE DISTRICT (CLTJJM092112430) |
View Progress
|
View Layout |
View Photos
|
30 Dec 2023 |
29490 |
View Project |
57 |
|
JJM PHASE II :CWSS TO KARASSERY, KODIYATHUR AND THIRUVAMBADY GRAMA PANCHAYATHS IN KOZHIKODE DISTRICT: PART III - PROVIDING FHTCS BY LAYING NEW DISTRIBUTION LINES AT KODIYATHUR GRAMA PANCHAYATH (CLTJJM092113167) |
No Updates
|
View Layout |
No Updates
|
23 Apr 2023 |
29490 |
View Project |
58 |
|
JJM PHASE II :CWSS TO KARASSERY KODIYATHUR AND THIRUVAMBADY GRAMA PANCHAYATHS IN KOZHIKODE DISTRICT: PART V: CONSTRUCTION ,TESTNG AND COMMISSIONING OF 12 LL OHSR , PROVIDING FHTCS BY LAYING NEW DISTRIBUTION LINES AT THIRUVAMBADY GRAMA PANCHAYATH (CLTJJM092113163) |
No Updates
|
View Layout |
No Updates
|
27 Apr 2023 |
29490 |
View Project |
59 |
|
JJM PHASE II: WSS TO KARASSERY, KODIYATHUR AND THIRUVAMBADY GRAMA PANCHAYATHS IN KOZHIKODE DISTRICT: PART II: CONSTRUCTION TESTING AND COMMISSIONING OF 50 LL OHSR, PROVIDING FHTCs BY LAYING NEW DISTRIBUTION LINES AT KARASSERY GRAMA PANCHAYATH (CLTJJM092113162) |
No Updates
|
View Layout |
No Updates
|
14 Oct 2023 |
29490 |
View Project |
60 |
|
JJM PHASE II : WSS TO KARASSERY, KODIYATHUR, KOODARANHI ,THIRUVAMBADY AND OMASSERY GPs IN KOZHIKODE DISTRICT: PART IV: CONSTRUCTION ,TESTING AND COMMISSIONING OF 18 LL GLSR , PROVODING FHTCs BY LAYING NEW DISTRIBUTION LINES AT OMASSERY GRAMA PANCHAYATH (CLTJJM092113166) |
No Updates
|
View Layout |
No Updates
|
23 Jul 2023 |
29490 |
View Project |
61 |
|
JJM-Phase 2 CWSS to Vellamunda, Thondernadu, Thavinjal, and Panamaram Panchayaths in Wayanad District Phase II (CLTJJM092111008) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2024 |
29139 |
View Project |
62 |
|
The Jal Jeevan Mission (JJM)-JJM-2022-23-WSS to Puthur, Pananchery and Madakkathara Panchayaths -Clear water pumping main and gravity main-General Civil Work (TCRJJM052215636) |
No Updates
|
NA |
No Updates
|
Date is not specified |
29066 |
View Project |
63 |
|
KIIFB -Kuttanad Drinking Water Project Phase II in Alappuzha District (ALPKIIFB0619635) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2023 |
28954 |
View Project |
64 |
|
JJM-WSS to Kanjoor,Sreemoolanagaram,Chengamanadu,Nedumbassery&Parakkadavu Panchayaths (EKMJJM052211094) |
View Progress
|
View Layout |
View Photos
|
31 Mar 2024 |
28914 |
View Project |
65 |
|
JJM : PROVIDING FHTCS TO CHAKKUPALLAM, VANDANMEDU, KARUNAPURAM AND VANDIPERIYAR PANCHAYATS IN IDUKKI DISTRICT (IDKJJM052210878) |
View Progress
|
View Layout |
View Photos
|
12 Dec 2024 |
28399 |
View Project |
66 |
|
Jal Jeevan Mission- Comprehensive Drinking Water Scheme to Pallassana, Elevanchery, Alathur, Erimayur, Puducode and Kavassery Panchayaths in Chittur and Alathur Taluk in Palakkad District – PHASE-II (PKDJJM12206544) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2024 |
27445 |
View Project |
67 |
|
WRD009-02 -KIIFB- WSS to Mattanur and Iritty Phase II -Laying Distribution System (KNRKIIFB042315543) |
View Progress
|
NA |
View Photos
|
16 Jun 2025 |
26970 |
View Project |
68 |
|
Kasaragod District-WSS to Ajanur,Pallikkara,Udma, Pullur Periya Panchayats and Kolathur village in Bedadka Panchayth- (KGDJJM022215646) |
View Progress
|
NA |
View Photos
|
Date is not specified |
26883 |
View Project |
69 |
|
WSS to Ajanur, Pallikkera, Uduma, Pullur Periya Panchayaths and Kolathur village in Bedaduka Panchayath - Construction of Intake well cum pump house, Laying Pumping Main,Gravity Main and laying distribution &providing FHTC in Bedadka Panchayath. (KGDJJM022215721) |
