AMRUT 2.0 -Block N-TSS BLOCK N Ulloor -Collection and Conveyance system and pumping station, pumps and electrical installation and Pumping main (Block –N)
Project |
AMRUT 2.0 -Block N-TSS BLOCK N Ulloor -Collection and Conveyance system and pumping station, pumps and electrical installation and Pumping main (Block –N) |
Project Code |
TVMAMRUT 2020314432 |
Type |
Main project |
Funding Agency |
AMRUT 2 |
Category |
AMRUT 2 |
Type of scheme |
Water Supply |
Scheme |
|
Description |
AMRUT 2.0 -Block N-TSS BLOCK N-Construction of sewer Pumping station at Kollavila in Block N Ulloor-Sewerage Work |
Status |
On-going |
District |
Thiruvananthapuram |
Executing Office |
Trivandrum Project Dn |
AS Amount (Rs) |
1098600000
|
AS Number |
GO(Rt) No 431/2023/LSGD |
TS Amount (Rs) |
405758000 |
TS Number |
347/2023-2024 |
Total Bill Submitted (Rs) |
|
Total Bill Paid (Rs) |
256000 |
Population Benefitted |
2000 |
Capacity in MLD |
|
Actual Project Completion Date |
09 Jul 2024 |
Coverage |
Ulloor and Kesavadasapuram wards |
Packages
No. |
Project Name |
Location |
View |
1 |
AMRUT 2.0 -Block N-Providing Sewer lines for branch sewers to the collection mains of Block N -Providing branch sewers in Parottukonam - 2nd reach-Sewerage Work |
Trivandrum Project Dn |
|
2 |
AMRUT 2.0 -Providing Sewer lines for branch sewers to the collection mains of Block N - Providing branch sewers in Puliyaravilakom line |
Trivandrum Project Dn |
|
3 |
AMRUT-AMRUT 2.0 - Block N-Providing Sewer lines for branch sewers to the collection mains of Block N -Providing branch sewers in E.K Nayanar road-Sewerage Work |
Trivandrum Project Dn |
|
4 |
AMRUT-AMRUT 2.0 -Block N-Providing Sewer lines for branch sewers to the collection mains of Block N -Providing branch sewers in Mosque Lane-Sewerage Work |
Trivandrum Project Dn |
|
5 |
AMRUT-AMRUT 2.0 -Block N-Providing Sewer lines for branch sewers to the collection mains of Block N -Providing branch sewers in Parottukonam - Fourth reach-Sewerage Work-Sewerage Work |
Trivandrum Project Dn |
|
6 |
AMRUT-AMRUT 2.0 -Block N-Providing Sewer lines for branch sewers to the collection mains of Block N -Providing branch sewers in Parottukonam - Third reach-Sewerage Work-Sewerage Work |
Trivandrum Project Dn |
|
7 |
AMRUT-AMRUT 2.0 -Block N-Providing Sewer lines for branch sewers to the collection mains of Block N -Providing branch sewers in Thoppil Lane and Chathanpara Lane-Sewerage Work |
Trivandrum Project Dn |
|
8 |
AMRUT-AMRUT 2.0 -Block N-TSS BLOCK NConstruction of sewer Pumping station at Kollavila in Block N Ulloor-Sewerage Work |
Trivandrum Project Dn |
|
Overall Project Status
Status Date |
Overall Project Status |
Project Officer |
Contact |
13 May 2024 |
Kollavila P/S - Well steining and Grit chamber 4th lift has been completed. Grit chamber partition wall and baffle walls a height of 3.20m concreted. PCC for grit chamber concrete completed and bottom plugging concrete complete.grit chamber long wall beam concrete completed.16.4.2024. 800 mm RCC pipe arrived . Grit chamber partition wall a height of 1.10m concreted. grit chamber 5th lift concrete completed at 27.4.2024 . partition wall concrete completed. Grit chamber plastering work progressing. PACKAGE 2: Puliyaravilakom lane-Work order issued on 09/06/2023. Pipe supplied on 18/07/2023. 200mm SW pipe240m laid out of 525m. interlock paving work completed .9 manhole work Completed and 3 manhole work partilly completed and pipe laying work progressing. . PACKAGE 3: E.K. Nayanar road -Work order issued on 04/08/2023.Pipe supplied on 29/09/2023. 250mm HDPE pipe 646m laid out of 710m .MH work and balance pipe cutting from inside MH are in progress. PACKAGE 4: Parottukonam-4rth reach: Work order issued on 01/08/2023.Pipe supplied on 04/10/2023. Manholes Cover slab construction work completed. 300mm SW pipe 245m laid out of 344.40m.5 manhole fully completed and 7manhole partially completed and pipe laying work progressing and 13th manholecover fixing work progressing . PACKAGE 5: Parottukonam-3rd reach: Work order issued on 10/08/2023. Pipe supplied on 04/10/2023. 110 mm PVC pipes arrived at site on 10/11/2023. Manholes cover slab construction completed. 300mm SW pipe 300m laid out of 344.40m.14 Mh constructed,PIPE LAYING work completted. Road clearance works progressing .road pavement work progressing. . PACKAGE 6: Parottukonam-2nd reach: Work order issued on 04/08/2023.SW pipe arrived on 04/10/2023. casting of 13 MH cover completed. 110mm pvc pipe replacement work progressing ,28m laid- 7) MOSQUE lane:-manhole construction work progressing and trial pit takken . 8) Thoppil Lane and Chathanpara Lane:-200 mm SW pipe jointing work are completed . 200mm SW pipe 150m laid out of 429m. pipe laying progressing and 4 manhole work partially completed. |
