KIIFB -Kuttanad Drinking Water Project Phase II in Alappuzha District

Project KIIFB -Kuttanad Drinking Water Project Phase II in Alappuzha District
Project Code ALPKIIFB0619635
Type Main project
Funding Agency KIIFB
Category KIIFB
Type of scheme Water Supply
Scheme KIIFB
Description Project covers the 13 panchayaths in Kuttanad Thaluk with source from Pampa river,30MLD water treatment plant at Neerettupuram, OHSR at 13 panchayths,Transmission lines and distribution network.
Status On-going
District Alappuzha
Executing Office KIIFB Projects (ALP)
AS Amount (Rs) 2895400000
AS Number WRD 025-29/APR-6/2019/KIIFB
TS Amount (Rs)
TS Number
Total Bill Submitted (Rs) 223500000
Total Bill Paid (Rs) 223500000
Population Benefitted 212783
Capacity in MLD 30.00
Actual Project Completion Date Date is not specified
Coverage 13 panchayaths in Kuttanad Thaluk
Implementation Schedule Download
Work Plan Download

Packages

No. Project Name Location View
1 KIIFB -Kuttanad Drinking Water Project Package VII- Construction of OHSR and distribution network at Ramankary, Champakulam, with online chlorine booster at Ramankary OH tank site and rehabilitation of existing OHSR at Ramankary KIIFB Projects(ALP)
2 KIIFB -Kuttanad Drinking Water Project Package - VIII- Construction of OHSR and distribution network at Nedumudy & Kainakary with online chlorine booster at Kainakary OH tank site and rehabilitation of existing OHSR at Nedumudi & Kainakary. KIIFB Projects(ALP)
3 KIIFB -Kuttanad Drinking Water Project Phase II in Alappuzha District, Package-I KIIFB Projects(ALP)
4 KIIFB -Kuttanad Drinking Water Project Phase II in Alappuzha District - Package-II KIIFB Projects(ALP)
5 KIIFB -Kuttanad Drinking Water Project Phase II in Alappuzha District, Package-III KIIFB Projects(ALP)
6 KIIFB -Kuttanad Drinking Water Project Phase II in Alappuzha District, Package-IV KIIFB Projects(ALP)
7 KIIFB -Kuttanad Drinking Water Project Phase II in Alappuzha District, Package-V KIIFB Projects(ALP)
8 KIIFB -Kuttanad Drinking Water Project Phase II in Alappuzha District, Package-VI KIIFB Projects(ALP)
9 KIIFB -Kuttanad Drinking Water Project Phase II in Alappuzha District- Urgent laying of transmission and distribution lines along Alappuzha - Changanasserry road in connection with construction of semi Elevated Highway KIIFB Projects(ALP)
10 KIIFB-Kuttanad WSS-Package 9-Construction of 4.75Lakhs Liters OHSR at Veeyapuram & Construction of Staff Quarters and office building at Edathua KIIFB Projects(ALP)

Overall Project Status

Status Date Overall Project Status Project Officer Contact
25 May 2023 Construction of 30MLD WTP and allied work tendered and single offer received. Package 4,5 work tendered and no offer received, Package 2 work tendered with due date 8/06/2023 . DPR for additional financial sanction for Rs. 98.37 crores was submitted on 03-10-2022. The file is under consideration by KIIFB. The wetland conversion process is pending at the LSGD directorate for Veeyapuram Panchayath. An amount of Rs. 21.80 crores was deposited to KSTP for the laying of the pipeline along AC road and work is about to start by KSTP through M/s ULCCS. On 18-3-2023 MD inspected the land acquired for the construction of proposed 30 MLD Water treatment plant and proposed intake structure and source at Nerettupuram. The drawings were verified.MD KWA explained the details and time lines regarding KIIFB Kuttanad WSS and the Action Plan on Jal Jeevan Mission works in the 13 Panchayaths of Kuttanad WSS Project. Honb’le MLA also pointed out the bottle necks in the pipe laying works along AC Road as part of KSTP Work and visited AC Road site. Kottayam Project Dn AEE2 KIFFB
11 Apr 2023 Package 1 – Construction of 30MLD WTP and allied works tendered on 14-03-2023 with due date 17-04-2023, Package 4,5 TS issued and Package 2 submitted for TS . DPR for additional financial sanction for Rs. 98.37 crores was submitted on 03-10-2022. The file is under consideration by KIIFB. The wetland conversion process is pending at the LSGD directorate for Veeyapuram Panchayath. An amount of Rs. 21.80 crores was deposited to KSTP for the laying of the pipeline along AC road and work is about to start by KSTP through M/s ULCCS. On 18-3-2023 MD inspected the land acquired for the construction of proposed 30 MLD Water treatment plant and proposed intake structure and source at Nerettupuram. The drawings were verified.MD KWA explained the details and time lines regarding KIIFB Kuttanad WSS and the Action Plan on Jal Jeevan Mission works in the 13 Panchayaths of Kuttanad WSS Project. Honb’le MLA also pointed out the bottle necks in the pipe laying works along AC Road as part of KSTP Work and visited AC Road site. Alappuzha KIIFB - AE 1
18 Mar 2023 Package 1 – Construction of 30MLD WTP and allied works tendered on 14-03-2023 with due date 04-04-2023, Package 2,4,5 estimates submitted for TS. DPR for additional financial sanction for Rs. 98.37 crores was submitted on 03-10-2022. The file is under consideration by KIIFB. The wetland conversion process is pending at the LSGD directorate for Veeyapuram Panchayath. An amount of Rs. 21.80 crores was deposited to KSTP for the laying of the pipeline along AC road and work is about to start by KSTP through M/s ULCCS. Alappuzha KIIFB - AEE 1
17 Mar 2023 Package 1 – Construction of 30MLD WTP and allied works tendered on 14-03-2023, Package 2,4,5 estimates submitted for TS . DPR for additional financial sanction for Rs. 98.37 crores was submitted on 03-10-2022. The file is under consideration of KIIFB. The wet land conversion process is pending at LSGD directorate for Veeyapuram Panchayath. An amount of Rs. 21.80 crores was deposited to KSTP for laying of pipe line along AC road and work is about to start by KSTP through M/s ULCCS. Alappuzha KIIFB - AE 1
24 Jan 2023 Estimates are ready for TS with designs. The meeting held on 01-08-2022 decided to arrange the tender as single package for the entire project. Based on the decision of meeting the DPR for additional financial sanction for Rs. 98.37 crores was submitted on 03-10-2022. The file is under consideration of KIIFB. The meeting held on 10-01-2023 at KIIFB office in presence of Hon'ble MLA Kuttanadu, it was decided to submit the estimate for TS for Package 1. The estimate will be submitted for TS with approved design from WASCON on 25-01-2023. The wet land conversion process is pending at LSGD directorate for Veeyapuram Panchayath and at Agriculture Production Commissioner office for Pulinkunnu Panchayath. An amount of Rs. 21.80 crores was deposited to KSTP for laying of pipe line along AC road and work is about to start by KSTP through M/s ULCCS Alappuzha KIIFB - AEE 1

No project review have been added to this project

Duration & Sanction dates

Date of start of Project 25/06/2019
Scheduled date of Completion of the Project 31 Dec 2022
Expected date of Completion 31/12/2023

Processing Dates

AS Date 25 Jun 2019

Other details

Project Officers View