View Progress
|
NA |
View Photos
|
Date is not specified |
26883 |
View Project |
70 |
|
Jal Jeevan Mission (JJM)-KWA/PD-T/DB4-328/2021-Providing Pipe line extension and FHTCs in Kulathoor Grama panchyath-Pipeline Work (TVMJJM022314874) |
No Updates
|
NA |
No Updates
|
02 Apr 2024 |
25507 |
View Project |
71 |
|
CWSS to Mundakayam, Koruthode Panchayaths (KTMJJM022214990) |
View Progress
|
View Layout |
View Photos
|
08 Jan 2025 |
25122 |
View Project |
72 |
|
Jal Jeevan Mission (JJM)-JJM- WSS to Chelakkara,Mullurkara and Panjal Panchayaths- Production components.-Clear water pumping main-General Civil Work (TCRJJM052215583) |
No Updates
|
NA |
No Updates
|
11 Jul 2024 |
24625 |
View Project |
73 |
|
Jal Jeevan Mission (JJM)-JJM- WSS to Chelakkara,Mullurkara and Panjal Panchayaths- Production components.-Construction of 15 MLD WTP at Mechrikunnu-General Civil Work (TCRJJM052215594) |
No Updates
|
NA |
No Updates
|
Date is not specified |
24625 |
View Project |
74 |
|
Jal Jeevan Mission (JJM)-JJM- WSS to Chelakkara,Mullurkara and Panjal Panchayaths- Production components.-Supplying,Laying,Testing and Commissionig RWPM from intake well to WTP and Road restoration works-Pipeline Work (TCRJJM052215580) |
No Updates
|
NA |
No Updates
|
09 Apr 2024 |
24625 |
View Project |
75 |
|
PROJECTS UNDER KERALA INFRA.INVT. FUND BOARD KIIFB(74)-Augmentation of WSS to Kollam Corporation Phase II(7503) (KLMKIIFB0117465) |
View Progress
|
View Layout |
View Photos
|
31 Mar 2024 |
23500 |
View Project |
76 |
|
Jal Jeevan Mission(JJM)-JJM Phase 3-CWSS to Edappal and adjoining Panchayaths-Package 2-Construction of 33LL Capacity Master OHSR at IDTR and 38LL Capacity GLSR at IDTR for Kaladi and Edappal Panchayaths (MLPJJM022214980) |
View Progress
|
NA |
View Photos
|
Date is not specified |
23317 |
View Project |
77 |
|
AMRUT - 2.0 - Augmentation of Water Supply To Kollam Corporation – Distribution Improvements (KLMAMRUT112214153) |
View Progress
|
View Layout |
View Photos
|
30 Sep 2024 |
22713 |
View Project |
78 |
|
AMRUT - 2.0 improvement of water supply to kollam corporation (KLMAMRUT112214152) |
No Updates
|
NA |
No Updates
|
Date is not specified |
22713 |
View Project |
79 |
|
AMRUT - 2.0 improvement of water supply to kollam corporation (KLMAMRUT112214151) |
No Updates
|
NA |
No Updates
|
Date is not specified |
22713 |
View Project |
80 |
|
JJM-WSS to Konnathady and Udumbanchola Panchayaths in Idukki District (IDKJJM052211063) |
View Progress
|
NA |
View Photos
|
30 Sep 2024 |
22546 |
View Project |
81 |
|
KIIFB-WSS to Thrissur Corporation and adjoining panchayaths (TCRKIIFB0117503) |
No Updates
|
View Layout |
No Updates
|
01 Mar 2024 |
22297 |
View Project |
82 |
|
JJM- CWSS to Ponnani and Adjoining Panchayaths - Phase -2 (MLPJJM092111068) |
View Progress
|
NA |
View Photos
|
Date is not specified |
22246 |
View Project |
83 |
|
Jal Jeevan Mission (JJM)-WSS to Trikaripur and Adjoing Panchayaths-Construction of 50 LL OHSR at Puthilottmala, Supplying and Laying Distribution system and Providing FHTC in Pilicode Part, Padne, Trikaripur and Valiyaparamba Panchayaths (KGDJJM092115539) |
View Progress
|
NA |
View Photos
|
03 Nov 2024 |
22199 |
View Project |
84 |
|
Jal Jeevan Mission (JJM)-WSS to Trikaripur and Adjoing Panchayaths- TP to Nidumba-Construction of 10 LL OHSR, Supplying and Laying of Transmission Main, Pumping Main and Distribution (Pilicode Part) and Providing FHTC (KGDJJM092115159) |
No Updates
|
NA |
No Updates
|
25 Jun 2024 |
22199 |
