Status Date Overall Project Status Project Officer Contact
12 Mar 2023 Packages I to III & V to IX - Work Completed 100%. Package IV - Supplying, laying, Commissioning and maintaining 1219mm M.S RW Pumping Main from Intake to TP at Vasoorichira – Application submitted in MORTH portal vide application no.20220821/1/1/16271/124813 for road cutting sanction from Elampalloor to Nanthirikkal. Package X - 914 mm gravity main – 5553.1 laid out of 6130m,1016 mm clear water pumping main - 3617.46 mm laid out of 3835m. Hydrotesting of pipelines - 914 mm- 5046.2m completed, 1016mm - 2944m completed. Valve chamber works- 10 Nos completed 6 Nos balance. Cathodic protection work in progress. The whole plastering work of 54LL OHSR at Manichithodu was completed and the Painting work was completed. The casting of the top beam of the pipeline bridge at kallupalam was completed on both sides. The casting of the pipeline bridge at Ayathil is completed and pipe laying through the pipeline bridge is completed. Pit for railway Push through work 75% completed. Kallupalam pipeline bridge fabrication work in progress. Handrail fixing work is in progress at 54LL OHSR at Manichithodu Package XI- TS issued by CE(SR)on 07/07/22 .Work tendered with submission date 4-8-2022 and opening date 6-8-2022. Since no offers were received, the work will be retendered with submission date 3-9-2022 and opening date 5-9-2022.No offers were received then extended upto 12/09/2022.Since no offers were received, the work will be retendered with submission date 1-10-2022 and opening date 3-10-2022. One offer received. Technical bid submitted to CE(SR) for pre-qualification on 12/10/2022. Pre-qualification Minutes received on 21/10/2022.Final Pre-qualification is under processing. Price bid opened on 3/10/2022.One offer received, Quated rate 36% above the TPAC. Submitted to CE(SR) for tender sanction on 07/11/2022.Selection notice issued on 11.11.22 but contractor not willing to execute the work at awarded rate. Package XII- Tenders of packages V and VII opened on 4/5/2022. No offers were received hence the tenders were extended up to 16/05/2022. again no offer was received then again tender was extended up to 26/05/2022.no offers were received then again extended up to 16/06/2022 . No offers were received then again extended up to 27/06/2022. No offers were received then again extended up to 8/07/2022.No offers were received then again extended up to 20/07/2022. No offers were received then again extended up to 29/07/2022. But No offers were received then again extended up to 16/08/2022. No offers received then again extended up to 26/08/2022. Tender cancelled due to no participation. Package VIII, tender sanctioned from CE's office.But the tender for transformer building is not taken by any bidders,the tender for automation and solar panel is cancelled. Estimate recating of pumpsets and automation,solar panel etc on price 3 and forwarded to Consultant for vetting and vetted estimate casting in price 3.0 is under progress Kollam Project HD
11 Mar 2023 Packages I to III & V to IX - Work Completed 100%. Package IV - Supplying, laying, Commissioning and maintaining 1219mm M.S RW Pumping Main from Intake to TP at Vasoorichira – Application submitted in MORTH portal vide application no.20220821/1/1/16271/124813 for road cutting sanction from Elampalloor to Nanthirikkal. Package X - 914 mm gravity main – 5553.1 laid out of 6130m,1016 mm clear water pumping main - 3617.46 mm laid out of 3835m. Hydrotesting of pipelines - 914 mm- 5046.2m completed, 1016mm - 2944m completed. Valve chamber works- 10 Nos completed 6 Nos balance. Cathodic protection work in progress. The whole plastering work of 54LL OHSR at Manichithodu was completed and the Painting work was completed. The casting of the top beam of the pipeline bridge at kallupalam was completed on both sides. The casting of the pipeline bridge at Ayathil is completed and pipe laying through the pipeline bridge is completed. Pit for railway Push through work 75% completed. Kallupalam pipeline bridge fabrication work in progress. Handrail fixing work is in progress at 54LL OHSR at Manichithodu Package XI- TS issued by CE(SR)on 07/07/22 .Work tendered with submission date 4-8-2022 and opening date 6-8-2022. Since no offers were received, the work will be retendered with submission date 3-9-2022 and opening date 5-9-2022.No offers were received then extended upto 12/09/2022.Since no offers were received, the work will be retendered with submission date 1-10-2022 and opening date 3-10-2022. One