Overall Project Status

Status Date Overall Project Status Project Officer Contact
16 Aug 2022 Packages I to III & V to IX - Work Completed 100%. Package IV - Supplying, laying, Commissioning and maintaining 1219mm M.S RW Pumping Main from Intake to TP at Vasoorichira - Total laying of 1219 mm dia MS pipe 12.50 mm thickness 15919.13 m completed and 10 mm thick MS pipe 10951.37 meters completed. Out of 28130 meters of pipe-laying work 26870.50 meters of work completed. Total HYDROTEST 26035.87 meter Completed. 510 M Road concreting and Leak rectification work completed at nanthirikkal. Road restoration work completed at Pazhavara. Road Restoration work completed at (Coporation road) Punathalathazham – Vasoorichira WTP site. Package X - Augmentation of Kollam corporation - Phase l - Construction of Transformer building for Raw water, Approach road, Rubble wall for protecting Lakeshore and retaining wall at intake well site Njankadavu and Construction of transformer building for clear water pump house at Vasoorichira - Work tendered twice. Received single bid offer. Tender scrutinized at SE office and submitted to C.E on 12/01/2022. On 27/01/2022 C.E prequalified the tender. The awarded work amount was 8.5% above TPAC. However, as the quoted rate was 43.8% above TPAC, the tender was cancelled. Hence it was retendered with due date of 17/03/2022 and extended up to 24/03/2022, then to 5/4/2022 and 13/4/2022. However, no offers were received. Retender was due on 16/04/2022. No offers were received and hence tender was cancelled and revised estimate was submitted for revised TS. TS issued by CE(SR)on 07/07/22 .Work tendered with submission date 4-8-2022 and opening date 6-8-2022. Package XI - Augmentation of WSS to Kollam corporation - phase II- Package V - Supply and erection of raw water pump-set, Package VII - Supply and erection of clear water pump set, Package VIII- Automation, solar panel installation. - STC directed to re-tender the work by splitting the estimate to get better competition. In this regard, the work was split up into 3 packages. Tenders of packages V and VII opened on 4/5/2022. No offers were received. Hence the tenders extended up to 16/05/2022. Again no offer was received. Again tender was extended up to 26/05/2022. No offers were received and then again extended up to 08/06/2022. No offers were received then again extended up to 16/06/2022 . No offers were received then again extended up to 27/06/2022. No offers were received then again extended up to 8/07/2022.No offers received then again extended up to 20/07/2022. No offers were received then again extended up to 01/08/2022.Package VIII, tender sanctioned from CE's office and Seeking firm period extension from contractor from SE’s office. Package XII - Supplying, laying, Commissioning and maintaining 1016mm dia.8.8mm thick M.S Clear Water pumping main from TP to OHSR at Manichithode, 914 mm gravity main – 5360.415 m laid out of 6130m ,1016 mm clear water pumping main - 3120.955m laid out of 3835m. Hydrotesting of pipe lines - 914 mm- 5046.2m completed, 1016mm - 2944m completed. Valve chamber work 10 Nos completed, 6 Nos balance. Cathodic protection work in progress . Whole plastering work of 54LL OHSR at Manichithodu was completed and Painting work progressing. Concreting of top beam of pipe line bridge at kallupalam was completed on both sides. Concreting of T- Beam for pipe line bridge at Ayathil is completed and Cover slab(flange of T beam ) concrete completed. Pit for railway Push through work 75% completed. Kollam Project HD
05 Aug 2022 Packages I to III & V to IX - Work Completed 100%. Package IV - Supplying, laying, Commissioning and maintaining 1219mm M.S RW Pumping Main from Intake to TP at Vasoorichira - Total laying of 1219 mm dia MS pipe 12.50 mm thickness 15919.13 m completed and 10 mm thick MS pipe 10951.37 meters completed. Out of 28130 meters of pipe-laying work 26870.50 meters of work completed. Total HYDROTEST 26035.87 meter Completed. 