View Project |
85 |
|
JJM - KASARAGOD Dts - WSS TO TRIKARIPUR AND ADJOINING PANCHAYATH - CHERUVATHUR PANCHAYATH - CONSTRUCTION OF 15LL OHSR AND LAYING DISTRIUTION SYSTEM (KGDJJM092114821) |
No Updates
|
NA |
No Updates
|
Date is not specified |
22199 |
View Project |
86 |
|
JJM -CWSSto Kuttippuram Thirunnavaya, Athavanad and Marakkara Panchayaths (MLPJJM022212040) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2025 |
22107 |
View Project |
87 |
|
JJM Providing FHTCs to Kuttippuram ,Thirunnavaya,Athavanad and Marakkara panchayaths (MLPJJM022213232) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2024 |
22107 |
View Project |
88 |
|
Jala Jeevan Mission Mynagappally : Package II- Reconcreating of Panchayat road and reconstruction of PWD roads in Mynagappally Grama Panchayat. (KLMJJM082015243) |
View Progress
|
NA |
View Photos
|
26 May 2023 |
21300 |
View Project |
89 |
|
KIIFB-Augmentation and Modernization of WSS to Alappuzha Municipality, Aryad, Mannanchery and Mararikulam South Panchayaths (ALPKIIFB0619496) |
View Progress
|
View Layout |
View Photos
|
31 Mar 2024 |
21171 |
View Project |
90 |
|
Jal Jeevan Mission (JJM)-Phase IV -WSS to Kidangoor, Kadaplamattom and Marangattupally Panchayaths - Construction of OHSRs, Laying Distribution net work and Providing FHTCs in Marangattupalli Panchayath.-General Civil Work (KTMJJM022215954) |
View Progress
|
NA |
View Photos
|
Date is not specified |
21130 |
View Project |
91 |
|
JJM-WSS to Morayur,Pulpatta,Pookotoor Panchayath in Malappuram District (MLPJJM092112635) |
View Progress
|
NA |
View Photos
|
10 Nov 2024 |
21051 |
View Project |
92 |
|
JJM -WSS to Rajakkd , Bisonvally, Rajakumary (Part) and Senapathy (Part) Panchayath in Idukki District (IDKJJM022211084) |
View Progress
|
View Layout |
View Photos
|
31 Mar 2025 |
20979 |
View Project |
93 |
|
JJM - Phase III - Improvements of CARWSS to Moorkkanad and adjoining Panchayaths (MLPJJM022212048) |
View Progress
|
View Layout |
View Photos
|
31 Mar 2024 |
20690 |
View Project |
94 |
|
Jal Jeevan Mission (JJM)-WSS to Ala, Puliyoor, Budhanoor, Pandanad, Mulakkuzha, Venmony Panchayaths & Chengannur Municipality- Ala Panchayath-Supplying and laying Clear Water Gravity main from OHSR(R6) at Pennukkara to OHSR(R8) and R(9) at Puliyoor and Pandanad 400mm DI K9-6150m,350mm DI K9-450m, Construction of 15LL OHSR (R6) at Pennukkara & Supplying and Laying Distribution system Ala panchayath Zone 9 (ALPJJM102315023) |
View Progress
|
NA |
View Photos
|
Date is not specified |
20600 |
View Project |
95 |
|
Jal Jeevan Mission (JJM)-WSS to Ala, Puliyoor, Budhanoor, Pandanad, Mulakkuzha, Venmony Panchayaths & Chengannur Municipality- Cheriyanad Panchayath-Supplying & Laying Clear Water Gravity main from OHSR(R6) at Pennukkara to OHSR(R11) at Thiruthimel 250mm DI K9-3600m) & Construction of 3.65LL capacity OHSR (R11) at Thuruthimel (ALPJJM102315028) |
View Progress
|
NA |
View Photos
|
Date is not specified |
20600 |
View Project |
96 |
|
Jal Jeevan Mission (JJM)-WSS to Ala, Puliyoor, Budhanoor, Pandanad, Mulakkuzha, Venmony Panchayaths & Chengannur Municipality- Pandanad Panchayath-Supplying and laying Clear Water Gravity main from Puliyoor block Jn. to Pandanad OHSR 250mm DI K9-4600m , Construction of 8.00LL OHSR (R9) at Pandanad And Supplying and Laying Distribution system Pandanad panchayath Zone 12 (ALPJJM102315026) |
View Progress
|
NA |
View Photos
|
Date is not specified |
20600 |
View Project |
97 |
|