offer received. Technical bid submitted to CE(SR) for pre-qualification on 12/10/2022. Pre-qualification Minutes received on 21/10/2022.Final Pre-qualification is under processing. Price bid opened on 3/10/2022.One offer received, Quated rate 36% above the TPAC. Submitted to CE(SR) for tender sanction on 07/11/2022.Selection notice issued on 11.11.22 but contractor not willing to execute the work at awarded rate. Package XII- Tenders of packages V and VII opened on 4/5/2022. No offers were received hence the tenders were extended up to 16/05/2022. again no offer was received then again tender was extended up to 26/05/2022.no offers were received then again extended up to 16/06/2022 . No offers were received then again extended up to 27/06/2022. No offers were received then again extended up to 8/07/2022.No offers were received then again extended up to 20/07/2022. No offers were received then again extended up to 29/07/2022. But No offers were received then again extended up to 16/08/2022. No offers received then again extended up to 26/08/2022. Tender cancelled due to no participation. Package VIII, tender sanctioned from CE's office.But the tender for transformer building is not taken by any bidders,the tender for automation and solar panel is cancelled. Estimate recating of pumpsets and automation,solar panel etc on price 3 and forwarded to Consultant for vetting Kollam Project HD
10 Mar 2023 Packages I to III & V to IX - Work Completed 100%. Package IV - Supplying, laying, Commissioning and maintaining 1219mm M.S RW Pumping Main from Intake to TP at Vasoorichira – Application submitted in MORTH portal vide application no.20220821/1/1/16271/124813 for road cutting sanction from Elampalloor to Nanthirikkal. Package X - 914 mm gravity main – 5553.1 laid out of 6130m,1016 mm clear water pumping main - 3617.46 mm laid out of 3835m. Hydrotesting of pipelines - 914 mm- 5046.2m completed, 1016mm - 2944m completed. Valve chamber works- 10 Nos completed 6 Nos balance. Cathodic protection work in progress. The whole plastering work of 54LL OHSR at Manichithodu was completed and the Painting work was completed. The casting of the top beam of the pipeline bridge at kallupalam was completed on both sides. The casting of the pipeline bridge at Ayathil is completed and pipe laying through the pipeline bridge is completed. Pit for railway Push through work 75% completed. Kallupalam pipeline bridge fabrication work in progress. Handrail fixing work is in progress at 54LL OHSR at Manichithodu Package XI- TS issued by CE(SR)on 07/07/22 .Work tendered with submission date 4-8-2022 and opening date 6-8-2022. Since no offers were received, the work will be retendered with submission date 3-9-2022 and opening date 5-9-2022.No offers were received then extended upto 12/09/2022.Since no offers were received, the work will be retendered with submission date 1-10-2022 and opening date 3-10-2022. One offer received. Technical bid submitted to CE(SR) for pre-qualification on 12/10/2022. Pre-qualification Minutes received on 21/10/2022.Final Pre-qualification is under processing. Price bid opened on 3/10/2022.One offer received, Quated rate 36% above the TPAC. Submitted to CE(SR) for tender sanction on 07/11/2022.Selection notice issued on 11.11.22 but contractor not willing to execute the work at awarded rate. Package XII- Tenders of packages V and VII opened on 4/5/2022. No offers were received hence the tenders were extended up to 16/05/2022. again no offer was received then again tender was extended up to 26/05/2022.no offers were received then again extended up to 16/06/2022 . No offers were received then again extended up to 27/06/2022. No offers were received then again extended up to 8/07/2022.No offers were received then again extended up to 20/07/2022. No offers were received then again extended up to 29/07/2022. But No offers were received then again extended up to 16/08/2022. No offers received then again extended up to 26/08/2022. Tender cancelled due to no participation. Package VIII, tender sanctioned from CE's office.But the tender for transformer building is not taken by any bidders,the tender for automation and solar panel is cancelled. Estimate recating of pumpsets and automation,solar panel etc on price 3 and forwarded to Consultant for vetting Kollam Project HD
