JJM - Construction & Commissioning of Production Componenets and Providing FHTCs in Mampad Pt

Project JJM - Construction & Commissioning of Production Componenets and Providing FHTCs in Mampad Pt
Project Code MLPJJM092112617
Type Main project
Funding Agency JJM
Category JJM
Type of scheme Water Supply
Scheme 4215-01-102-92-02
Description Package 2C - 7146
Status On-going
District Malappuram
Executing Office Malappuram PH Dn
AS Amount (Rs) 3228000000
AS Number GO (Rt.)No. 489/2021/WRD
TS Amount (Rs) 636770000
TS Number 17615/2021-2022,18009/2021-2022,17613/2021-2022 , 8818/2022-2023
Total Bill Submitted (Rs) 0
Total Bill Paid (Rs) 0
Population Benefitted 8000
Capacity in MLD 8.00
Actual Project Completion Date Date is not specified
Coverage Mampad pt
Implementation Schedule Download
Work Plan Download

Packages

No. Project Name Location View
1 JJM Phase - II WSS to Mampad : Package - 2B : CW Pump set, Multy Stage Boosting Pump with GLSR and OHSR Manjeri PH Sn
2 JJM PHASE -II WSS TO MAPAD PACKAGE -1 A :SOURCE IMPROVEMENT, RW PUMPSET AND PUMPING MAIN, WASH WATER DIPOSAL LINE, RETAINING WALLAT INTAKE, SHIFT ROOM AT INTAKE , TRANSFORMER AND ALLIED WOR Manjeri PH Sn
3 WSS to Mampad phase II - Distribution system and Providing FHTCs- Package 2C Manjeri PH Sn

Overall Project Status

Status Date Overall Project Status Project Officer Contact
17 May 2023 Package A: Work of Retaining wall near well ongoing. The construction of collection well stopped due to rise in water level in upstream of odayikkal WCB. The collecting well and infiltration gallery could have been completed by this time if contractor has obeyed oral instructions from this office to speed those works in river. Piling works to construct shift room carried out Package B: 3 rd part bill submited.1. The work of reservoirs at Kurishu jn, veetttikunn and madam colonies are progressing Package C: 4th part bill submitted for the pipe supply of 7784 m , PE 100 PN 8 140 mm HDPE, DI 300 mm K9 of 4544 m, 250 mm DI k9 of 671 m and for laying of 90 mm HDPE Pn 8 for which testing of pipes has been carried out. Details of pipe supply 90 mm PE 100 PN 8 - 125000/175368 m 90 mm PE 100 PN 10 - 2786/2786 90 mm PE 100 PN 12.5 - 1106/1106 m 110 mm PE 100 PN 8 - 4744/4744 m 110 mm PE 100 PN 10 - 785/785 m 75 mm PVC 10 kg/cm2 - 12600 m/12600 m 63 mm PVC 10 kg/cm2 - 12600/ 12600 m Bill submitted for pipe supply. 350mm DI K9 -650m/1707m, 250mm DI K9- 2400m/2915m ,200 mm DI K9- 4500m /11151m. 3rd part bill submitted. pipe laying started. Pressure testing of pipe lines pending 7 Manjeri AE
11 Apr 2023 Package 2C: 4th part bill prepared for the pipe supply of 7784 m , PE 100 PN 8 140 mm HDPE, DI 300 mm K9 of 4544 m, 250 mm DI k9 of 671 m and for laying of 90 mm HDPE Pn 8 for which testing of pipes has been carried out. Manjeri AE
11 Mar 2023 Package A: Work of Retaining wall near well started. The construction of collection well progressing. The work of collecting well stopped as the water level at river increased due to storing of water at upstream of odayikkal WCB. The collecting well and infiltration gallery could have been completed by this time if contractor has obeyed oral instructions from this office to speed those works in river Package B: 150 mm DI K9 of 2040 m for pumping main supplied by contractor and bill submitted. The work of reservoirs at Kurishu jn & veetttikunn commenced. Twonpart bills submitted Package C: Details of pipe supply 90 mm PE 100 PN 8 - 125000/175368 m 90 mm PE 100 PN 10 - 2786/2786 90 mm PE 100 PN 12.5 - 1106/1106 m 110 mm PE 100 PN 8 - 4744/4744 m 110 mm PE 100 PN 10 - 785/785 m 75 mm PVC 10 kg/cm2 - 12600 m/12600 m 63 mm PVC 10 kg/cm2 - 12600/ 12600 m Bill submitted for pipe supply. 350mm DI K9 -650m/1707m, 250mm DI K9- 2400m/2915m ,200 mm DI K9- 4500m /11151m. 3rd part bill submitted. pipe laying started. Pressure testing of pipe lines pending 7 Manjeri AE
09 Mar 2023 Details of pipe supply 90 mm PE 100 PN 8 - 125000/175368 m 90 mm PE 100 PN 10 - 2786/2786 90 mm PE 100 PN 12.5 - 1106/1106 m 110 mm PE 100 PN 8 - 4744/4744 m 110 mm PE 100 PN 10 - 785/785 m 75 mm PVC 10 kg/cm2 - 12600 m/12600 m 63 mm PVC 10 kg/cm2 - 12600/ 12600 m Bill submitted for pipe supply. 350mm DI K9 -650m/1707m, 250mm DI K9- 2400m/2915m ,200 mm DI K9- 4500m /11151m. Third part bill for package 2C submitted. pipe laying started. Pressure testing of pipe lines pending Manjeri AE
01 Mar 2023 Details of pipe supply 90 mm PE 100 PN 8 - 125000/175368 m 90 mm PE 100 PN 10 - 2786/2786 90 mm PE 100 PN 12.5 - 1106/1106 m 110 mm PE 100 PN 8 - 4744/4744 m 110 mm PE 100 PN 10 - 785/785 m 75 mm PVC 10 kg/cm2 - 12600 m/12600 m 63 mm PVC 10 kg/cm2 - 12600/ 12600 m Bill submitted for pipe supply. 350mm DI K9 -650m/1707m, 250mm DI K9- 2400m/2915m ,200 mm DI K9- 4500m /11151m Bill under preparation . pipe laying started. Pressure testing of pipe lines pending Manjeri AE

No project review have been added to this project

Duration & Sanction dates

Date of start of Project 03/09/2022
Scheduled date of Completion of the Project 02 Sep 2023
Expected date of Completion 02/09/2023

Processing Dates

AS Date 18 Sep 2021
TS Date 11 Jan 2022