510 M Road concreting and Leak rectification work completed at nanthirikkal. Road restoration work completed at Pazhavara. Road Restoration work completed at (Coporation road) Punathalathazham – Vasoorichira WTP site. Package X - Augmentation of Kollam corporation - Phase l - Construction of Transformer building for Raw water, Approach road, Rubble wall for protecting Lakeshore and retaining wall at intake well site Njankadavu and Construction of transformer building for clear water pump house at Vasoorichira - Work tendered twice. Received single bid offer. Tender scrutinized at SE office and submitted to C.E on 12/01/2022. On 27/01/2022 C.E prequalified the tender. The awarded work amount was 8.5% above TPAC. However, as the quoted rate was 43.8% above TPAC, the tender was cancelled. Hence it was retendered with due date of 17/03/2022 and extended up to 24/03/2022, then to 5/4/2022 and 13/4/2022. However, no offers were received. Retender was due on 16/04/2022. No offers were received and hence tender was cancelled and revised estimate was submitted for revised TS. TS issued by CE(SR)on 07/07/22 .Work tendered with submission date 4-8-2022 and opening date 6-8-2022. Package XI - Augmentation of WSS to Kollam corporation - phase II- Package V - Supply and erection of raw water pump-set, Package VII - Supply and erection of clear water pump set, Package VIII- Automation, solar panel installation. - STC directed to re-tender the work by splitting the estimate to get better competition. In this regard, the work was split up into 3 packages. Tenders of packages V and VII opened on 4/5/2022. No offers were received. Hence the tenders extended up to 16/05/2022. Again no offer was received. Again tender was extended up to 26/05/2022. No offers were received and then again extended up to 08/06/2022. No offers were received then again extended up to 16/06/2022 . No offers were received then again extended up to 27/06/2022. No offers were received then again extended up to 8/07/2022.No offers received then again extended up to 20/07/2022. No offers were received then again extended up to 01/08/2022.Package VIII, tender sanctioned from CE's office and Seeking firm period extension from contractor from SE’s office. Package XII - Supplying, laying, Commissioning and maintaining 1016mm dia.8.8mm thick M.S Clear Water pumping main from TP to OHSR at Manichithode, 914 mm gravity main – 5360.415 m laid out of 6130m ,1016 mm clear water pumping main - 3120.955m laid out of 3835m. Hydrotesting of pipe lines - 914 mm- 5046.2m completed, 1016mm - 2944m completed. Valve chamber work 10 Nos completed, 6 Nos balance. Cathodic protection work in progress . Whole plastering work of 54LL OHSR at Manichithodu was completed and Painting work progressing. Concreting of top beam of pipe line bridge at kallupalam was completed on both sides. Concreting of T- Beam for pipe line bridge at Ayathil is completed and Cover slab(flange of T beam ) concrete completed. Pit for railway Push through work 75% completed. Kollam Project HD
01 Aug 2022 Packages I to III & V to IX - Work Completed 100%. Package IV - Supplying, laying, Commissioning and maintaining 1219mm M.S RW Pumping Main from Intake to TP at Vasoorichira - Total laying of 1219 mm dia MS pipe 12.50 mm thickness 15919.13 m completed and 10 mm thick MS pipe 10951.37 meters completed. Out of 28130 meters of pipe-laying work 26870.50 meters of work completed. Total HYDROTEST 26035.87 meter Completed. 510 M Road concreting and Leak rectification work completed at nanthirikkal. Road restoration work completed at Pazhavara. Road Restoration work completed at (Coporation road) Punathalathazham – Vasoorichira WTP site. Package X - Augmentation of Kollam corporation - Phase l - Construction of Transformer building for Raw water, Approach road, Rubble wall for protecting Lakeshore and retaining wall at intake well site Njankadavu and Construction of transformer building for clear water pump house at Vasoorichira - Work tendered twice. Received single bid offer. Tender scrutinized at SE office and submitted to C.E on 12/01/2022. On 27/01/2022 C.E prequalified the tender. The awarded work amount was 8.5% above TPAC. However, as the quoted rate was 43.8% above TPAC, the tender was cancelled. Hence it was retendered with due date of 17/03/2022 and extended up to 24/03/2022, then to 5/4/2022 and 13/4/2022. However, no offers were received. Retender was due on 16/04/2022. No offers were received and hence tender was cancelled and revised estimate was submitted for revised TS. TS issued by CE(SR)on 07/07/22 .Work