Sl. No. |
Updated On |
Name of Project |
Daily Progress |
Project Layout |
Photo Album |
Scheduled date of completion |
AS Amount (in Lakhs) |
View Project |
1 |
|
JJM 2021-22 and State plan - Construction of 22mld WTP, 21LL OHSR, 5LL GLSR, 12 LL OHSR, Clear water pumping mains etc for Cherpullassery, Ananganady, Chalavara and Thrikkadeeri (PKDGOK07218181) |
No Updates
|
View Layout |
No Updates
|
12 Oct 2024 |
18781 |
View Project |
2 |
|
State Plan - Interim Augmentation of WSS to Kochi City & adjoining areas - 143 MLD Water treatment plant (EKMGOK09218108) |
No Updates
|
NA |
No Updates
|
31 Dec 2023 |
13000 |
View Project |
3 |
|
Alternate source to Thiruvananthapuram Corp - Construction of 120 MLD Water Treatment Plant near Neyyar Dam. (TVMGOK0118688) |
No Updates
|
View Layout |
No Updates
|
28 Feb 2023 |
6000 |
View Project |
4 |
|
State Plan 2010-11 - WSS to Erumeli Panchayath (KTMGOK09106017) |
No Updates
|
View Layout |
No Updates
|
31 Mar 2023 |
5300 |
View Project |
5 |
|
Interim Augmentation of WSS to Kochi City & adjoining panchayaths (EKMGOK1019473) |
No Updates
|
View Layout |
No Updates
|
31 Mar 2023 |
5000 |
View Project |
6 |
|
Jal Jeevan Mission(JJM)-JJM-Phase 3-CWSS to Edappal and adjoining Panchayath-BT Road Restoration Works of Panchayath Roads in Kaladi Panchayth. (MLPGOK022214185) |
No Updates
|
NA |
No Updates
|
Date is not specified |
4416 |
View Project |
7 |
|
CWSS to Puramattom, Kalloopara, Ezhumattoor, Kunnamthanam, Eraviperoor, Koipuram,Thottapuzhassery & Panchayaths Phase I (PTAGOK0317605) |
No Updates
|
NA |
No Updates
|
31 Dec 2023 |
4235 |
View Project |
8 |
|
State plan Payyoli Municipality (CLTGOK022115686) |
No Updates
|
NA |
No Updates
|
01 Feb 2026 |
3500 |
View Project |
9 |
|
WSS To Payyoli Coastal Area In Kozhikode District (CLTGOK02217579) |
No Updates
|
NA |
No Updates
|
14 Jul 2024 |
3500 |
View Project |
10 |
|
Jal Jeevan Mission (JJM)-WSS to Kanakkary, Mulakkulam, and Njeezhoor panchayath -Ph 3 - Kanakkary-(Package - 2) (KTMGOK022215064) |
No Updates
|
NA |
No Updates
|
08 Sep 2024 |
2720 |
View Project |
11 |
|
WSS to Mallappally, Anicadu & Kottangal panchayats - Phase 2 (PTAGOK0317599) |
No Updates
|
View Layout |
No Updates
|
30 Nov 2022 |
2400 |
View Project |
12 |
|
State plan 2017-18 WSS to Maradu muncipality strengthening of the distribution system. Maradu Municipality - Various packages (EKMGOK11173885) |
No Updates
|
View Layout |
No Updates
|
31 Aug 2024 |
2316 |
View Project |
13 |
|
State Plan -2021-22-Rehabilitation/Improvement Work of UWSS- WSS to Irinjalakuda Municipality and Muriyad & Velookkara Panchayaths in Thrissur District- Package I - Part C - Construction of 22LL OHSR and 350mm DI K9 CWPM (TCRGOK092111535) |
No Updates
|
NA |
No Updates
|
Date is not specified |
1935 |
View Project |
14 |
|
State Plan Optimisation of Production and Transmission - CWSS to Vandazhi, Kizhakkenchery, Vadakkenchery and Kannambra Panchayaths in Alathur Taluk- Phase- I- Design, Construction, trial running commissioning and maintenance 24.5 MLD Water Treatment Plant & 24.50 LL OHSR, Construction of Substation, Supplying , laying, testing, commissioning and maintenance of Clear Water Pumping Main, Design, supply, erection, commissioning and maintenance of Clear Water pump sets & transformer etc– Phase I - Part I (PKDGOI0918625) |
No Updates
|
View Layout |
No Updates
|
31 Dec 2023 |
1795 |
View Project |
15 |
|
CWSS to Anadu,Kurupuzha and Palode Villages-Phase-II (TVMGOK0818664) |
No Updates
|
View Layout |
No Updates
|
03 Jun 2022 |
1600 |
View Project |
16 |
|