09 Mar 2023 Packages I to III & V to IX - Work Completed 100%. Package IV - Supplying, laying, Commissioning and maintaining 1219mm M.S RW Pumping Main from Intake to TP at Vasoorichira – Application submitted in MORTH portal vide application no.20220821/1/1/16271/124813 for road cutting sanction from Elampalloor to Nanthirikkal. Package X - 914 mm gravity main – 5553.1 laid out of 6130m,1016 mm clear water pumping main - 3617.46 mm laid out of 3835m. Hydrotesting of pipelines - 914 mm- 5046.2m completed, 1016mm - 2944m completed. Valve chamber works- 10 Nos completed 6 Nos balance. Cathodic protection work in progress. The whole plastering work of 54LL OHSR at Manichithodu was completed and the Painting work was completed. The casting of the top beam of the pipeline bridge at kallupalam was completed on both sides. The casting of the pipeline bridge at Ayathil is completed and pipe laying through the pipeline bridge is completed. Pit for railway Push through work 75% completed. Kallupalam pipeline bridge fabrication work in progress. Handrail fixing work is in progress at 54LL OHSR at Manichithodu Package XI- TS issued by CE(SR)on 07/07/22 .Work tendered with submission date 4-8-2022 and opening date 6-8-2022. Since no offers were received, the work will be retendered with submission date 3-9-2022 and opening date 5-9-2022.No offers were received then extended upto 12/09/2022.Since no offers were received, the work will be retendered with submission date 1-10-2022 and opening date 3-10-2022. One offer received. Technical bid submitted to CE(SR) for pre-qualification on 12/10/2022. Pre-qualification Minutes received on 21/10/2022.Final Pre-qualification is under processing. Price bid opened on 3/10/2022.One offer received, Quated rate 36% above the TPAC. Submitted to CE(SR) for tender sanction on 07/11/2022.Selection notice issued on 11.11.22 but contractor not willing to execute the work at awarded rate. Package XII- Tenders of packages V and VII opened on 4/5/2022. No offers were received hence the tenders were extended up to 16/05/2022. again no offer was received then again tender was extended up to 26/05/2022.no offers were received then again extended up to 16/06/2022 . No offers were received then again extended up to 27/06/2022. No offers were received then again extended up to 8/07/2022.No offers were received then again extended up to 20/07/2022. No offers were received then again extended up to 29/07/2022. But No offers were received then again extended up to 16/08/2022. No offers received then again extended up to 26/08/2022. Tender cancelled due to no participation. Package VIII, tender sanctioned from CE's office.But the tender for transformer building is not taken by any bidders,the tender for automation and solar panel is cancelled. Estimate recating of pumpsets and automation,solar panel etc on price 3 and forwarded to Consultant for vetting Kollam Project HD
06 Mar 2023 Packages I to III & V to IX - Work Completed 100%. Package IV - Supplying, laying, Commissioning and maintaining 1219mm M.S RW Pumping Main from Intake to TP at Vasoorichira – Application submitted in MORTH portal vide application no.20220821/1/1/16271/124813 for road cutting sanction from Elampalloor to Nanthirikkal. Package X - 914 mm gravity main – 5553.1 laid out of 6130m,1016 mm clear water pumping main - 3617.46 mm laid out of 3835m. Hydrotesting of pipelines - 914 mm- 5046.2m completed, 1016mm - 2944m completed. Valve chamber works- 10 Nos completed 6 Nos balance. Cathodic protection work in progress. The whole plastering work of 54LL OHSR at Manichithodu was completed and the Painting work was completed. The casting of the top beam of the pipeline bridge at kallupalam was completed on both sides. The casting of the pipeline bridge at Ayathil is completed and pipe laying through the pipeline bridge is completed. Pit for railway Push through work 75% completed. Kallupalam pipeline bridge fabrication work in progress. Handrail fixing work is in progress at 54LL OHSR at Manichithodu Package XI- TS issued by CE(SR)on 07/07/22 .Work tendered with submission date 4-8-2022 and opening date 6-8-2022. Since no offers were received, the work will be retendered with submission date 3-9-2022 and opening date 5-9-2022.No offers were received then extended upto 12/09/2022.Since no offers were received, the work will be retendered with submission date 1-10-2022 and opening date 3-10-2022. One offer received. Technical bid submitted to CE(SR) for pre-qualification on 12/10/2022. Pre-qualification Minutes received on 21/10/2022.Final Pre-qualification is under processing. Price bid opened on 3/10/2022.One offer received, Quated rate 36% above the TPAC. Submitted to CE(SR) for tender sanction on 07/11/2022.Selection notice issued