tendered with submission date 4-8-2022 and opening date 6-8-2022. Package XI - Augmentation of WSS to Kollam corporation - phase II- Package V - Supply and erection of raw water pump-set, Package VII - Supply and erection of clear water pump set, Package VIII- Automation, solar panel installation. - STC directed to re-tender the work by splitting the estimate to get better competition. In this regard, the work was split up into 3 packages. Tenders of packages V and VII opened on 4/5/2022. No offers were received. Hence the tenders extended up to 16/05/2022. Again no offer was received. Again tender was extended up to 26/05/2022. No offers were received and then again extended up to 08/06/2022. No offers were received then again extended up to 16/06/2022 . No offers were received then again extended up to 27/06/2022. No offers were received then again extended up to 8/07/2022.No offers received then again extended up to 20/07/2022. No offers were received then again extended up to 01/08/2022.Package VIII, tender sanctioned from CE's office and Seeking firm period extension from contractor from SE’s office. Package XII - Supplying, laying, Commissioning and maintaining 1016mm dia.8.8mm thick M.S Clear Water pumping main from TP to OHSR at Manichithode, 914 mm gravity main – 5360.415 m laid out of 6130m ,1016 mm clear water pumping main - 3120.955m laid out of 3835m. Hydrotesting of pipe lines - 914 mm- 5046.2m completed, 1016mm - 2944m completed. Valve chamber work 10 Nos completed, 6 Nos balance. Cathodic protection work in progress . Whole plastering work of 54LL OHSR at Manichithodu was completed and Painting work progressing. Concreting of top beam of pipe line bridge at kallupalam was completed on both sides. Concreting of T- Beam for pipe line bridge at Ayathil is completed and Cover slab(flange of T beam ) concrete completed. Pit for railway Push through work 75% completed. Kollam Project HD
28 Jul 2022 Packages I to III & V to IX - Work Completed 100%. Package IV - Supplying, laying, Commissioning and maintaining 1219mm M.S RW Pumping Main from Intake to TP at Vasoorichira - Total laying of 1219 mm dia MS pipe 12.50 mm thickness 15919.13 m completed and 10 mm thick MS pipe 10951.37 meters completed. Out of 28130 meters of pipe-laying work 26870.50 meters of work were completed. Cathodic protection work (70% completed) is in progress. 510 M Road concreting and Leak rectification work completed at nanthirikkal. Road Restoration work completed (Corporation road) Punthalathazham - Vasoorichira WTP site. Package X - Augmentation of Kollam corporation - Phase l - Construction of Transformer building for Raw water, Approach road, Rubble wall for protecting Lakeshore and retaining wall at intake well site Njankadavu and Construction of transformer building for clear water pump house at Vasoorichira - Work tendered twice. Received single bid offer. Tender scrutinized at SE office and submitted to C.E on 12/01/2022. On 27/01/2022 C.E prequalified the tender. The awarded work amount was 8.5% above TPAC. However, as the quoted rate was 43.8% above TPAC, the tender was cancelled. Hence it was retendered with due date of 17/03/2022 and extended up to 24/03/2022, then to 5/4/2022 and 13/4/2022. However, no offers were received. Retender was due on 16/04/2022. No offers were received and hence tender was cancelled and revised estimate was submitted for revised TS. TS issued by CE(SR)on 07/07/22 .Work tendered with submission date 4-8-2022 and opening date 6-8-2022. Package XI - Augmentation of WSS to Kollam corporation - phase II- Package V - Supply and erection of raw water pump-set, Package VII - Supply and erection of clear water pump set, Package VIII- Automation, solar panel installation. - STC directed to re-tender the work by splitting the estimate to get better competition. In this regard, the work was split up into 3 packages. Tenders of packages V and VII opened on 4/5/2022. No offers were received. Hence the tenders extended up to 16/05/2022. Again no offer was received. Again tender was extended up to 26/05/2022. No offers were received and then again extended up to 08/06/2022. No offers were received then again extended up to 16/06/2022 . No offers were received then again extended up to 27/06/2022. No offers were