WSS to Vilappil panchayath-Construction of Intake Well,Supplying and Laying Raw water Pumping main,Construction of WTP and allied works ,Construction of OHSR (TVMGOK0317494) |
No Updates
|
View Layout |
No Updates
|
31 Aug 2022 |
1600 |
View Project |
17 |
|
Green Book - 2017-18 - Supplying and laying Distribution network in Venganoor Panchayath of Trivandrum District (TVMGOK0317691) |
No Updates
|
View Layout |
No Updates
|
30 Jun 2022 |
1466 |
View Project |
18 |
|
State Plan 2021-22: Implementation of the scheme- UWSS to Changanasserry - Design and construction of 15 LL capacity OHSR, Office complex and alied works at Perunna (KTMGOK012214196) |
No Updates
|
NA |
No Updates
|
16 Nov 2023 |
1000 |
View Project |
19 |
|
State plan -Construction of 27 LL OHSR,CW pump supply & erection, distribution network for Cherpulassery muncipality phase-l (PKDGOK072113918) |
No Updates
|
View Layout |
No Updates
|
12 Apr 2024 |
1000 |
View Project |
20 |
|
Budget Proposal 2021-22 -UWSS to Nedumangad-Augmentation and Improvement of water supply to Nedumangad (TVMGOK12218640) |
No Updates
|
View Layout |
No Updates
|
01 Jan 2023 |
950 |
View Project |
21 |
|
State plan-Mini WSS to Kodikunnu, Njandoorkonam Division in Thiruvananthapuram Corporation and Adjoining villages (TVMGOK07202431) |
No Updates
|
View Layout |
No Updates
|
19 May 2022 |
950 |
View Project |
22 |
|
State Plan 2022-23- TSS-Providing and Laying 400mm and 500mm PE pipe from common manhole of sewer line at Ayyankali road to Nellikuzhy (TVMGOK072212441) |
No Updates
|
View Layout |
No Updates
|
30 Jun 2024 |
700 |
View Project |
23 |
|
State Plan 18-19-UWSS Ottapalam - Replacing old and damaged DL AC/GI 80mm-300mm using 300mm DI-k9 -1250m, 160mm PVC -20290m, 150mm GI - 4020m at various locations (PKDGOK08181659) |
No Updates
|
View Layout |
No Updates
|
31 Aug 2023 |
605 |
View Project |
24 |
|
JJM (2021-22)-Phase II- Providing FHTC to all house holds by construction of borewell,OH Tank,Pumping main and distribution network and installation of pump sets etc. at Chembanaruvi ward in Piravanthoor grama panchayath (KLMGOK022212470) |
No Updates
|
NA |
No Updates
|
30 Nov 2023 |
598 |
View Project |
25 |
|
Providing FHTC to all house holds by construction of Bore well OH Tank,Pumping main and distribution network and installation of pump sets etc. at Chempanaruvi ward in Piravanthoor grama panchayath. (KLMGOK022212471) |
No Updates
|
NA |
No Updates
|
Date is not specified |
598 |
View Project |
26 |
|
STATE PLAN- 2017-18- UWSS to Aluva - Replacement of old damaged 500/400mm premo pipe (1.46 KM) with 500mm DI K9 pipe from Pump Junction to Bypass and 100mm AC pipe (4 Km) with 160mm PVC pipe (EKMGOK05173256) |
No Updates
|
View Layout |
No Updates
|
30 Sep 2022 |
575 |
View Project |
27 |
|
WSS to Pavaratty and Mullassery Panchayaths - Gravity main (TCRGOK1018615) |
No Updates
|
View Layout |
No Updates
|
30 Aug 2022 |
562 |
View Project |
28 |
|
DEPOSIT-KRFB-Hill Highway KRFB-2017-2018- Improvements to Peerumedu , Devikulam road KM 19/000 to 40/050 and Thodupuzha -Puliyanmala road KM 85/500 to 92/167 in Idukki dist. - shifting of KWA utilities (IDKGOK112215574) |
No Updates
|
NA |
No Updates
|
08 Jun 2024 |
541 |
View Project |
29 |
|
Water supply improvements to Mynagappally- Phase I- S/L clear water 200mm and 300mm DI K9 pumping main from sasthamkottah WTP to ICS OHSR and Public Market OHSR at Mynagappally, Construction of 15.2 LL OHSR at Public Market compound, S/E of 40HP( one stand by) clear water pump and motor , additional power allocation to KSEB, interconnection works at TP site solar and automation charges, road restoration charges and LS provision for demolishing old Anganvadi building and similar works (KLMGOK11194404) |