on 11.11.22 but contractor not willing to execute the work at awarded rate. Package XII- Tenders of packages V and VII opened on 4/5/2022. No offers were received hence the tenders were extended up to 16/05/2022. again no offer was received then again tender was extended up to 26/05/2022.no offers were received then again extended up to 16/06/2022 . No offers were received then again extended up to 27/06/2022. No offers were received then again extended up to 8/07/2022.No offers were received then again extended up to 20/07/2022. No offers were received then again extended up to 29/07/2022. But No offers were received then again extended up to 16/08/2022. No offers received then again extended up to 26/08/2022. Tender cancelled due to no participation. Package VIII, tender sanctioned from CE's office.But the tender for transformer building is not taken by any bidders,the tender for automation and solar panel is cancelled. Estimate recating of pumpsets and automation,solar panel etc on price 3 and forwarded to Consultant for vetting Kollam Project HD
03 Mar 2023 Packages I to III & V to IX - Work Completed 100%. Package IV - Supplying, laying, Commissioning and maintaining 1219mm M.S RW Pumping Main from Intake to TP at Vasoorichira – Application submitted in MORTH portal vide application no.20220821/1/1/16271/124813 for road cutting sanction from Elampalloor to Nanthirikkal. Package X - 914 mm gravity main – 5553.1 laid out of 6130m,1016 mm clear water pumping main - 3617.46 mm laid out of 3835m. Hydrotesting of pipelines - 914 mm- 5046.2m completed, 1016mm - 2944m completed. Valve chamber works- 10 Nos completed 6 Nos balance. Cathodic protection work in progress. The whole plastering work of 54LL OHSR at Manichithodu was completed and the Painting work was completed. The casting of the top beam of the pipeline bridge at kallupalam was completed on both sides. The casting of the pipeline bridge at Ayathil is completed and pipe laying through the pipeline bridge is completed. Pit for railway Push through work 75% completed. Kallupalam pipeline bridge fabrication work in progress. Handrail fixing work is in progress at 54LL OHSR at Manichithodu Package XI- TS issued by CE(SR)on 07/07/22 .Work tendered with submission date 4-8-2022 and opening date 6-8-2022. Since no offers were received, the work will be retendered with submission date 3-9-2022 and opening date 5-9-2022.No offers were received then extended upto 12/09/2022.Since no offers were received, the work will be retendered with submission date 1-10-2022 and opening date 3-10-2022. One offer received. Technical bid submitted to CE(SR) for pre-qualification on 12/10/2022. Pre-qualification Minutes received on 21/10/2022.Final Pre-qualification is under processing. Price bid opened on 3/10/2022.One offer received, Quated rate 36% above the TPAC. Submitted to CE(SR) for tender sanction on 07/11/2022.Selection notice issued on 11.11.22 but contractor not willing to execute the work at awarded rate. Package XII- Tenders of packages V and VII opened on 4/5/2022. No offers were received hence the tenders were extended up to 16/05/2022. again no offer was received then again tender was extended up to 26/05/2022.no offers were received then again extended up to 16/06/2022 . No offers were received then again extended up to 27/06/2022. No offers were received then again extended up to 8/07/2022.No offers were received then again extended up to 20/07/2022. No offers were received then again extended up to 29/07/2022. But No offers were received then again extended up to 16/08/2022. No offers received then again extended up to 26/08/2022. Tender cancelled due to no participation. Package VIII, tender sanctioned from CE's office.But the tender for transformer building is not taken by any bidders,the tender for automation and solar panel is cancelled. Estimate recating of pumpsets and automation,solar panel etc on price 3 and forwarded to Consultant for vetting Kollam Project HD