received then again extended up to 8/07/2022.No offers received then again extended up to 20/07/2022. No offers were received then again extended up to 01/08/2022.Package VIII, tender sanctioned from CE's office and Seeking firm period extension from contractor from SE’s office. Package XII - Supplying, laying, Commissioning and maintaining 1016mm dia.8.8mm thick M.S Clear Water pumping main from TP to OHSR at Manichithode, 914mm M .S CWGM from Manichithode to Anandavalleswaram and Construction of 54LL OHSR at Manichithode - 914 mm gravity main – 5360.415 m laid out of 6130m ,1016 mm clear water pumping main - 3120.955m laid out of 3835m. Hydrotesting of pipe lines - 914 mm- 5046.2m completed, 1016mm - 2944m completed. Valve chamber work 10 Nos completed, 6 Nos balance. Cathodic protection work in progress . Whole plastering work of 54LL OHSR at Manichithodu was completed and Painting work progressing. Concreting of top beam of pipe line bridge at kallupalam was completed on both sides. Concreting of T- Beam for pipe line bridge at Ayathil is completed. Pit for railway Push through work 75% completed. Kollam Project HD
19 Jul 2022 Packages I to III & V to IX - Work Completed 100%.Package IV - Supplying, laying, Commissioning and maintaining 1219mm M.S RW Pumping Main from Intake to TP at Vasoorichira - Total laying of 1219 mm dia MS pipe 12.50 mm thickness 15919.13 m completed and 10 mm thick MS pipe 10951.37 meters completed. Out of 28130 meters of pipe-laying work 26870.50 meters of work were completed. Cathodic protection work (70% completed) is in progress. 510 M Road concreting and Leak rectification work completed at nanthirikkal. Road Restoration work completed (Corporation road) Punthalathazham - Vasoorichira WTP site. Package X - Augmentation of Kollam corporation - Phase l - Construction of Transformer building for Raw water, Approach road, Rubble wall for protecting Lakeshore and retaining wall at intake well site Njankadavu and Construction of transformer building for clear water pump house at Vasoorichira - Work tendered twice. Received single bid offer. Tender scrutinized at SE office and submitted to C.E on 12/01/2022. On 27/01/2022 C.E prequalified the tender. The awarded work amount was 8.5% above TPAC. However, as the quoted rate was 43.8% above TPAC, the tender was cancelled. Hence it was retendered with due date of 17/03/2022 and extended up to 24/03/2022, then to 5/4/2022 and 13/4/2022. However, no offers were received. Retender was due on 16/04/2022. No offers were received and hence tender was cancelled and revised estimate was submitted for revised TS. TS issued by CE(SR)on 07/07/22 .Work tendered with submission date 4-8-2022 and opening date 6-8-2022.Package XI - Supplying, laying, Commissioning and maintaining 1016mm dia.8.8mm thick M.S Clear Water pumping main from TP to OHSR at Manichithode, 914mm M .S CWGM from Manichithode to Anandavalleswaram and Construction of 54LL OHSR at Manichithode ,914 mm gravity main– 5360.415 m laid out of 6130m ,1016 mm clear water pumping main - 3120.955m laid out of 3835m. Hydrotesting of pipe lines - 914 mm- 5046.2m completed, 1016mm - 2944m completed. Air valve chamber work and Cathodic protection work in progress . Whole plastering work of 54LL OHSR at Manichithodu was completed and Painting work progressing. Concreting of top beam of pipe line bridge at kallupalam was completed on both sides. Concreting of T- Beam for pipe line bridge at Ayathil is completed. Pit for railway Push through work 75% completed. Package XII - Augmentation of WSS to Kollam corporation - phase II- Package V - Supply and erection of raw water pump-set, Package VII - Supply and erection of clear water pump set, Package VIII- Automation, solar panel installation. - STC directed to re-tender the work by splitting the estimate to get better competition. In this regard, the work was split up into 3 packages. Tenders of packages V and VII opened on 4/5/2022. No offers were received. Hence the tenders extended up to 16/05/2022. Again no offer was received. Again tender was extended up to 26/05/2022. No offers were received and then again extended up to 08/06/2022. No offers were received then again extended up to 16/06/2022 . No offers were received then again extended up to 27/06/2022. No offers were received then again extended up to 8/07/2022.No offers received then again extended up to 20/07/2022.Package VIII, tender sanctioned from CE's office and Seeking firm period extension from contractor from SE’s office. Kollam Project HD