No Updates
|
View Layout |
No Updates
|
31 Aug 2022 |
510 |
View Project |
30 |
|
DEPOSIT-KRFB-Hill Highway KRFB- Shifting of KWA utilities- Marykulam-Nariyampara (IDKGOK112213313) |
No Updates
|
NA |
No Updates
|
14 Apr 2023 |
504 |
View Project |
31 |
|
KRFB- 2017-18 IMPROVEMENT TO PEERUMEDU, DEVIKULAM ROADS IN IDUKKI DIST. - SHIFTING OF KWA UTILITIES- Idukkikavala - Nariyampara (IDKGOK112213331) |
No Updates
|
NA |
No Updates
|
15 Apr 2023 |
504 |
View Project |
32 |
|
State Plan 2019 - 2020 TSS - Tertiary Treatment of Sewage at STP Muttathara. (TVMGOK06191797) |
No Updates
|
View Layout |
No Updates
|
31 Oct 2023 |
500 |
View Project |
33 |
|
State Plan 2023-24 ARWSS to Veliyannoor and adjoinig villages and ARWSS to Thalayazham and adjoining villages- 45MLD WTP, Mevelloor- Providing additional dedicated HT supply from 66 KV Sub Station Kuravilangad (KTMGOK092315665) |
No Updates
|
NA |
No Updates
|
Date is not specified |
497 |
View Project |
34 |
|
State Plan-WSS to Thiroorangadi Phase 1-Packege II(a) Construction of 9LL OHSR at Chandhapadi including balance clear water pumping main with road restoration (MLPGOK062212000) |
No Updates
|
NA |
No Updates
|
20 Sep 2024 |
482 |
View Project |
35 |
|
UWSS to Adoor & Adj: Panchayaths- Replacement of 300mm AC transmission main and Distribution main from PArakkodu Jn to High School Jn , Adoor in Kayamkulam - Punaloor Road ( KP Road) by using 300mm DIK7 Pipe (PTAGOK12147578) |
No Updates
|
NA |
No Updates
|
30 Sep 2022 |
470 |
View Project |
36 |
|
State Plan 2023-2024 Rehabilitation/improvement works of Urbar water supplu schemes -UWSS to Perinthalmanna-Water supply improvements to Muttungal-Lemon valley area and pipe line extention to various place in Perinthalmanna Muncipality Pipe line work (MLPGOK082315626) |
No Updates
|
NA |
No Updates
|
Date is not specified |
450 |
View Project |
37 |
|
STATE PLAN 2019 - RWSS to Thazhava - Replacement of old and damaged (PM) 200 mm AC 11000 m pipe with 160 mm PVC CL5 (22000m) from Manappally to Aramathumadom AVHS (4850 m), from Manappally to Mullassery Vadimukku jn (3250 m), from Manappally to Pavumba bridge (1800 m), from Pavumba bridge to Palamoodu (1100 m). (KLMGOK06194258) |
No Updates
|
View Layout |
No Updates
|
31 Mar 2024 |
415 |
View Project |
38 |
|
WSS to Pandallur- Replacing old 250mm AC pipe with 300mm DI and 200mm AC pipe with 250mm DI pipe in Pandallur Village in Malappuram District (MLPGOK082113699) |
No Updates
|
NA |
No Updates
|
Date is not specified |
415 |
View Project |
39 |
|
State plan 2022-23 -UWSS to Aluva Municipality - Replacement of old CI/AC pipes in various wards of Aluva Municipality (EKMGOK052211951) |
No Updates
|
NA |
No Updates
|
30 Jun 2024 |
410 |
View Project |
40 |
|
State Plan-WSS to Thiroorangadi Phase 1-Package 2(b) providing and laying main distribution system zone 1 including road restoration (MLPGOK062212002) |
No Updates
|
NA |
No Updates
|
17 Sep 2024 |
404 |
View Project |
41 |
|
State Plan 2023-24–CWSS to Perumbavoor and Vengola- Replacing 400mm AC Pumping main with 400mm DI K9 pipe from Vallam to Kanjirakkad Water Treatment Plant (EKMGOK052314233) |
No Updates
|
NA |
No Updates
|
Date is not specified |
400 |
View Project |
42 |
|
State Plan 2021-22 : Improvements of WSS : ARWSS to Puliyannoor Meenachil and Akalakkunnam Villages - Replacement of AC pipes in Mutholy Panchayath (KTMGOK082111730) |
No Updates
|
View Layout |
No Updates
|
31 Dec 2022 |
398 |
View Project |
43 |
|