Thiruvananthapuram Project AE9 |
|
10 May 2024 |
Kollavila P/S - Well steining and Grit chamber 4th lift has been completed. Grit chamber partition wall and baffle walls a height of 3.20m concreted. PCC for grit chamber concrete completed and bottom plugging concrete complete.grit chamber long wall beam concrete completed.16.4.2024. 800 mm RCC pipe arrived . Grit chamber partition wall a height of 1.10m concreted. grit chamber 5th lift concrete completed at 27.4.2024 . partition wall concrete completed. Grit chamber plastering work progressing. PACKAGE 2: Puliyaravilakom lane-Work order issued on 09/06/2023. Pipe supplied on 18/07/2023. 200mm SW pipe240m laid out of 525m. interlock paving work completed .9 manhole work Completed and 3 manhole work partilly completed and pipe laying work progressing. . PACKAGE 3: E.K. Nayanar road -Work order issued on 04/08/2023.Pipe supplied on 29/09/2023. 250mm HDPE pipe 646m laid out of 710m .MH work and balance pipe cutting from inside MH are in progress. PACKAGE 4: Parottukonam-4rth reach: Work order issued on 01/08/2023.Pipe supplied on 04/10/2023. Manholes Cover slab construction work completed. 300mm SW pipe 245m laid out of 344.40m.5 manhole fully completed and 7manhole partially completed and pipe laying work progressing and 13th manhole work progressing . PACKAGE 5: Parottukonam-3rd reach: Work order issued on 10/08/2023. Pipe supplied on 04/10/2023. 110 mm PVC pipes arrived at site on 10/11/2023. Manholes cover slab construction completed. 300mm SW pipe 300m laid out of 344.40m.14 Mh constructed,PIPE LAYING work completted. Road clearance works progressing .. . PACKAGE 6: Parottukonam-2nd reach: Work order issued on 04/08/2023.SW pipe arrived on 04/10/2023. casting of 13 MH cover completed. 110mm pvc pipe replacement work progressing ,28m laid- 7) MOSQUE lane:-manhole construction work progressing and trial pit takken . 8) Thoppil Lane and Chathanpara Lane:-200 mm SW pipe jointing work are completed . 200mm SW pipe 150m laid out of 429m. pipe laying progressing and 4 manhole work partially completed. |
Thiruvananthapuram Project AE9 |
|
08 May 2024 |
Kollavila P/S - Well steining and Grit chamber 4th lift has been completed. Grit chamber partition wall and baffle walls a height of 3.20m concreted. PCC for grit chamber concrete completed and bottom plugging concrete complete.grit chamber long wall beam concrete completed.16.4.2024. 800 mm RCC pipe arrived . Grit chamber partition wall a height of 1.10m concreted. grit chamber 5th lift concrete completed at 27.4.2024 . partition wall concrete completed.Deshuttering work and grit chamber plastering work progressing. PACKAGE 2: Puliyaravilakom lane-Work order issued on 09/06/2023. Pipe supplied on 18/07/2023. 200mm SW pipe231m laid out of 525m. interlock paving work completed .manhole work progressing. MH plastering work progressing. PACKAGE 3: E.K. Nayanar road -Work order issued on 04/08/2023.Pipe supplied on 29/09/2023. 250mm HDPE pipe 646m laid out of 710m .MH work and balance pipe cutting from inside MH are in progress. PACKAGE 4: Parottukonam-4rth reach: Work order issued on 01/08/2023.Pipe supplied on 04/10/2023. Manholes Cover slab construction work completed. 300mm SW pipe 245m laid out of 344.40m.5 manhole fully completed and 6manhole partially completed and pipe laying work progressing .Trench work progressing for pipe laying. PACKAGE 5: Parottukonam-3rd reach: Work order issued on 10/08/2023. Pipe supplied on 04/10/2023. 110 mm PVC pipes arrived at site on 10/11/2023. Manholes cover slab construction completed. 300mm SW pipe 290m laid out of 344.40m.13 Mh constructed,PIPE LAYING work progressing. Road clearance works progressing .. . PACKAGE 6: Parottukonam-2nd reach: Work order issued on 04/08/2023.SW pipe arrived on 04/10/2023. casting of 13 MH cover completed. 110mm pvc pipe replacement work progressing ,28m laid- 7) MOSQUE lane:-manhole construction work progressing. 8) Thoppil Lane and Chathanpara Lane:-200 mm SW pipe jointing work are completed . sewerage pipe line trench work progressing and manhole construction work progressing.MH plastering work are in progressing. |
