State Plan 18-19-UWSS Ottapalam - Replacing old and damaged DL AC/GI 80mm-300mm using 300mm DI-k9 -1250m, 160mm PVC -20290m, 150mm GI - 4020m at various locations
Project |
State Plan 18-19-UWSS Ottapalam - Replacing old and damaged DL AC/GI 80mm-300mm using 300mm DI-k9 -1250m, 160mm PVC -20290m, 150mm GI - 4020m at various locations |
Project Code |
PKDGOK08181659 |
Type |
Main project |
Funding Agency |
GOK |
Category |
State plan |
Type of scheme |
Water Supply |
Scheme |
2215-02-106-97 |
Description |
This project is sanctioned for replacing old pipes for UWSS Ottappalam |
Status |
On-going |
District |
Palakkad |
Executing Office |
Shornur PH Dn |
AS Amount (Rs) |
60500000
|
AS Number |
GO No 615/2018/WRD TVM |
TS Amount (Rs) |
60500000 |
TS Number |
3484/2018-2019 |
Total Bill Submitted (Rs) |
26418235 |
Total Bill Paid (Rs) |
26418235 |
Population Benefitted |
50000 |
Capacity in MLD |
13.00 |
Actual Project Completion Date |
Date is not specified |
Coverage |
ottapalam municipality |
Implementation Schedule |
Download |
Work Plan |
Download |
Packages
No. |
Project Name |
Location |
View |
1 |
State Plan 18-19-UWSS Ottapalam - Replacing old and damaged DL AC/GI 80mm-300mm using 300mm DI-k9 -1250m, 160mm PVC -20290m, 150mm GI - 4020m at various locations |
Ottappalam PH Sn |
|
2 |
State Plan-State Plan 2018-19- UWSS to Ottapalam - Replacement o old and damaged AC/ GI 80mm to 300mm using 300mm DI K9- 1250m, 160mm PVC - 20290m, 150mm GI-4020m at various locations in Ottapalam Municipality in Palakad District-General Civil Work-Pipeline Work-balance work |
Ottappalam PH Sn |
|
Overall Project Status
Status Date |
Overall Project Status |
Project Officer |
Contact |
21 Feb 2024 |
Scope of work includes replacing the old AC pipes with 160mm PVC pipe. A total length of 24992m was supplied by the contractor. 150mm GI pipes and 300mm DI pipe not supplied by the contractor. About 19.3 km 160mm PVC laid out of 25km. Laying work progress is slow in Town. Given directions to the contractor to make the necessary arrangements to speed up the work. Though repeated instruction given to contractor, he is not willing to complete the work and hence Executive Engineer & Superintendent Engineer gave letter to the contractor for completing the work immediately or else will complete the work in his risk & cost. Work terminated as per proceedings of the Superintending Engineer's office. Due to urgency of arranging work in Ottapalam Municipality, work arranged at the risk & cost of original contractor. Pending works in Ottapalam Town needed to be arranged urgently as two reaches. Laying work of two reaches in Ottapalam Town completed under the risk and cost of the previous contractor. TS for unexecuted work issued.Work tendered last date 29/01/2024 opening date 30/01/2024 |
Shornur PH Dn EE |
|
15 Feb 2024 |
Tis is the balance work which is arranging on risk and cost of contractor of original work received As on 2018-19 which is short clossed due to contractor issue.Estmate prepared for balance work,TS issued by SE,work tendered in circle and opened on 30.01.24 ,no bid received hecne extended up to 08.02.24, Retenderd, Opening on 20/02/2024 |
Shornur PH Dn EE |
|
14 Feb 2024 |
Tis is the balance work which is arranging on risk and cost of contractor of original work received As on 2018-19 which is short clossed due to contractor issue.Estmate prepared for balance work,TS issued by SE,work tendered in circle and opened on 30.01.24 ,no bid received hecne extended up to 08.02.24, Retenderd, Opening on 20/02/2024 |
Shornur PH Dn EE |
|
06 Feb 2024 |
Tis is the balance work which is arranging on risk and cost of contractor of original work received As on 2018-19 which is short clossed due to contractor issue.Estmate prepared for balance work,TS issued by SE,work tendered in circle and opened on 30.01.24 ,no bid received hecne extended up to 08.02.24
|
Shornur PH Dn EE |
|
05 Feb 2024 |
Scope of work includes replacing the old AC pipes with 160mm PVC pipe. A total length of 24992m was supplied by the contractor. 150mm GI pipes and 300mm DI pipe not supplied by the contractor. About 19.3 km 160mm PVC laid out of 25km. Laying work progress is slow in Town. Given directions to the contractor to make the necessary arrangements to speed up the work. Though repeated instruction given to contractor, he is not willing to complete the work and hence Executive Engineer & Superintendent Engineer gave letter to the contractor for completing the work immediately or else will complete the work in his risk & cost. Work terminated as per proceedings of the Superintending Engineer's office. Due to urgency of arranging work in Ottapalam Municipality, work arranged at the risk & cost of original contractor. Pending works in Ottapalam Town needed to be arranged urgently as two reaches. Laying work of two reaches in Ottapalam Town completed under the risk and cost of the previous contractor. TS for unexecuted work issued.Work tendered last date 29/01/2024 opening date 30/01/2024. |
Shornur PH Dn EE |
|
No project review have been added to this project
Duration & Sanction dates
Date of start of Project |
11/11/2019 |
Scheduled date of Completion of the Project |
13 Oct 2019 |
Expected date of Completion |
31/08/2023 |
Processing Dates
AS Date |
20 Aug 2018 |
TS Date |
16 Dec 2018 |