AMRUT 1.0-Kozhikode Water Supply Project-Providing FHTCs and Pipe Line extension

Project AMRUT 1.0-Kozhikode Water Supply Project-Providing FHTCs and Pipe Line extension
Project Code CLTAMRUT032313801
Type Main project
Funding Agency AMRUT
Category AMRUT
Type of scheme Water Supply
Scheme AMRUT
Description AMRUT 1.0-Kozhikode Water Supply Project-Providing FHTCs and Pipe Line extension
Status Completed
District Kozhikkode
Executing Office Kozhikode PH Dn
AS Amount (Rs) 1113300000
AS Number G.O.(Rt)No.523/2023/LSGD
TS Amount (Rs) 1077581782
TS Number 15792/2022-23
Total Bill Submitted (Rs) 0
Total Bill Paid (Rs)
Population Benefitted 132590
Capacity in MLD 174.00
Actual Project Completion Date 30 Nov 2024
Coverage No. of FHTCs Proposed-26518 nos.

Packages

No. Project Name Location View
1 AMRUT-1.0 - Completion of JICA pipe line work, Replacing old and obsolete pipelines, Extension of pipe lines and providing FHTCs in various divisions under Kozhikode-Ward 68-Pipeline Work Kozhikode Dist 1 Sn 2
2 AMRUT 1.0-Extension of existing pipe line, Replacement of old pipe lines, construction of valve chamber, providing Household connection and replacement of existing connections under Distribution sub division NO.I, Kozhikode Kozhikode Dist 1 Sn 1
3 AMRUT- 1.0 - KOZHIKODE WATER SUPPLY PROJECT - Balamandiram Zone III-Pipeline Extension and Providing FHTCs in Paroppadi,Vellimadukunnu, Poolakadavu Wards -Pipeline Work Kozhikode Dist SubDn2 Sn 4
4 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - Balamandiram Zone -II-Old AC Pipeline Replacement along Pallithazham Chelavoor Road and Providing FHTCs by extension in Chelavoor ,Moozhikkal wards -Pipeline Work Kozhikode Dist SubDn2 Sn 4
5 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - Balamandiram Zone IV-Pipeline Extension and Providing FHTC in Chevarambalam,Civil station wards -Pipeline Work Kozhikode Dist Sn 4
6 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT- CHERUVANNUR ZONE-COMPLETION OF JICA PIPE LINE WORK EXTENSION OF PIPE LINE IN FEROKE OLD BRIDGE ROAD-160MM PVC-Pipeline Work Kozhikode Dist 1 Sn 1
7 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT-CHERUVANNUR ZONE -COMPLETION OF JICA PIPE LINE WORK EXTENTION OF PIPE LINE IN CHERUVANNUR KOLATHARA ROAD-Pipeline Work Kozhikode Dist 1 Sn 1
8 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT-CHERUVANNUR ZONE-COMPLETION OF JICA PIPE LINE WORK Replacing damaged 250 mm PVC pipeline in CHERUVANNUR BEYPORE ROAD with 500 meter 250 mm PVC 10 kg and Providing and laying 75mm PVC pipes in various locations in Ward No.41 to 46-Pipeline Work Kozhikode Dist 1 Sn 1
9 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT-CHERUVANNUR ZONE -EXTENSION OF PIPE LINE IN VARIOUS WARDS (WARD NO 40 TO 46).-Pipeline Work Kozhikode Dist 1 Sn 1
10 AMRUT 1.0-Kozhikode Water Supply Project- Cheruvannur Zone - Laying of 250mm DI K9 pipe through Major Sandeep Unnikrishnan road Kozhikode Dist 1 Sn 1
11 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT-CHERUVANNUR ZONE- Railway line crossing by push through at CHERUVANNUR SANDEEP UNNIKRISHNAN ROADPipeline Work Kozhikode Dist 1 Sn 1
12 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT- completion of JICA pipe line work.Replacing old and obsolete pipelines, extention of pipe lines and providing FHTCin various divisions under Kozhikode-WARD:72 Pipe line wok-Pipeline Work Kozhikode Dist 1 Sn 2
13 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - ELATHUR ZONE-Pipe line work-Pipeline Work-1-Replacing old and obsolete pipelines, extention of pipe lines 160 MM PVC and providing FHTCin various divisions Kozhikode Dist 2 Sn 1
14 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - ELATHUR ZONE-Providing FHTC-Pipeline Work-1-110 MM PVC Kozhikode Dist 2 Sn 1