Thiruvananthapuram Project AE9 |
|
03 May 2024 |
Kollavila P/S - Well steining and Grit chamber 4th lift has been completed. Grit chamber partition wall and baffle walls a height of 3.20m concreted. PCC for grit chamber concrete completed and bottom plugging concrete complete.grit chamber long wall beam concrete completed.16.4.2024. 800 mm RCC pipe arrived . Grit chamber partition wall a height of 1.10m concreted. grit chamber 5th lift concrete completed at 27.4.2024 . PACKAGE 2: Puliyaravilakom lane-Work order issued on 09/06/2023. Pipe supplied on 18/07/2023. 200mm SW pipe231m laid out of 525m. interlock paving work completed .manhole work progressing. PACKAGE 3: E.K. Nayanar road -Work order issued on 04/08/2023.Pipe supplied on 29/09/2023. 250mm HDPE pipe 646m laid out of 710m .MH work and balance pipe cutting from inside MH are in progress. PACKAGE 4: Parottukonam-4rth reach: Work order issued on 01/08/2023.Pipe supplied on 04/10/2023. Manholes Cover slab construction work completed. 300mm SW pipe 245m laid out of 344.40m.5 manhole fully completed and 6manhole partially completed and pipe laying work progressing . PACKAGE 5: Parottukonam-3rd reach: Work order issued on 10/08/2023. Pipe supplied on 04/10/2023. 110 mm PVC pipes arrived at site on 10/11/2023. Manholes cover slab construction completed. 300mm SW pipe 290m laid out of 344.40m.13 Mh constructed,PIPE LAYING work progressing.. . PACKAGE 6: Parottukonam-2nd reach: Work order issued on 04/08/2023.SW pipe arrived on 04/10/2023. casting of 13 MH cover completed. 110mm pvc pipe replacement work progressing ,28m laid- 7) MOSQUE lane:-manhole construction work progressing. 8) Thoppil Lane and Chathanpara Lane:-200 mm SW pipe jointing work are completed . sewerage pipe line trench work progressing and manhole construction work progressing. |
Thiruvananthapuram Project AE9 |
|
27 Apr 2024 |
Kollavila P/S - Well steining and Grit chamber 4th lift has been completed. Grit chamber partition wall and baffle walls a height of 3.20m concreted. PCC for grit chamber concrete completed and bottom plugging concrete complete.grit chamber long wall beam concrete completed.16.4.2024. 800 mm RCC pipe arrived . Grit chamber partition wall a height of 1.10m concreted. grit chamber 5th lift concrete completed at 27.4.2024 . PACKAGE 2: Puliyaravilakom lane-Work order issued on 09/06/2023. Pipe supplied on 18/07/2023. 200mm SW pipe231m laid out of 525m. interlock paving work completed .manhole work progressing. PACKAGE 3: E.K. Nayanar road -Work order issued on 04/08/2023.Pipe supplied on 29/09/2023. 250mm HDPE pipe 646m laid out of 710m .MH work and balance pipe cutting from inside MH are in progress. PACKAGE 4: Parottukonam-4rth reach: Work order issued on 01/08/2023.Pipe supplied on 04/10/2023. Manholes Cover slab construction work completed. 300mm SW pipe 245m laid out of 344.40m.5 manhole fully completed and 6manhole partially completed and pipe laying work progressing . PACKAGE 5: Parottukonam-3rd reach: Work order issued on 10/08/2023. Pipe supplied on 04/10/2023. 110 mm PVC pipes arrived at site on 10/11/2023. Manholes cover slab construction completed. 300mm SW pipe 290m laid out of 344.40m.13 Mh constructed,PIPE LAYING work progressing.. . PACKAGE 6: Parottukonam-2nd reach: Work order issued on 04/08/2023.SW pipe arrived on 04/10/2023. casting of 13 MH cover completed. 110mm pvc pipe replacement work progressing ,28m laid- 7.MOSQUE lane:-manhole construction work progressing. |
Thiruvananthapuram Project AE9 |
|
No project review have been added to this project
Duration & Sanction dates
Date of start of Project |
06/07/2023 |
Scheduled date of Completion of the Project |
09 Aug 2024 |
Expected date of Completion |
11/09/2024 |
Processing Dates
AS Date |
19 Feb 2023 |
TS Date |
04 Apr 2023 |