State Plan 2021-22 TSS - D Block - Zone II - Supplying conveying and laying 700 mm dia RCC NP3 pipe sewer Trunk main II from Murinjapalam towards Kannammoola Ch. 342 M to 952 M - land acquisition cost (TVMGOK05217484) |
No Updates
|
View Layout |
No Updates
|
31 Dec 2022 |
381 |
View Project |
44 |
|
State Plan 2020-21-Pipe replacement in Peroorkada-Sasthamangalam Road in Thiruvananthapuram. (TVMGOK02217848) |
No Updates
|
View Layout |
No Updates
|
31 Dec 2022 |
369 |
View Project |
45 |
|
State Plan-2020-21-"TSS Laying 300mm dia SW Sewer main line and 250mm&200 mm dia SW pipe sewer branch lines from Kannammoola Ayyankali road proposed common MH towards Padinjattil lane" (TVMGOK09204297) |
No Updates
|
View Layout |
No Updates
|
31 Dec 2022 |
350 |
View Project |
46 |
|
Stateplan 2021-22 EMWSS-Remittance of cash deposit and power allocation charges to KSEB for commissioning the 110 KV Substation at H W .aluva. (EKMGOK06217688) |
No Updates
|
View Layout |
No Updates
|
31 Mar 2023 |
350 |
View Project |
47 |
|
WSS to Pavaratty and Mullassery Panchayaths in Chavakkad Taluk of Thrissur District - Construction of 5.50 LL capacity OHSR at Mullassery and 6.70 LL capacity OHSR at Pavaratty panchayath (TCRGOK0818505) |
No Updates
|
View Layout |
No Updates
|
20 Oct 2022 |
350 |
View Project |
48 |
|
State plan 2022-23 Optimisation of production and transmission -Replacement of pipes Replacement of Ac pipes in Palakkad muncipality (PKDGOK052212045) |
No Updates
|
View Layout |
No Updates
|
Date is not specified |
344 |
View Project |
49 |
|
Stateplan 2021-22 EMWSS - Replacing old damaged existing AC pipes in various wards in Aluva Municipality (EKMGOK06217659) |
No Updates
|
NA |
No Updates
|
31 Oct 2022 |
332 |
View Project |
50 |
|
State Plan 2023-24 Rehabilitation/improvement works of Urban Water Supply Schemes- UWSSReplacement of AC distribution Zone at Pachiakat tank in Cholera Division in Kannur Corporation (KNRGOK092314855) |
No Updates
|
NA |
No Updates
|
Date is not specified |
332 |
View Project |
51 |
|
WSS to Perinadu and Athikkayam Villages-Phase I- Remaining components (PTAGOK1217608) |
No Updates
|
View Layout |
No Updates
|
30 Nov 2022 |
331 |
View Project |
52 |
|
STATE PLAN 2018-19-EMWSS-Supply, Erection, Testing and commissioning of110 KV additional bay with consumer structure and metering units including construction of additional yard and allied works for the commissioning of 110KV substation at Head works Aluva including rehabilation of substation building (EKMGOK0818769) |
No Updates
|
View Layout |
No Updates
|
31 Mar 2023 |
315 |
View Project |
53 |
|
State Plan-2023-24 RWSS-Replacing damaged pipes- WSS to Vadakkekara and Chittatukara Panchayath - Replacing damaged (frequently bursting) 400 mm premo pumping main with 450mm and 315mm HDPE pipe, laying 160mm PVC rider line from Chittattukara junction to Chakkumassery temple junction along proposed NH 66 (EKMGOK112315080) |
No Updates
|
NA |
No Updates
|
Date is not specified |
313 |
View Project |
54 |
|
State Plan2022-23- UWSS to Manjeri - Providing dedicated line from OHSR Thadaparamba to elevated areas of Kottakundu colony, Pakal veedu.Public Health Center and Good hope school ( Buds school) at Mangalassery in Manjeri Muncipality (MLPGOK052211497) |
No Updates
|
NA |
No Updates
|
30 Apr 2023 |
312 |
View Project |
55 |
|
State Plan 2020-21 - "Source improvement of Sasthamcotta water treatment plant" - Construction of recycling plant at Sasthamcotta in Kollam District. (KLMGOK04206064) |
No Updates
|
View Layout |
No Updates
|
30 Jun 2022 |
302 |
View Project |
56 |
|