Jal Jeevan Mission (JJM)-WSS to Ala, Puliyoor, Budhanoor, Pandanad, Mulakkuzha, Venmony Panchayaths & Chengannur Municipality- Puliyoor & Budhanoor Panchayath-Construction of 16.00LL OHSR (R8) at Puliyoor, Supplying and Laying Distribution system Budhanoor and Puliyoor Panchayath Zone 10&11 And Railway Push through Work at Kulikkampalam (ALPJJM102315027) |
No Updates
|
NA |
No Updates
|
Date is not specified |
20600 |
View Project |
98 |
|
Jal Jeevan Mission (JJM)-WSS to Ala, Puliyoor, Budhanoor, Pandanad, Mulakkuzha, Venmony Panchayaths & Chengannur Municipality- Venmony Panchayath-Supplying and Laying Distribution system Venmony Panchayath Zone 6 (ALPJJM102315025) |
View Progress
|
NA |
View Photos
|
Date is not specified |
20600 |
View Project |
99 |
|
JJM-Water supply scheme to Puthencruz,Thiruvaniyoor,Poothrikka and Chottanikkara panchayaths (EKMJJM052211793) |
View Progress
|
View Layout |
View Photos
|
31 Mar 2024 |
20390 |
View Project |
100 |
|
JJM-Phase 2 CWSS to Moopainad, Meppadi and Vythiri Panchayaths in Wayanad District Phase II (CLTJJM092111006) |
View Progress
|
View Layout |
View Photos
|
24 Sep 2024 |
20277 |
View Project |
101 |
|
KIIFB-WSS to Ala, Puliyoor, Budhanoor, Pandanad, Mulakkuzha, Venmony Panchayaths and Chengannur Municipality (ALPKIIFB0919495) |
No Updates
|
View Layout |
No Updates
|
30 Jun 2023 |
19913 |
View Project |
102 |
|
JJM- WSS to Mattathur, Varandarappilly, Kodakara (Part 2) and Alagappanagar (Part ) - Panchayaths in Thrissur District - Production Components-Construction of 9m dia Intake well cum Pump house-General Civil Work-1 (TCRJJM052215593) |
No Updates
|
NA |
No Updates
|
06 May 2024 |
19451 |
View Project |
103 |
|
Jal Jeevan Mission 2021-22-Supplying,laying,testing and commissioning of Distribution networkand providing FHTCs(3723 Nos) and road restoration in Ananganadi panchayath (PKDJJM12206151) |
View Progress
|
View Layout |
View Photos
|
31 Aug 2024 |
18781 |
View Project |
104 |
|
Jal Jeevan Mission 2021-22- Supplying, laying, Testing and commissioning of Distribution network and providing FHTCs ( 5412Nos) and road restoration works in Chalavara panchayath (PKDJJM122012589) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2024 |
18781 |
View Project |
105 |
|
JJM 2021-22 and State plan - Construction of 22mld WTP, 21LL OHSR, 5LL GLSR, 12 LL OHSR, Clear water pumping mains etc for Cherpullassery, Ananganady, Chalavara and Thrikkadeeri (PKDGOK07218181) |
No Updates
|
View Layout |
No Updates
|
31 Dec 2024 |
18781 |
View Project |
106 |
|
JJM - WSS to Pallickkal Madavoor and Navaikulam Phase II (TVMJJM022212539) |
No Updates
|
NA |
No Updates
|
31 Mar 2024 |
18326 |
View Project |
107 |
|
JJM WSS to Mankulam Adimaly and Pallivasal (Part) Panchayath in Idukki District (IDKJJM022211081) |
View Progress
|
NA |
View Photos
|
23 Aug 2024 |
17600 |
View Project |
108 |
|
WSS to Karadka, Kumbadaje and Delampdy (KGDJJM052215871) |
View Progress
|
NA |
View Photos
|
Date is not specified |
17569 |
View Project |
109 |
|
JJM-WSS To Aikkaranadu, Mazhuvannoor & Kunnathunadu Panchayaths (EKMJJM052211095) |
No Updates
|
NA |
No Updates
|
Date is not specified |
17143 |
View Project |
110 |
|
JJM-2020-21- CWSS to Thachanattukara, Alanallur& Kottoppadam Panchayaths in Palakkad District- Phase-II (PKDJJM09203312) |
View Progress
|
View Layout |
View Photos
|
23 Jan 2025 |
16563 |
View Project |
111 |
|
JJM-WSS To Vengola & Rayamangalam Panchayaths (EKMJJM052211096) |
View Progress
|
View Layout |
View Photos
|
31 Mar 2024 |
16524 |
View Project |
112 |