15 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - ELATHUR ZONE-Providing FHTC-Pipeline Work-1-90 MM PVC Kozhikode Dist 1 Sn 1
16 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - ERAVATHKUNNU NORTH ZONE-EXTENSION AND REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING FHTC IN CORPORATION ROAD AT METHOTTUTHAZHAM, THAPPALLI BALAN ROAD , NELLIPPAKUNNU AND POTHANCHERI MEETHAL-Pipeline Work Kozhikode Dist 1 Sn 2
17 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - ERAVATHKUNNU NORTH ZONE-EXTENSION AND REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING FHTC IN CORPORATION ROADS WARD 30 (KOMMERI)-Pipeline Work Kozhikode Dist 1 Sn 2
18 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - ERAVATHKUNNU NORTH ZONE-EXTENSION AND REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING FHTC IN CORPORATION ROADS ( WARD 33 -KINASSERI)-Pipeline Work Kozhikode Dist 1 Sn 2
19 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - ERAVATHKUNNU NORTH ZONE-EXTENSION AND REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING FHTC IN PWD ROADS POKKUNNU TO KADUPINI-Pipeline Work Kozhikode Dist 1 Sn 2
20 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - ERAVATHKUNNU NORTH ZONE-PROVIDING FHTCs BY EXTENDING DISTRIBUTION LINES IN WARD 32 (POKKUNNU)-Pipeline Work Kozhikode Dist 1 Sn 2
21 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT- ERAVATHUKUNNU SOUTH ZONE-LAYING NEW PIPE LINES AND PROVIDING FHTC AT VARIOUS PLACES UNDER SECTION 3/1 WEST HILL KOZHIKODE .-Pipeline Work Kozhikode Dist 1 Sn 3
22 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT-ERAVATHUKUNNU SOUTH ZONE-REPLACING EXISTING AC PIPE AT VARIOUS PLACES(KOVILAKAM ROAD,MCR ROAD AND PARAVA RESIDENCE ROAD)-Pipeline Work Kozhikode Dist 1 Sn 2
23 AMRUT-1.0-Kozhikode Water Supply Project -Extension of Pipeline and Providing FHTCs in Various Locations Under Section II/II-Pipeline Work Kozhikode Dist 2 Sn 2
24 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - KOVOOR ZONE-EXTENSION AND REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING FHTC IN CORPORATION ROADS - KOVOOR -DEVAGIRI ROAD-Pipeline Work Kozhikode Dist 1 Sn 2
25 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - KOVOOR ZONE-EXTENSION AND REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING FHTC IN CORPORATION ROADS (WARD 18- MAYANAD)-Pipeline Work Kozhikode Dist 1 Sn 2
26 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - KOVOOR ZONE-EXTENSION AND REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING FHTC IN CORPORATION ROADS (WARD 22 - KOVOOR )-Pipeline Work Kozhikode Dist 1 Sn 2
27 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - KOVOOR ZONE-EXTENSION AND REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING FHTC IN CORPORATION ROADS (WARD 24 - KUDILTHODE )-Pipeline Work Kozhikode Dist 1 Sn 2
28 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - KOVOOR ZONE-EXTENSION AND REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING FHTC IN CORPORATION ROADS (WARDS 19 - MEDICAL COLLEGE SOUTH ,20 - MEDICAL COLLEGE AND 29 - POTTAMMEL )-Pipeline Work Kozhikode Dist 1 Sn 2
29 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - KOVOOR ZONE-EXTENSION AND REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING FHTC IN CORPORATION ROADS (WARDS 21 - CHEVAYUR AND 23- NELLIKKODE )-Pipeline Work Kozhikode Dist 1 Sn 2
30 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - KOVOOR ZONE-EXTENSION AND REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING FHTC IN CORPORATION ROADS (WARDS 28 KUTHIRAVATTOM AND WARD 31 - KUTTIYILTHAZHAM )-Pipeline Work Kozhikode Dist 1 Sn 2