State Plan 2022-23 UWSS to Mannarkkad Phase II- Replacing the existing old and damaged AC & PVC distribution pipes in Mannarkkad Municipality, Supply and erection of 35HP vertical Turbine raw water pump set, shifting of existing house connection to the newly laid pipe lines. (PKDGOK052211461) |
No Updates
|
NA |
No Updates
|
31 May 2024 |
300 |
View Project |
57 |
|
State Plan 2023-24–UWSS to Kothamangalam- Replacement of 200mm AC distribution line with 150mm DI K9 pipe in Malayankeezhu- Nadukani road and replacement of old aged pipes in Kothamangalam Municipality (EKMGOK052314470) |
No Updates
|
NA |
No Updates
|
Date is not specified |
300 |
View Project |
58 |
|
State Plan 2023-24-UWSS to Kothamangalam- Replacement of AC pipe lines and old aged PVC pipe line in Kothamangalam municipality and allied works. (EKMGOK122315558) |
No Updates
|
NA |
No Updates
|
Date is not specified |
300 |
View Project |
59 |
|
State Plan 2023-24-UWSS to Kothamangalam- Replacement of AC pipe lines at Amabalaparambu- Valiyapara-Paraithottam road and replacement of old aged pumping line to 314 GL tank and distribution line from 314 GL tank and allied works (EKMGOK122315559) |
No Updates
|
NA |
No Updates
|
Date is not specified |
300 |
View Project |
60 |
|
State Plan-WSS to Thiroorangadi Phase 1-Package 2(c) providing and laying main distribution system Zone ll including road restoration (MLPGOK062212003) |
No Updates
|
NA |
No Updates
|
10 Oct 2024 |
285 |
View Project |
61 |
|
State Plan-WSS to Thiroorangadi Phase 1-Package I- Construction of 8LL OHSR at Ambalapadi including inter connection works (MLPGOK062211999) |
No Updates
|
NA |
No Updates
|
10 Oct 2024 |
263 |
View Project |
62 |
|
State Plan – 2023-24- Optimisation of production and transmission – Energy Conservation – Supply, Fixing and Commissioning of 845 HP VT pumpset in intake well cum pump house of JICA Assisted WSS to Pattuvam and Adjoining villages (KNRGOK072314806) |
No Updates
|
NA |
No Updates
|
31 Dec 2023 |
255 |
View Project |
63 |
|
KWA - Flood related work 2018- work under SDRF and State plan -Replacing old&damaged (frequently bursting after flood ) 250mm ACpumping cum distribution pipe with 300mm DIpipe -new proposal through new NH from Thiniyakavu to valluvally in Kottuvally Panchayath -Unique -ID007- WSK -M-020 (EKMGOK01193744) |
No Updates
|
View Layout |
No Updates
|
31 Oct 2023 |
240 |
View Project |
64 |
|
State Plan 2022-23-Rehabilitation/Improvement works of Urban Water Supply Schemes- UWSS -Augmentation of WSS to Paravoor Municipality and adjoining panchayaths - 63 MLD WTP at Chowara - Supply and installation of HT VT motor pumpset having discharge 2736 m3/hr and total head of 42m at RWPH and allied works (EKMGOK062211970) |
No Updates
|
View Layout |
No Updates
|
Date is not specified |
240 |
View Project |
65 |
|
State Plan 2023-24–Replacing old damaged 450mm AC pipe in Kizhakkambalam Panchayath. (EKMGOK052314227) |
No Updates
|
NA |
No Updates
|
Date is not specified |
227 |
View Project |
66 |
|
State Plan 2023-24 CWSS to Varkala and adjoining villages - Replacement of old and damaged 300 mm AC pipe with 300 mm DI K9 pipe from Kannamba to Gurunagar in Varkala Municipality. (TVMGOK092315471) |
No Updates
|
NA |
No Updates
|
Date is not specified |
226 |
View Project |
67 |
|
State Plan-Draught Relief works proposed to tackle Water stress-2022-ARWSS to Veliyannoor and adj. villages and Thalayazham and adj. villages -Rectification of damages of Back wash line in 45 MLD WTP at Mevelloor (KTMGOK112214423) |
No Updates
|
NA |
No Updates
|
Date is not specified |
220 |
View Project |
68 |
|
State Plan -2022-23- Construction of 8 LL capacity OH tank at Angadippuram Grama Panchayath. (MLPGOK052211482) |