|
JJM - WSS to Irinjalakuda Municipality and Muriyad and Velookara Panchayaths in Thrissur District. (TCRJJM022213475) |
No Updates
|
View Layout |
No Updates
|
31 Dec 2023 |
16488 |
View Project |
113 |
|
Jal Jeevan Mission - CWSS to Mavelikkara and adjoining Panchayaths-Supplying and Laying of Distribution Network and giving FHTC for Chettikulangara Panchayath (ALPJJM052211954) |
View Progress
|
NA |
View Photos
|
31 Mar 2024 |
15990 |
View Project |
114 |
|
JJM - 2020 -21 -Phase ll to Chalavara,Anaganadi,Thrikkadeeri panchayaths in Palakkad District- Providing FHTC's (6229 nos) in Thrikkadeeri panchayath (PKDJJM122012654) |
View Progress
|
View Layout |
View Photos
|
12 Sep 2024 |
15919 |
View Project |
115 |
|
JJM - WSS to Kallar, Panatahady pts and Karivedakam Village in Kuttikol Panchayath (KGDJJM052215917) |
View Progress
|
NA |
View Photos
|
Date is not specified |
15397 |
View Project |
116 |
|
JAL JEEVAN MISSION -2020-2021 (Phase I & II) – Providing FHTCs in Balussery, Kayakkodi, Kuttiyadi , Nadapuaram , Nanminda, Naripatta, Thuneri, Valayam, Vanimel Grama Panchayath in Kozhikode District (CLTJJM09209019) |
View Progress
|
View Layout |
View Photos
|
30 Mar 2023 |
15299 |
View Project |
117 |
|
Jal Jeevan Mission (JJM)-5th SWSM : WSS to Mylapra, Malayalappuzha and Vadasserikkara Panchayaths - Construction of 9 MLD WTP at Maniyar -General Civil Work (PTAJJM052216072) |
No Updates
|
NA |
No Updates
|
03 Jan 2025 |
15241 |
View Project |
118 |
|
Jal Jeevan Mission (JJM)-5th SWSM : WSS to Mylapra, Malayalappuzha and Vadasserikkara Panchayaths - Construction of 9 MLD WTP at Maniyar -General Civil Work (PTAJJM052216073) |
No Updates
|
NA |
No Updates
|
03 Jan 2025 |
15241 |
View Project |
119 |
|
JJM - Kannur District - WSS to Ulikkal Panchayath - Construction of WTP and Reservoirs, Supplying and laying pumping main, transmission mains and distribution network, Supply and erection of pump sets and providing FHTCs in Ulikkal Panchayath (KNRJJM022213302) |
View Progress
|
View Layout |
View Photos
|
31 Mar 2024 |
14900 |
View Project |
120 |
|
JJM 2021-24-Aryanadu Uzhamalakkal panchayaths Phase-III (TVMJJM022114627) |
View Progress
|
NA |
View Photos
|
12 Mar 2025 |
14639 |
View Project |
121 |
|
JJM- WSS to vengoor, Asamannoor & Mudakkuzha panchayaths-providing distribution system and FHTCs (EKMJJM02229201) |
View Progress
|
View Layout |
View Photos
|
31 Mar 2024 |
14197 |
View Project |
122 |
|
CWSS to Nedumkunnam , Kangazha & Karukachal Panchayath in Kottayam District - Phase 3 (KTMJJM092114989) |
View Progress
|
NA |
View Photos
|
11 Sep 2024 |
14047 |
View Project |
123 |
|
JJM -Providing FHTC to All House holds of Muttom and Karimkunnam Panchayath in Idukki District and Extension of Distribution lines (IDKJJM08208412) |
View Progress
|
NA |
View Photos
|
31 Mar 2025 |
13451 |
View Project |
124 |
|
JJM 2021-24-Phase 3 (3rd & 5th SLSSC)-CWSS to Kallara,Pangode,Pullampara,Panavoor and Vembayam(SLSSC 3 -1305800000.00, SLSSC 5 - 27486000.00), (1305800000.00+27486000.00 = 1333286000.00). (TVMJJM092110502) |
View Progress
|
View Layout |
View Photos
|
15 Mar 2025 |
13333 |
View Project |
125 |
|
Jal Jeevan Mission (JJM) - WSS to Konni-Aruvappulam- Kalanjoor (PTAJJM052216161) |
No Updates
|
NA |
No Updates
|
18 Jul 2025 |
13294 |
View Project |
126 |
|
