State Plan 18-19-UWSS Ottapalam - Replacing old and damaged DL AC/GI 80mm-300mm using 300mm DI-k9 -1250m, 160mm PVC -20290m, 150mm GI - 4020m at various locations

Project State Plan 18-19-UWSS Ottapalam - Replacing old and damaged DL AC/GI 80mm-300mm using 300mm DI-k9 -1250m, 160mm PVC -20290m, 150mm GI - 4020m at various locations
Project Code PKDGOK08181659
Type Main project
Funding Agency GOK
Category State plan
Type of scheme Water Supply
Scheme 2215-02-106-97
Description This project is sanctioned for replacing old pipes for UWSS Ottappalam
Status On-going
District Palakkad
Executing Office Shornur PH Dn
AS Amount (Rs) 60500000
AS Number GO No 615/2018/WRD TVM
TS Amount (Rs) 60500000
TS Number 3484/2018-2019
Total Bill Submitted (Rs) 26418235
Total Bill Paid (Rs) 26418235
Population Benefitted 50000
Capacity in MLD 13.00
Actual Project Completion Date Date is not specified
Coverage ottapalam municipality
Implementation Schedule Download
Work Plan Download

Packages

No. Project Name Location View
1 State Plan 18-19-UWSS Ottapalam - Replacing old and damaged DL AC/GI 80mm-300mm using 300mm DI-k9 -1250m, 160mm PVC -20290m, 150mm GI - 4020m at various locations Ottappalam PH Sn
2 State Plan-State Plan 2018-19- UWSS to Ottapalam - Replacement o old and damaged AC/ GI 80mm to 300mm using 300mm DI K9- 1250m, 160mm PVC - 20290m, 150mm GI-4020m at various locations in Ottapalam Municipality in Palakad District-General Civil Work-Pipeline Work-balance work Ottappalam PH Sn

Overall Project Status

Status Date Overall Project Status Project Officer Contact
21 Feb 2024 Scope of work includes replacing the old AC pipes with 160mm PVC pipe. A total length of 24992m was supplied by the contractor. 150mm GI pipes and 300mm DI pipe not supplied by the contractor. About 19.3 km 160mm PVC laid out of 25km. Laying work progress is slow in Town. Given directions to the contractor to make the necessary arrangements to speed up the work. Though repeated instruction given to contractor, he is not willing to complete the work and hence Executive Engineer & Superintendent Engineer gave letter to the contractor for completing the work immediately or else will complete the work in his risk & cost. Work terminated as per proceedings of the Superintending Engineer's office. Due to urgency of arranging work in Ottapalam Municipality, work arranged at the risk & cost of original contractor. Pending works in Ottapalam Town needed to be arranged urgently as two reaches. Laying work of two reaches in Ottapalam Town completed under the risk and cost of the previous contractor. TS for unexecuted work issued.Work tendered last date 29/01/2024 opening date 30/01/2024 Shornur PH Dn EE
15 Feb 2024 Tis is the balance work which is arranging on risk and cost of contractor of original work received As on 2018-19 which is short clossed due to contractor issue.Estmate prepared for balance work,TS issued by SE,work tendered in circle and opened on 30.01.24 ,no bid received hecne extended up to 08.02.24, Retenderd, Opening on 20/02/2024 Shornur PH Dn EE
14 Feb 2024 Tis is the balance work which is arranging on risk and cost of contractor of original work received As on 2018-19 which is short clossed due to contractor issue.Estmate prepared for balance work,TS issued by SE,work tendered in circle and opened on 30.01.24 ,no bid received hecne extended up to 08.02.24, Retenderd, Opening on 20/02/2024 Shornur PH Dn EE
06 Feb 2024 Tis is the balance work which is arranging on risk and cost of contractor of original work received As on 2018-19 which is short clossed due to contractor issue.Estmate prepared for balance work,TS issued by SE,work tendered in circle and opened on 30.01.24 ,no bid received hecne extended up to 08.02.24 Shornur PH Dn EE
05 Feb 2024 Scope of work includes replacing the old AC pipes with 160mm PVC pipe. A total length of 24992m was supplied by the contractor. 150mm GI pipes and 300mm DI pipe not supplied by the contractor. About 19.3 km 160mm PVC laid out of 25km. Laying work progress is slow in Town. Given directions to the contractor to make the necessary arrangements to speed up the work. Though repeated instruction given to contractor, he is not willing to complete the work and hence Executive Engineer & Superintendent Engineer gave letter to the contractor for completing the work immediately or else will complete the work in his risk & cost. Work terminated as per proceedings of the Superintending Engineer's office. Due to urgency of arranging work in Ottapalam Municipality, work arranged at the risk & cost of original contractor. Pending works in Ottapalam Town needed to be arranged urgently as two reaches. Laying work of two reaches in Ottapalam Town completed under the risk and cost of the previous contractor. TS for unexecuted work issued.Work tendered last date 29/01/2024 opening date 30/01/2024. Shornur PH Dn EE

No project review have been added to this project

Duration & Sanction dates

Date of start of Project 11/11/2019
Scheduled date of Completion of the Project 13 Oct 2019
Expected date of Completion 31/08/2023

Processing Dates

AS Date 20 Aug 2018
TS Date 16 Dec 2018

Other details