No Updates
|
NA |
No Updates
|
31 Oct 2024 |
218 |
View Project |
69 |
|
State Plan -2022-23- Construction of 8 LL capacity OH tank at Pulamanthole Grama Panchayath. (MLPGOK052211483) |
No Updates
|
NA |
No Updates
|
31 Dec 2024 |
218 |
View Project |
70 |
|
State Plan 2021-22 TSS- E Block Zone II - Laying 630mm dia HDPE pipe sewer main from Edapazhanji to Chithra nagar first reach- Ch 1841 m to 2133 m (TVMGOK05217499) |
No Updates
|
View Layout |
No Updates
|
30 Sep 2023 |
215 |
View Project |
71 |
|
State Plan 2023-24-Energy efficiency improvement, Optimization of electromechanical items, Safety audit and ensuring safety in the operation of WTPs and Pumphouses-WSS to Anjarakandy, Peralassery and adjoining Pts-Supply and Erection of VT pumps set at Intake well cum pump house and CF pump set at booster pipe line. (KNRGOK092314830) |
No Updates
|
NA |
No Updates
|
Date is not specified |
206 |
View Project |
72 |
|
State plan 2017-2018-CWSS to Vandazhy, Vadakkenchery,Kizhakkenchery and Kannambra Panchayaths in Alathur Thaluk-Phase-I (Part II)-Supply and errection of raw water pumpsets,supplying and laying of rawwater pumping main (600mm DI K9) (PKDGOK12176050) |
No Updates
|
View Layout |
No Updates
|
30 Jun 2023 |
200 |
View Project |
73 |
|
State Plan 2021-22. Production and Transmission Improvements to MWSS to Panakkad Village in Malappuram Municipality. In Malappuram District.Laying of Raw water pumping main with 300 mm DI K9 pipe,Supply and Commission of 140 HP VT Pumpset. (MLPGOK06218588) |
No Updates
|
NA |
No Updates
|
28 Feb 2023 |
200 |
View Project |
74 |
|
State Plan 2022-23-UWSS to Kothamangalam- Laying 200mm DI K9 pipe from Kollikkad OH Tank to Vilayal Sump at Kothamangalam Municipality (EKMGOK052214473) |
No Updates
|
NA |
No Updates
|
Date is not specified |
200 |
View Project |
75 |
|
STATE PLAN 2022-23-WSS to Anjarakkandy, Peralassery and adjoining panchayaths- Replacing AC main distribution line from GLSR Mathukoth in Chelora & Valiyannur Division under Kannur Corporation. (KNRGOK052211641) |
No Updates
|
NA |
No Updates
|
Date is not specified |
200 |
View Project |
76 |
|
STATE PLAN 22-23 - PROVIDING NEW WATER SUPPLY LINES ALONG BOTH SIDES OF VAZHUTHACAUD TO EDAPAZHINJI ROAD UNDER VAZHUTHACAUD WARD (TVMGOK052211413) |
No Updates
|
NA |
No Updates
|
Date is not specified |
190 |
View Project |
77 |
|
State plan 2021-22 optimisation of production and transmission - renovation of WTP and energy conservation-WSS to Palakkad renovation of 9MLD and 12.5MLD WTP (PKDGOK06217565) |
No Updates
|
NA |
No Updates
|
31 Dec 2022 |
181 |
View Project |
78 |
|
State Plan - 2020-21-TSS- E- Block Zone II -Laying 700mm dia RCC NP3 pipe sewer main from Jagathy towards common manhole Ch.512m to 785m & Interconnection of 700mm dia DI pipe between Jagathy Chadiyara sewer main and parallel main across Killi river and constructing 450mm dia board cast in situ piles inside of river and connected works.Ch.649m to 679m. (TVMGOK10206732) |
No Updates
|
View Layout |
No Updates
|
31 Mar 2024 |
181 |
View Project |
79 |
|
State Plan 2022-23- CWSS to Methala Eriyad, Edavilangu and Kadukutty panchayath- Refurbishing existing 15 MLD WTP at Vynthala (TCRGOK052211117) |
No Updates
|
NA |
No Updates
|
19 Jan 2024 |
180 |
View Project |
80 |
|
State Plan -2022-23- Elakamon Panchayath - Replacement of existing damaged 150mm dia CI pumping main with new 250mm dia DI Pumping main from Kayalpuram pump house to Vilappuram tank under WS-1, Varkala (TVMGOK052211682) |
No Updates
|
NA |
No Updates
|
Date is not specified |
171 |