JJM-Augmentation to ARWSS to Bharanikkavu, Thekkekkara, Vallikunnam and Krishnapuram panchayaths-Package IV-Survey Investigation works, Construction of 6 LL OHSR and 1 LL Sump at Padayanivattom in Vallikunnam Panchayath, Supplying laying 400 mm DI Clear Water Transmission main from Kattanam to OHSR, Supplying laying ditribution network and providing FHTC in Vallikunnam Panchayath (ALPJJM08207718) |
View Progress
|
View Layout |
View Photos
|
31 May 2022 |
13291 |
View Project |
127 |
|
Jal Jeevan Mission (JJM)- JJM - Phase II - Providing balance FHTC by Retrofitting/Augmentation of existing Water Supply Scheme in Nanminda Grama Panchayath.-Providing online boosting station and FHTC at Mannathaparapurayil Munnurkkayil and Mavilakkunnu colony in Ward No : 16 of Nanminda Grama Panchayath. (CLTJJM082015830) |
View Progress
|
NA |
View Photos
|
Date is not specified |
13230 |
View Project |
128 |
|
JJM 2023-24 -CWSS to Panavoor, Pullampara, Vembayam ,Pangodu and Kallara panchayaths (TVMJJM092115542) |
No Updates
|
NA |
No Updates
|
Date is not specified |
13085 |
View Project |
129 |
|
JJM-Augmentation of ARWSS to Bharanikkavu, Thekkekkara, Vallikunnam and Krishnapuram Panchayath-Package II-Survey investigation works, Construction of 9LL OHSR for Bharanikkavu and Krishnapuram Panchayth and providing FHTC in Bharanikkavu Panchayath (ALPJJM08207721) |
View Progress
|
View Layout |
View Photos
|
30 Dec 2022 |
13051 |
View Project |
130 |
|
JJM-Augmentation of ARWSS to Bharanikkavu, Thekkekkara, Vallikunnam and Krishnapuram Panchayaths Package III-and providing FHTC in Krishnapuram Panchayath (ALPJJM08207719) |
View Progress
|
View Layout |
View Photos
|
30 Dec 2022 |
13051 |
View Project |
131 |
|
State Plan - Interim Augmentation of WSS to Kochi City & adjoining areas - 143 MLD Water treatment plant (EKMGOK09218108) |
No Updates
|
NA |
No Updates
|
31 Dec 2023 |
13000 |
View Project |
132 |
|
JJM - WSS to Devikulam and Chinnakanal Panchayath in Idukki District (IDKJJM052211085) |
View Progress
|
NA |
View Photos
|
30 Apr 2025 |
12947 |
View Project |
133 |
|
Jal Jeevan Mission - Kulanada & Mezhuveli Panchayat (PTAJJM022212140) |
No Updates
|
View Layout |
No Updates
|
31 Dec 2024 |
12886 |
View Project |
134 |
|
JJM-Kannur District-WSS to Kottiyur,Kelakam and Kanichar Panchayaths-Laying Distribution system and Providing FHTCs -ZoneII &III (KNRJJM092114201) |
View Progress
|
View Layout |
View Photos
|
30 Sep 2024 |
12850 |
View Project |
135 |
|
JJM-Kannur District-WSS to Kottiyur,Kelakam and Kanichar Panchayaths-Laying Distribution system from WTP and Providing FHTCs -ZoneIV &V (KNRJJM092214220) |
View Progress
|
View Layout |
View Photos
|
31 Oct 2024 |
12850 |
View Project |
136 |
|
JJM-Kannur District-WSS to Kottiyur,Kelakam and Kanichar Panchayaths-PHASE II -High levelZone VI&VII (KNRJJM092115762) |
View Progress
|
NA |
View Photos
|
31 Dec 2024 |
12850 |
View Project |
137 |
|
JJM-Kannur District-WSS to Kottiyur,Kelakam and Kanichar Panchayaths-Laying Distribution system from WTP and Providing FHTCs -Zone I (KNRJJM09218490) |
View Progress
|
View Layout |
View Photos
|
30 Jun 2024 |
12845 |
View Project |
138 |
|
JJM - Kasaragod District - Chengala Panchayath- WSS to Chengala, Muliyar , Madhur and Mogral Puthur Panchayaths - Reach 7 (Zone 5&6)-Laying Distribution system and providing FHTCs- from the new OHSRs at Cherkala and Indiranagar Colony. (KGDJJM092110786) |
View Progress
|
NA |
View Photos
|
31 Mar 2024 |
12720 |
View Project |
139 |
|
JJM - Kasaragod District -Muliyar and Chengala Panchayaths- WSS to Chengala, Muliyar , Madhur and Mogral Puthur Panchayaths - Reach 6(Zone 2)-Laying Distribution system and providing FHTCs- from OHSR at Boikkanam.. (KGDJJM092110792) |