18 Jul 2022 Packages I to III & V to IX - Work Completed 100%.Package IV - Supplying, laying, Commissioning and maintaining 1219mm M.S RW Pumping Main from Intake to TP at Vasoorichira - Total laying of 1219 mm dia MS pipe 12.50 mm thickness 15919.13 m completed and 10 mm thick MS pipe 10951.37 meters completed. Out of 28130 meters of pipe-laying work 26870.50 meters of work were completed. Cathodic protection work (70% completed) is in progress. 510 M Road concreting and Leak rectification work completed at nanthirikkal. Road Restoration work completed (Corporation road) Punthalathazham - Vasoorichira WTP site. Package X - Augmentation of Kollam corporation - Phase l - Construction of Transformer building for Raw water, Approach road, Rubble wall for protecting Lakeshore and retaining wall at intake well site Njankadavu and Construction of transformer building for clear water pump house at Vasoorichira - Work tendered twice. Received single bid offer. Tender scrutinized at SE office and submitted to C.E on 12/01/2022. On 27/01/2022 C.E prequalified the tender. The awarded work amount was 8.5% above TPAC. However, as the quoted rate was 43.8% above TPAC, the tender was cancelled. Hence it was retendered with due date of 17/03/2022 and extended up to 24/03/2022, then to 5/4/2022 and 13/4/2022. However, no offers were received. Retender was due on 16/04/2022. No offers were received and hence tender was cancelled and revised estimate was submitted for revised TS. TS issued by CE(SR)on 07/07/22 .Work tendered with submission date 4-8-2022 and opening date 6-8-2022.Package XI - Supplying, laying, Commissioning and maintaining 1016mm dia.8.8mm thick M.S Clear Water pumping main from TP to OHSR at Manichithode, 914mm M .S CWGM from Manichithode to Anandavalleswaram and Construction of 54LL OHSR at Manichithode ,914 mm gravity main– 5360.415 m laid out of 6130m ,1016 mm clear water pumping main - 3120.955m laid out of 3835m. Hydrotesting of pipe lines - 914 mm- 5046.2m completed, 1016mm - 2944m completed. Air valve chamber work and Cathodic protection work in progress . Whole plastering work of 54LL OHSR at Manichithodu was completed and Painting work progressing. Concreting of top beam of pipe line bridge at kallupalam was completed on both sides. Concreting of T- Beam for pipe line bridge at Ayathil is completed. Pit for railway Push through work 75% completed. Package XII - Augmentation of WSS to Kollam corporation - phase II- Package V - Supply and erection of raw water pump-set, Package VII - Supply and erection of clear water pump set, Package VIII- Automation, solar panel installation. - STC directed to re-tender the work by splitting the estimate to get better competition. In this regard, the work was split up into 3 packages. Tenders of packages V and VII opened on 4/5/2022. No offers were received. Hence the tenders extended up to 16/05/2022. Again no offer was received. Again tender was extended up to 26/05/2022. No offers were received and then again extended up to 08/06/2022. No offers were received then again extended up to 16/06/2022 . No offers were received then again extended up to 27/06/2022. No offers were received then again extended up to 8/07/2022.No offers received then again extended up to 20/07/2022.Package VIII, tender sanctioned from CE's office and Seeking firm period extension from contractor from SE’s office. Kollam Project HD