View Project |
81 |
|
Stateplan-2021-22-WSS to Thalassery Municipality-Replacing the existing 150mm AC line with 160mm PVC pipes from Illikunnu to Kolassery Junction(Both side) (KNRGOK08218281) |
No Updates
|
NA |
No Updates
|
31 Aug 2022 |
170 |
View Project |
82 |
|
2018-19- OPTIMISATION OF PRODUCTION AND TRANSMISSION: RENOVATION OF WTP- UWSS to Perinthalmanna - Dedicated KSEB power line to Water Treatment Plant at Cherukara (MLPGOK08181914) |
No Updates
|
NA |
No Updates
|
31 Oct 2022 |
160 |
View Project |
83 |
|
STATE PLAN 2022-23–OPTIMIZATION OF PRODUCTION AND TRANSMISSION -WSS to Anjarakandy, Peralassery and adjoining Panchayath-Replacing AC Distribution with DI K9 pipe at Muzhappilangad Panchayath (KNRGOK052211634) |
No Updates
|
NA |
No Updates
|
Date is not specified |
160 |
View Project |
84 |
|
State plan 2021-22-Optimization of production and Transmission - Replacement of old pipes in existing WSS - Replacing damaged 250mm PVC from Eranhippalam junction to Arayadathupalam junction along mini bypass road for a length of 3000m. (CLTGOK06217954) |
No Updates
|
NA |
No Updates
|
28 Sep 2023 |
151 |
View Project |
85 |
|
State plan 2018-19-WSS Akalakunnam, Mutholi &Kozhuvanal- Supply and erection of Raw water & Clear Water Pump set for new scheme (KTMGOK0818606) |
No Updates
|
View Layout |
No Updates
|
30 Sep 2022 |
150 |
View Project |
86 |
|
STATE PLAN 2022-23-OPTIMISATION OF PRODUCTION AND TRANSMISSION:-REPLACEMENT OF OLD PIPES IN EXISTING WSS TO TIRURANGADI MUNICIPALITY- RELAYING THE DAMAGED AND FREQUENTLY BURSTING 110MM PVC CLEAR WATER PUMPING MAIN BY 200MM DI(K9) PIPE BETWEEN WATER TREATMENT PLANT AT KARIPARAMBU AND OHSR AT CHEMMAD (MLPGOK052111992) |
No Updates
|
NA |
No Updates
|
31 Dec 2022 |
150 |
View Project |
87 |
|
State Plan 2021-22 TSS - D Block - Zone II - Supplying Conveying and Laying 700mm dia RCC NP3 pipe sewer trunk main II from Murinjapalam to Kannamoola - Ch 0 to 342m (TVMGOK05217477) |
No Updates
|
View Layout |
No Updates
|
24 Jul 2023 |
146 |
View Project |
88 |
|
State Plan-2022-23-CWSS to Varkala and adjoining Villages- Refurbishing Filtermedia (2 Nos) for treatment plant Mullasserikunnu with dual filter media Anthracite of 19 MLD Treatment Plant and other connected works at Mullasserikkunnu (TVMGOK052211681) |
No Updates
|
NA |
No Updates
|
Date is not specified |
143 |
View Project |
89 |
|
State plan 2021-22 Optimization of Production and Transmission Replacement of old pipes in Existing WSS - WSS to Puthencruz Replacement of damaged 250 mm AC pipe with 300 mm DI K9 from Choondy to Meempara in Poothrikka panchayath (EKMGOK06197691) |
No Updates
|
View Layout |
No Updates
|
31 May 2022 |
140 |
View Project |
90 |
|
STATE PLAN 20.-21- Improvements to RWSS to Manjeri-Water Supply to Veettikunnu area -Phase 2- Providing Distribution Line in Ward No.28,29,30&32 of Manjeri Municipality (MLPGOK10204653) |
No Updates
|
NA |
No Updates
|
31 Dec 2022 |
132 |
View Project |
91 |
|
State Plan 2022-23- CWSS to Varkala and adjoining villages - Extension/replacement of pipeline in various places of ward No. 1 to 11 of Navaikulam Panchayath (TVMGOK052211430) |
No Updates
|
NA |
No Updates
|
Date is not specified |
132 |
View Project |
92 |
|
State Plan-State plan -2022-23-CWSS to Navaikulam- Replacing or extension of pipe line in various place of Ward no 1 to 11 of Navaikulam panchayat.-Replacing or extension of pipe line in various place of Ward no 1 to 11 of Navaikulam panchayat.-Pipeline Work (TVMGOK052215475) |
No Updates
|
NA |
No Updates
|
Date is not specified |
132 |
View Project |
93 |
|