View Progress
|
NA |
View Photos
|
31 Mar 2024 |
12720 |
View Project |
140 |
|
JJM - Kasaragod District -Muliyar Panchayath- WSS to Chengala, Muliyar , Madhur and Mogral Puthur Panchayaths - Reach 1(Zone 1)-Laying Distribution system and providing FHTCs- from OHSR at Iriyenni. (KGDJJM072110789) |
View Progress
|
NA |
View Photos
|
30 Nov 2023 |
12720 |
View Project |
141 |
|
JJM-Phase 2 CWSS Thariode, Pozhuthana, Kottathara, Vegapalli Panchayaths in Wayanad District Phase II (CLTJJM092111007) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2023 |
12502 |
View Project |
142 |
|
JJM (2021-24)-CWSS to Peringamala Grama panchayat (TVMJJM022212328) |
View Progress
|
NA |
View Photos
|
31 Dec 2023 |
12317 |
View Project |
143 |
|
Jal Jeevan Mission- WSS to Thrikkaruva, Panayam, Perinad & Mundroethuruth (KLMJJM09218562) |
View Progress
|
View Layout |
View Photos
|
31 Oct 2023 |
12135 |
View Project |
144 |
|
KIIFB- WSS TO KOYILANDY MUNICIPALITY (CLTKIIFB032215609) |
View Progress
|
NA |
View Photos
|
20 Jan 2025 |
12000 |
View Project |
145 |
|
NABARD-RIDF-XXIV-WSS to Seethathode & Perunadu Panchayats (Nilackal)-Phase II (PTANABARD1219604) |
No Updates
|
View Layout |
No Updates
|
17 Nov 2023 |
12000 |
View Project |
146 |
|
Jal Jeevan Mission - (jjm) - JJM phase II : Water supply Improvements - JJM Phase 2 Kanjirappally package 3 - Water supply improvements General civil work. (KTMJJM022215622) |
No Updates
|
NA |
No Updates
|
Date is not specified |
11995 |
View Project |
147 |
|
Jal Jeevan Mission (JJM)-JJM - WSS to Aloor and Kodakara (Part I) Panchayaths in Thrissur District (TCRJJM052113909) |
View Progress
|
View Layout |
View Photos
|
12 Jul 2024 |
11931 |
View Project |
148 |
|
JJM: CWSS to Vamanapuram, Nellanad and Manickal panchayaths, Phase - I and II (TVMJJM09218505) |
No Updates
|
View Layout |
No Updates
|
31 Dec 2023 |
11870 |
View Project |
149 |
|
JJM-WSS to Amballoor, Edakkattuvayal, Maneed, Mulamthuruthy panchayaths in Ernakulam District - Providing FHTCs in all Households (EKMJJM092111040) |
No Updates
|
View Layout |
No Updates
|
Date is not specified |
11846 |
View Project |
150 |
|
JJM-WSS to Ramamangalam Marady and Pampakuda (EKMJJM022211001) |
No Updates
|
View Layout |
No Updates
|
31 Mar 2024 |
11843 |
View Project |
151 |
|
Jal Jeevan Mission (JJM)-Jal Jeevan Mission (JJM)- Kannur District - Kankol Alapadamba and Karivellur Peralam Grama Panchayat-WSS to Trikaripur and adjoining panchayat -Reach 6&7-Construction of 13.20 LL and 6.00LL Ohsrs at Koolippara and Kuttapunna, Supplying and laying distribution system, transmission main and pumping main , providing FHTCs, PWD road reformation etc. -Pipeline Work (KNRJJM09219463) |
View Progress
|
NA |
View Photos
|
16 Sep 2024 |
11704 |
View Project |
152 |
|
JJM- Kasaragod District- WSS to Puthige Panchayat and Bela Neerchal villages in Badiyadukka Panchayat (KGDJJM092110996) |
View Progress
|
NA |
View Photos
|
31 Dec 2024 |
11685 |
View Project |
153 |
|
JJM - RWSS to Munnar and Pallivasal Panchayath in Idukki District (IDKJJM09218253) |
View Progress
|
NA |
View Photos
|
30 Apr 2025 |
11560 |
View Project |
154 |
|
Jal Jeevan Mission-2020-21 – CWSS to Muthuthala, Parathur and Thiruvegappura Grama panchayaths (PKDJJM12207645) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2024 |
11519 |
View Project |
155 |
|