16 Jul 2022 Packages I to III & V to IX - Work Completed 100%.Package IV - Supplying, laying, Commissioning and maintaining 1219mm M.S RW Pumping Main from Intake to TP at Vasoorichira - Total laying of 1219 mm dia MS pipe 12.50 mm thickness 15919.13 m completed and 10 mm thick MS pipe 10951.37 meters completed. Out of 28130 meters of pipe-laying work 26870.50 meters of work were completed. Cathodic protection work (70% completed) is in progress. 510 M Road concreting and Leak rectification work completed at nanthirikkal. Road Restoration work completed (Corporation road) Punthalathazham - Vasoorichira WTP site. Package X - Augmentation of Kollam corporation - Phase l - Construction of Transformer building for Raw water, Approach road, Rubble wall for protecting Lakeshore and retaining wall at intake well site Njankadavu and Construction of transformer building for clear water pump house at Vasoorichira - Work tendered twice. Received single bid offer. Tender scrutinized at SE office and submitted to C.E on 12/01/2022. On 27/01/2022 C.E prequalified the tender. The awarded work amount was 8.5% above TPAC. However, as the quoted rate was 43.8% above TPAC, the tender was cancelled. Hence it was retendered with due date of 17/03/2022 and extended up to 24/03/2022, then to 5/4/2022 and 13/4/2022. However, no offers were received. Retender was due on 16/04/2022. No offers were received and hence tender was cancelled and revised estimate was submitted for revised TS. TS issued by CE(SR)on 07/07/22 .Work tendered with submission date 4-8-2022 and opening date 6-8-2022.Package XI - Supplying, laying, Commissioning and maintaining 1016mm dia.8.8mm thick M.S Clear Water pumping main from TP to OHSR at Manichithode, 914mm M .S CWGM from Manichithode to Anandavalleswaram and Construction of 54LL OHSR at Manichithode ,914 mm gravity main– 5360.415 m laid out of 6130m ,1016 mm clear water pumping main - 3120.955m laid out of 3835m. Hydrotesting of pipe lines - 914 mm- 5046.2m completed, 1016mm - 2944m completed. Air valve chamber work and Cathodic protection work in progress . Whole plastering work of 54LL OHSR at Manichithodu was completed and Painting work progressing. Concreting of top beam of pipe line bridge at kallupalam was completed on both sides. Concreting of T- Beam for pipe line bridge at Ayathil is completed. Pit for railway Push through work 75% completed. Package XII - Augmentation of WSS to Kollam corporation - phase II- Package V - Supply and erection of raw water pump-set, Package VII - Supply and erection of clear water pump set, Package VIII- Automation, solar panel installation. - STC directed to re-tender the work by splitting the estimate to get better competition. In this regard, the work was split up into 3 packages. Tenders of packages V and VII opened on 4/5/2022. No offers were received. Hence the tenders extended up to 16/05/2022. Again no offer was received. Again tender was extended up to 26/05/2022. No offers were received and then again extended up to 08/06/2022. No offers were received then again extended up to 16/06/2022 . No offers were received then again extended up to 27/06/2022. No offers were received then again extended up to 8/07/2022.No offers received then again extended up to 20/07/2022.Package VIII, tender sanctioned from CE's office and Seeking firm period extension from contractor from SE’s office. Kollam Project HD
14 Jul 2022 Packages I to III & V to IX - Work Completed 100%.Package IV - Supplying, laying, Commissioning and maintaining 1219mm M.S RW Pumping Main from Intake to TP at Vasoorichira - Total laying of 1219 mm dia MS pipe 12.50 mm thickness 15919.13 m completed and 10 mm thick MS pipe 10951.37 meters completed. Out of 28130 meters of pipe-laying work 26870.50 meters of work were completed. Cathodic protection work (70% completed) is in progress. 510 M Road concreting and Leak rectification work completed at nanthirikkal. Road Restoration work completed (Corporation road) Punthalathazham - Vasoorichira WTP site. Package X - Augmentation of Kollam corporation - Phase l - Construction of Transformer building for Raw water, Approach road, Rubble wall for protecting Lakeshore and retaining wall at intake well site Njankadavu and Construction of transformer building for clear water pump house at Vasoorichira - Work tendered twice. Received single bid offer. Tender scrutinized at SE office and submitted to C.E on 12/01/2022. On 27/01/2022 C.E prequalified the tender. The awarded work amount was 8.5% above TPAC. However, as the quoted rate was 43.8% above TPAC, the tender was cancelled. Hence it was retendered with due date of 17/03/2022 and extended up to 24/03/2022, then to 5/4/2022 and 13/4/2022. However, no offers were received. Retender was due on 16/04/2022. No offers were received and hence tender was cancelled and revised estimate was submitted for revised TS. TS issued by CE(SR)on 07/07/22 .Work