Stateplan-2021-22-WSS to Anjarakandy, Peralassery and adjoining Panchayaths-Replacement of old AC distribution main line from Moonnuperiya to Keezhara in Peralassery Panchayath (KNRGOK08218283) |
No Updates
|
NA |
No Updates
|
30 Jun 2022 |
131 |
View Project |
94 |
|
State Plan 2023-24-Urgent measures at 225 mld Water Treatment Plant Aluva for improving the drinking water supply to Kochi city and adjoining areas (EKMGOK092314754) |
No Updates
|
NA |
No Updates
|
Date is not specified |
130 |
View Project |
95 |
|
State Plan 2022-23- TSS-Zone II - Laying 600 mm dia RCC NP3 pipe sewer main towards Edapazhinji Chitra Nagar (IV th Reach ) Ch 2738 to 2908 m in connection with the commissioning of Jagathy Kootamvila Scheme (TVMGOK062211759) |
No Updates
|
View Layout |
No Updates
|
20 Jul 2023 |
120 |
View Project |
96 |
|
Supply and erection of Additional Raw water pump set in the intake well of WSS to Mattannur and Iritty Municipalities (KNRGOK052211331) |
No Updates
|
View Layout |
No Updates
|
05 Mar 2024 |
120 |
View Project |
97 |
|
State Plan-2023-2024 Replacing of old and damaged 150&200 mm SW sewer line with 300 mm SW sewer line from Artech Rama Appartment thorough Panickers lane F lane under Sewerage Section Sasthamangalam (TVMGOK062314704) |
No Updates
|
NA |
No Updates
|
Date is not specified |
117 |
View Project |
98 |
|
State Plan 2023- 24 Mace of WSS to Puthencuz & adjoing panchayath - world bank pump house - Supply erection, commissioning and trial run of split case centrifugal pump set and VT pump set at Choondy CWPH and Ramamangalam RWPH and allied works (EKMGOK052314396) |
No Updates
|
NA |
No Updates
|
31 Aug 2024 |
105 |
View Project |
99 |
|
State Plan 2018-19 - RWSS to Thevupara - Replacing old & damaged 140 mm PVC 6kg/cm2 pumping main, 110 mm PVC 4kg/cm2 distribution main with 160, 110 mm PVC from Thevupara to Manjadi Jn in Malayinkeezhu panchayath (TVMGOK08188088) |
No Updates
|
View Layout |
No Updates
|
31 Mar 2022 |
104 |
View Project |
100 |
|
State Plan 2022-23 UWSS to Ottapalam- Providing dedicated HT power line from KSEB substation to RWPH Meetna and WTP Kayarampara (PKDGOK052211460) |
No Updates
|
NA |
No Updates
|
31 Dec 2023 |
100 |
View Project |
101 |
|
State budget 2021-2022. RWSS to Andoorkonam- Renovation of Anathazhchira pump house and replace the damaged pipe line with new pipe. (TVMGOK02229269) |
No Updates
|
NA |
No Updates
|
31 Dec 2023 |
100 |
View Project |
102 |
|
STATE PLAN 2016-17 RWSS Pudussery shiftins distribution main passing through RLY coach factory 160 mm pvc (PKDGOK02171014) |
No Updates
|
View Layout |
No Updates
|
04 Sep 2022 |
100 |
View Project |
103 |
|
State Plan 2018-19- ARWSS to Vorkady & adjoining Panchayaths- Renovation of vented weir across Uppala river at Anakallu (KGDGOK08181372) |
No Updates
|
NA |
No Updates
|
31 May 2022 |
100 |
View Project |
104 |
|
State Plan 2019-20- RWSS to Kanhangad-replacing old damaged 200 mm Ac distribution main with 200 mm DI K9 pipe(2850m) from Ambalathungara to Chemmattam vayal. (KGDGOK06191375) |
No Updates
|
View Layout |
No Updates
|
30 Mar 2024 |
100 |
View Project |
105 |
|
State Plan 2020-21-WSS TO Edakad Zone I-Replacement of old damaged 140/110 mmPVC pipeline from Chala temple to Nambolankunnu in Chala Padinharekkara Road (KNRGOK12205888) |
No Updates
|
View Layout |
No Updates
|
07 May 2024 |
100 |
View Project |
106 |
|
State Plan 2023-24 - WSS to Manathavady Edavaka and Nallornadu villages- Replacement of old AC pipes and line extension to various places in Mananthavady Municipality (WYDGOK082314669) |
No Updates
|
View Layout |
No Updates
|
09 Sep 2024 |
100 |
View Project |