Jal Jeevan Mission (JJM)- Jal Jeevan Mission (JJM)- ( Vandazhy HL) WSS to Vandazhi and Kizhakkenchery-DESIGN, CONSTRUCTION, COMMISSIONING,TRIAL RUNNING AND MAINTENANCE OF 14 LL OHSR AT KAVULUPARA, 12LL OHSR AT PALAKUZHY, SUPPLYING, LAYING, TESTING, COMMISSIONING AND MAINTANENCE OF CLEAR WATER PUMPING MAIN AND CLEAR WATER GRAVITY MAINS, SUPPLY AND ERECTION OF CLEAR WATER PUMPSETS, SUPPLYING, LAYING, TESTING AND COMMISSIONING OF DISTRIBUTION SYSTEM ALONG WITH PROVIDING FHTCs IN KIZHAKKANCHERY, VADAKKANCHERY AND KANNAMBRA PANCHAYATHS INCLUDING AND ROAD RESTORATION WORKS.-General Civil Work (PKDJJM022215618) |
View Progress
|
NA |
View Photos
|
31 Dec 2024 |
11467 |
View Project |
156 |
|
JJM-WSS To Chenneerkara And Omalloor Panchayaths (PTAJJM022010781) |
View Progress
|
View Layout |
View Photos
|
28 Dec 2023 |
11385 |
View Project |
157 |
|
JJM NEDUVATHOOR-WSS TO NEDUVATHOOR GP (KLMJJM022210498) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2024 |
11314 |
View Project |
158 |
|
JJM-2022-2023 WSS to Pananchery, Puthur and Madakkathara Panchayaths-Providing distribution network and FHTC to Puthur Panchayath (TCRJJM052113960) |
No Updates
|
View Layout |
No Updates
|
15 Sep 2024 |
11252 |
View Project |
159 |
|
AMRUT 1.0-Kozhikode Water Supply Project-Providing FHTCs and Pipe Line extension (CLTAMRUT032313801) |
View Progress
|
NA |
View Photos
|
31 Dec 2024 |
11133 |
View Project |
160 |
|
AMRUT 2.0 -Block N-TSS BLOCK N Ulloor -Collection and Conveyance system and pumping station, pumps and electrical installation and Pumping main (Block –N) (TVMAMRUT 2020314432) |
View Progress
|
NA |
View Photos
|
02 Aug 2025 |
10986 |
View Project |
161 |
|
KIIFB Project: Tranche 13: WRD004-02- lmprovements to WSS of Kondotty Municipality- Phase-ll (MLPKIIFB0619570) |
No Updates
|
View Layout |
No Updates
|
31 Mar 2023 |
10870 |
View Project |
162 |
|
CWSS to Pallickal Panchayath (PTAJJM092116169) |
No Updates
|
NA |
No Updates
|
Date is not specified |
10600 |
View Project |
163 |
|
22 AMRUT ATAL MISSION FOR REJUVENATION AND URBAN TRA(75)-AMRUT-Augmentation of WSS in Kollam Corporation(8518) (KLMAMRUT0917464) |
View Progress
|
View Layout |
View Photos
|
30 Jun 2023 |
10442 |
View Project |
164 |
|
JJM- Valavannur GP-Providing house connections from ongoing scheme(WSS to valavannur and Kalpakancheri) to Valavannur panchayath (MLPJJM08202859) |
No Updates
|
View Layout |
No Updates
|
21 Dec 2022 |
10430 |
View Project |
165 |
|
JJM-2022-23 WSS to Madakkathara Panchayath -Providing Distribution Network and FHTC to Pananchery Panchayath (TCRJJM052213966) |
No Updates
|
View Layout |
No Updates
|
17 Sep 2024 |
10355 |
View Project |
166 |
|
JJM - CWSS to Pramadom & V.Kottayam villages. (PTAJJM052210782) |
View Progress
|
View Layout |
View Photos
|
29 Feb 2024 |
10281 |
View Project |
167 |
|
Jal Jeevan Mission (JJM)-Jal Jeevan Mission (JJM)-Jal Jeevan Mission - Kasaragod District -WSS to Kumbala and Mangalpady Panchayath (KGDJJM092115874) |
View Progress
|
NA |
View Photos
|
Date is not specified |
10211 |
View Project |
168 |
|
JJM- Kasaragod District- WSS to Kumbala and Mangalpady Panchayats (KGDJJM092110997) |
No Updates
|
NA |
No Updates
|
Date is not specified |
10211 |
View Project |
169 |
|
Jal Jeevan Mission (JJM)-RWSS to Cherukole-Naranganam-Construction of 4LL OHSR at Thonnyamala (PTAJJM092115993) |
No Updates
|
NA |
No Updates
|
28 Jun 2024 |
10174 |
View Project |
170 |
|
KIIFB special Investment package - WRD010-05-WSS to Tanur Municipality and adjoining 4 panchayaths (MLPKIIFB0117518) |
View Progress
|
View Layout |
View Photos
|
08 Apr 2024 |
10000 |
View Project |