tendered with submission date 4-8-2022 and opening date 6-8-2022.Package XI - Supplying, laying, Commissioning and maintaining 1016mm dia.8.8mm thick M.S Clear Water pumping main from TP to OHSR at Manichithode, 914mm M .S CWGM from Manichithode to Anandavalleswaram and Construction of 54LL OHSR at Manichithode ,914 mm gravity main– 5360.415 m laid out of 6130m ,1016 mm clear water pumping main - 3120.955m laid out of 3835m. Hydrotesting of pipe lines - 914 mm- 5046.2m completed, 1016mm - 2944m completed. Air valve chamber work and Cathodic protection work in progress . Whole plastering work of 54LL OHSR at Manichithodu was completed and Painting work progressing. Concreting of top beam of pipe line bridge at kallupalam was completed on both sides. Concreting of T- Beam for pipe line bridge at Ayathil is completed. Pit for railway Push through work 75% completed. Package XII - Augmentation of WSS to Kollam corporation - phase II- Package V - Supply and erection of raw water pump-set, Package VII - Supply and erection of clear water pump set, Package VIII- Automation, solar panel installation. - STC directed to re-tender the work by splitting the estimate to get better competition. In this regard, the work was split up into 3 packages. Tenders of packages V and VII opened on 4/5/2022. No offers were received. Hence the tenders extended up to 16/05/2022. Again no offer was received. Again tender was extended up to 26/05/2022. No offers were received and then again extended up to 08/06/2022. No offers were received then again extended up to 16/06/2022 . No offers were received then again extended up to 27/06/2022. No offers were received then again extended up to 8/07/2022.No offers received then again extended up to 20/07/2022.Package VIII, tender sanctioned from CE's office and Seeking firm period extension from contractor from SE’s office. Kollam Project HD
13 Jul 2022 Packages I to III & V to IX - Work Completed 100%.Package IV - Supplying, laying, Commissioning and maintaining 1219mm M.S RW Pumping Main from Intake to TP at Vasoorichira - Total laying of 1219 mm dia MS pipe 12.50 mm thickness 15919.13 m completed and 10 mm thick MS pipe 10951.37 meters completed. Out of 28130 meters of pipe-laying work 26870.50 meters of work were completed. Cathodic protection work (70% completed) is in progress. 510 M Road concreting and Leak rectification work completed at nanthirikkal. Road Restoration work Punthalathazham - Vasoorichira WTP site completed. Package X - Augmentation of Kollam corporation - Phase l - Construction of Transformer building for Raw water, Approach road, Rubble wall for protecting Lakeshore and retaining wall at intake well site Njankadavu and Construction of transformer building for clear water pump house at Vasoorichira - Work tendered twice. Received single bid offer. Tender scrutinized at SE office and submitted to C.E on 12/01/2022. On 27/01/2022 C.E prequalified the tender. The awarded work amount was 8.5% above TPAC. However, as the quoted rate was 43.8% above TPAC, the tender was cancelled. Hence it was retendered with due date of 17/03/2022 and extended up to 24/03/2022, then to 5/4/2022 and 13/4/2022. However, no offers were received. Retender was due on 16/04/2022. No offers were received and hence tender was cancelled and revised estimate was submitted for revised TS. TS issued by CE(SR)on 07/07/22 .Work tendered with submission date 4-8-2022 and opening date 6-8-2022.Package XI - Supplying, laying, Commissioning and maintaining 1016mm dia.8.8mm thick M.S Clear Water pumping main from TP to OHSR at Manichithode, 914mm M .S CWGM from Manichithode to Anandavalleswaram and Construction of 54LL OHSR at Manichithode ,914 mm gravity main– 5360.415 m laid out of 6130m ,1016 mm clear water pumping main - 3120.955m laid out of 3835m. Hydrotesting of pipe lines - 914 mm- 5046.2m completed, 1016mm - 2944m completed. Air valve chamber work and Cathodic protection work in progress . Whole plastering work of 54LL OHSR at Manichithodu was completed and Painting work progressing. Concreting of top beam of pipe line bridge at kallupalam was completed on both sides. Concreting of T- Beam for pipe line bridge at Ayathil is completed. Pit for railway Push through work 75% completed. Package XII - Augmentation of WSS