31 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - KOVOOR ZONE-EXTENSION AND REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING FHTC IN PWD ROADS WARD 22 - KOVOOR AND WARD 18 MAYANAD-Pipeline Work Kozhikode Dist 1 Sn 2
32 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - KOVOOR ZONE-EXTENSION AND REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING FHTC IN PWD ROADS WARD 29 - POTTAMMEL AND WARD 31 - KUTTIYILTHAZHAM-Pipeline Work Kozhikode Dist 1 Sn 2
33 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - KOVOOR ZONE-PROVIDING AND LAYING PIPE LINE AND BOOSTER PUMPING FROM EXISTING 160MM HDPE LINE AT NOONJIYIL WARD 31-Pipeline Work Kozhikode Dist 1 Sn 2
34 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - KOVOOR ZONE-REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING FHTC IN PWD ROADS IN MADATHIL MUKKU NELLIKKODE-Pipeline Work Kozhikode Dist 1 Sn 2
35 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - POTTAMMEL ZONE-EXTENSION AND REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING FHTC IN CORPORATION ROADS WARD 25 - KOTTOOLI-Pipeline Work Kozhikode Dist 1 Sn 2
36 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - POTTAMMEL ZONE-EXTENSION AND REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING FHTC IN CORPORATION ROADS ( WARD 27 - PUTHIYARA and WARD 28 - KUTHIRAVATTOM)-Pipeline Work Amount for which Technical Sanction Issued 8964000.00 Kozhikode Dist 1 Sn 2
37 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - POTTAMMEL ZONE-EXTENSION AND REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING FHTC IN PWD ROADS PATTERI - MAVOOR ROAD - PUTHIYARA-Pipeline Work Kozhikode Dist 1 Sn 2
38 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - POTTAMMEL ZONE-PROVIDING FHTCs BY EXTENDING DISTRIBUTION LINES IN CORPORATION ROADS - WARD 26 - PARAYANCHERI -Pipeline Work Kozhikode Dist 1 Sn 2
39 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - POTTAMMEL ZONE-REPLACEMENT OF DISTRIBUTION PIPELINE AND PROVIDING BALANCE FHTC IN VARIOUS WARDS (Mayilambadi Govindapuram Valayanad Manchakkalthodu)-Pipeline Work Kozhikode Dist 1 Sn 2
40 AMRUT-1.0-Kozhikode Water Supply Project-Providing Booster facility at Malaparambu to improve water supply to Providence college area-Pipeline Work Kozhikode Dist 2 Sn 2
41 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT -Providing FHTC By Extension And Replacing Pipeline At Revenue Ward -2,34-Pipeline Work Kozhikode Dist 2 Sn 2
42 AMRUT-1.0-Kozhikode Water Supply Project-Providing FHTCs by Extension of pipe line in Ward 08-Pipeline Work Kozhikode Dist 2 Sn 2
43 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT-Providing FHTCs for Cheruvannur Zone-Pipeline Work Kozhikode Dist 1 Sn 1
44 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT-Providing FHTCs for Pottammal Zone-Pipeline Work Kozhikode Dist 1 Sn 2
45 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT-PROVIDING FHTCs IN BEYPORE ZONE -Pipeline Work Beypore RWS Sn
46 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT-REPLACEMENT OF OLD AND DAMAGED 225 MM CI PIPE WITH 200mm DI PIPE LINE FROM PUTHIYARA OLD KATHIRIYA HOTEL JUNCTION TO KALLUTHANKADAVVU JUNCTION.-Pipeline Work Kozhikode Dist 1 Sn 1
47 AMRUT 1.0 -Kozhikode Water Supply Project-Replacing 400mm Premo pipe line from Annie Hall Road to Pushpa Junction with 400mm DI K9 Pipe Kozhikode Dist 1 Sn 1
48 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT-Replacing 400 mm premo pipe line from Puthiyapalam Junction to Kalluthan kadavu with 400 mm DI K9 pipe - Pipeline Work Kozhikode Dist 1 Sn 1
49 AMRUT-1.0 KOZHIKODE WATER SUPPLY PROJECT-Replacing Damaged AC pipe and Providing FHTCs at Thanneerpanthal Kundooparamba Road-Pipeline Work Kozhikode Dist 2 Sn 2
50 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT-- Replacing old and damaged 100mm and 150mm AC pipe with 110mm and 160mm PVC at various locations under Distribution Section 1/1.-Pipeline Work Kozhikode Dist 1 Sn 1
51 AMRUT-1.0--Kozhikode Water Supply project-Replacing old and damged pipes at Electoral ward 10 and Providing FHTCs -Pipeline Work Kozhikode Dist 2 Sn 2
52 AMRUT- 1.0 - KOZHIKODE WATER SUPPLY PROJECT - Replacing old and obsolete pipelines, extension of pipe lines and providing FHTCs in REVENUE WARD 1-Pipeline Work Kozhikode Dist 2 Sn 1
53 AMRUT- 1.0 - KOZHIKODE WATER SUPPLY PROJECT - Replacing old and obsolete pipelines, extension of pipe lines and providing FHTCs in REVENUE WARD 3-Pipeline Work Kozhikode Dist 2 Sn 1
54 AMRUT- 1.0 - KOZHIKODE WATER SUPPLY PROJECT - Replacing old and obsolete pipelines, extension of pipe lines and providing FHTCs in St. Vincent Colony Road-Pipeline Work Kozhikode Dist 2 Sn 2
55 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT -Replacing old and obsolete pipelines, extension of pipe lines and providing FHTCs in WARD 38-Pipeline Work Kozhikode Dist 1 Sn 3
56 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - Replacing old and obsolete pipelines, extension of pipe lines and providing FHTCs in WARD 39-Pipeline Work Kozhikode Dist 1 Sn 3
57 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT-Replacing old and obsolete pipelines, extension of pipe lines and providing FHTCs in WARD 4-Pipeline Work Kozhikode Dist 2 Sn 1
58 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT - Replacing old and obsolete pipelines, extension of pipe lines and providing FHTCs in WARD 5-Pipeline Work Kozhikode Dist 2 Sn 1
59 AMRUT- 1.0 - KOZHIKODE WATER SUPPLY PROJECT- Replacing old and obsolete pipelines, extension of pipe lines and providing FHTCs in WARD 74-Pipeline Work Kozhikode Dist 2 Sn 1
60 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT-REPLACING OLD DAMAGED PIPES AND LAYING NEW PIPE LINES IN BEYPORE ZONE -Pipeline Work Kozhikode Dist 1 Sn 3
61 AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT -Zone V-Providing FHTC in Chevayoor, Kudilthod,Mayanad and Medical College Wards -Pipeline Work Kozhikode Dist 2 Sn 1
62 AMRUT-AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT- completion of JICA pipe line work.Replacing old and obsolete pipelines, extention of pipe lines and providing FHTCin various divisions under Kozhikode-Revenue Ward 4 East side of 4th and 5th gate-Pipeline Work Kozhikode Dist 2 Sn 1
63 AMRUT-AMRUT-1.0 - KOZHIKODE WATER SUPPLY PROJECT- completion of JICA pipe line work. Replacing old and obsolete pipelines, extention of pipe lines and providing FHTCin various divisions under Kozhikode-WARD 64-Pipeline Work Kozhikode Dist 2 Sn 1
64 AMRUT-Amrut 1 extension work-Laying HDPE pipe through HDD from Iringaadanpally bypass junction to Medical college-Pipeline Work Kozhikode Aug Med Col Sn
65 AMRUT-Medical College-AMRUT 1 - Laying 355 mm HDPE pipe from Iringaadanpally bypass junction to Medical college as alternate water supply-Pipeline Work Kozhikode Dist 1 Sn 2
66 AMRUT-Pipe line extension and old ac pipe replacing work at Panikkar road ,choyunni master road -Pipe line extension -AMRUT 1-Pipeline Work Kozhikode Dist 2 Sn 1

Overall Project Status

Status Date Overall Project Status Project Officer Contact
01 Dec 2024 Amrut 1 works completed under this office Malaparamba Aug-Med Sn - AE
01 Jan 2025 Not under this office Malaparamba Aug-Med Sn - AE
30 Mar 2023 Tendered Kozhikode PH Dn EE
27 Mar 2023 Tendered Kozhikode PH Dn EE
24 Mar 2023 Work tendered. Kozhikode PH Dn EE

No project review have been added to this project

Duration & Sanction dates

Date of start of Project 24/03/2023
Scheduled date of Completion of the Project 31 Dec 2025
Expected date of Completion 31/12/2025