to Kollam corporation - phase II- Package V - Supply and erection of raw water pump-set, Package VII - Supply and erection of clear water pump set, Package VIII- Automation, solar panel installation. - STC directed to re-tender the work by splitting the estimate to get better competition. In this regard, the work was split up into 3 packages. Tenders of packages V and VII opened on 4/5/2022. No offers were received. Hence the tenders extended up to 16/05/2022. Again no offer was received. Again tender was extended up to 26/05/2022. No offers were received and then again extended up to 08/06/2022. No offers were received then again extended up to 16/06/2022 . No offers were received then again extended up to 27/06/2022. No offers were received then again extended up to 8/07/2022.No offers received then again extended up to 20/07/2022.Package VIII, tender sanctioned from CE's office and Seeking firm period extension from contractor from SE’s office. Kollam Project HD
11 Jul 2022 Packages I to III & V to IX - Work Completed 100%.Package IV - Supplying, laying, Commissioning and maintaining 1219mm M.S RW Pumping Main from Intake to TP at Vasoorichira - Total laying of 1219 mm dia MS pipe 12.50 mm thickness 15919.13 m completed and 10 mm thick MS pipe 10951.37 meters completed. Out of 28130 meters of pipe-laying work 26870.50 meters of work were completed. Cathodic protection work (70% completed) is in progress. 510 M Road concreting and Leak rectification work completed at nanthirikkal. Package X - Augmentation of Kollam corporation - Phase l - Construction of Transformer building for Raw water, Approach road, Rubble wall for protecting Lakeshore and retaining wall at intake well site Njankadavu and Construction of transformer building for clear water pump house at Vasoorichira - Work tendered twice. Received single bid offer. Tender scrutinized at SE office and submitted to C.E on 12/01/2022. On 27/01/2022 C.E prequalified the tender. The awarded work amount was 8.5% above TPAC. However, as the quoted rate was 43.8% above TPAC, the tender was cancelled. Hence it was retendered with due date of 17/03/2022 and extended up to 24/03/2022, then to 5/4/2022 and 13/4/2022. However, no offers were received. Retender was due on 16/04/2022. No offers were received and hence tender was cancelled and revised estimate was submitted for revised TS. TS issued by CE(SR)on 07/07/22 .Work tendered with submission date 4-8-2022 and opening date 6-8-2022.Package XI - Supplying, laying, Commissioning and maintaining 1016mm dia.8.8mm thick M.S Clear Water pumping main from TP to OHSR at Manichithode, 914mm M .S CWGM from Manichithode to Anandavalleswaram and Construction of 54LL OHSR at Manichithode ,914 mm gravity main– 5360.415 m laid out of 6130m ,1016 mm clear water pumping main - 3120.955m laid out of 3835m. Hydrotesting of pipe lines - 914 mm- 5046.2m completed, 1016mm - 2944m completed. Air valve chamber work and Cathodic protection work in progress . Whole plastering work of 54LL OHSR at Manichithodu was completed and Painting work progressing. Concreting of top beam of pipe line bridge at kallupalam was completed on both sides. Concreting of T- Beam for pipe line bridge at Ayathil is completed. Pit for railway Push through work 75% completed. Package XII - Augmentation of WSS to Kollam corporation - phase II- Package V - Supply and erection of raw water pump-set, Package VII - Supply and erection of clear water pump set, Package VIII- Automation, solar panel installation. - STC directed to re-tender the work by splitting the estimate to get better competition. In this regard, the work was split up into 3 packages. Tenders of packages V and VII opened on 4/5/2022. No offers were received. Hence the tenders extended up to 16/05/2022. Again no offer was received. Again tender was extended up to 26/05/2022. No offers were received and then again extended up to 08/06/2022. No offers were received then again extended up to 16/06/2022 . No offers were received then again extended up to 27/06/2022. No offers were received then again extended up to 8/07/2022.No offers received then again extended up to 20/07/2022.Package VIII, tender sanctioned from CE's office and Seeking firm period extension from contractor from SE’s office. Kollam Project HD