01 Mar 2023 Packages I to III & V to IX - Work Completed 100%. Package IV - Supplying, laying, Commissioning and maintaining 1219mm M.S RW Pumping Main from Intake to TP at Vasoorichira – Application submitted in MORTH portal vide application no.20220821/1/1/16271/124813 for road cutting sanction from Elampalloor to Nanthirikkal. Package X - 914 mm gravity main – 5553.1 laid out of 6130m,1016 mm clear water pumping main - 3617.46 mm laid out of 3835m. Hydrotesting of pipelines - 914 mm- 5046.2m completed, 1016mm - 2944m completed. Valve chamber works- 10 Nos completed 6 Nos balance. Cathodic protection work in progress. The whole plastering work of 54LL OHSR at Manichithodu was completed and the Painting work was completed. The casting of the top beam of the pipeline bridge at kallupalam was completed on both sides. The casting of the pipeline bridge at Ayathil is completed and pipe laying through the pipeline bridge is completed. Pit for railway Push through work 75% completed. Kallupalam pipeline bridge fabrication work in progress. Handrail fixing work is in progress at 54LL OHSR at Manichithodu Package XI- TS issued by CE(SR)on 07/07/22 .Work tendered with submission date 4-8-2022 and opening date 6-8-2022. Since no offers were received, the work will be retendered with submission date 3-9-2022 and opening date 5-9-2022.No offers were received then extended upto 12/09/2022.Since no offers were received, the work will be retendered with submission date 1-10-2022 and opening date 3-10-2022. One offer received. Technical bid submitted to CE(SR) for pre-qualification on 12/10/2022. Pre-qualification Minutes received on 21/10/2022.Final Pre-qualification is under processing. Price bid opened on 3/10/2022.One offer received, Quated rate 36% above the TPAC. Submitted to CE(SR) for tender sanction on 07/11/2022.Selection notice issued on 11.11.22 but contractor not willing to execute the work at awarded rate. Package XII- Tenders of packages V and VII opened on 4/5/2022. No offers were received hence the tenders were extended up to 16/05/2022. again no offer was received then again tender was extended up to 26/05/2022.no offers were received then again extended up to 16/06/2022 . No offers were received then again extended up to 27/06/2022. No offers were received then again extended up to 8/07/2022.No offers were received then again extended up to 20/07/2022. No offers were received then again extended up to 29/07/2022. But No offers were received then again extended up to 16/08/2022. No offers received then again extended up to 26/08/2022. Tender cancelled due to no participation. Package VIII, tender sanctioned from CE's office.But the tender for transformer building is not taken by any bidders,the tender for automation and solar panel is cancelled. Estimate recating of pumpsets and automation,solar panel etc on price 3 and forwarded to Consultant for vetting Kollam Project HD
23 Jan 2023 Packages I to III & V to IX - Work Completed 100%. Package IV - Supplying, laying, Commissioning and maintaining 1219mm M.S RW Pumping Main from Intake to TP at Vasoorichira – Application submitted in MORTH portal vide application no.20220821/1/1/16271/124813 for road cutting sanction from Elampalloor to Nanthirikkal. Package X - 914 mm gravity main – 5553.1 laid out of 6130m,1016 mm clear water pumping main - 3617.46 mm laid out of 3835m. Hydrotesting of pipelines - 914 mm- 5046.2m completed, 1016mm - 2944m completed. Valve chamber works- 10 Nos completed 6 Nos balance. Cathodic protection work in progress. The whole plastering work of 54LL OHSR at Manichithodu was completed and the Painting work was completed. The casting of the top beam of the pipeline bridge at kallupalam was completed on both sides. The casting of the pipeline bridge at Ayathil is completed and pipe laying through the pipeline bridge is completed. Pit for railway Push through work 75% completed. Kallupalam pipeline bridge fabrication work in progress. Handrail fixing work is in progress at 54LL OHSR at Manichithodu Package XI- TS issued by CE(SR)on 07/07/22 .Work tendered with submission date 4-8-2022 and opening date 6-8-2022. Since no offers were received, the work will be retendered with submission date 3-9-2022 and opening date 5-9-2022.No offers were received then extended upto 12/09/2022.Since no offers were received, the work will be retendered with submission date 1-10-2022 and opening date 3-10-2022. One offer received. Technical bid submitted to CE(SR) for pre-qualification on 12/10/2022. Pre-qualification Minutes received on 21/10/2022.Final Pre-qualification is under processing. Price bid opened on 3/10/2022.One offer received, Quated rate 36% above the TPAC. Submitted to CE(SR) for tender sanction on 07/11/2022.Selection notice issued on 11.11.22 but contractor not willing to execute the work at awarded rate. Package XII- Tenders of packages V and VII opened on 4/5/2022. No offers were received hence the tenders were extended up to 16/05/2022. again no offer was received then again tender was extended up to 26/05/2022.no offers were received then again extended up to 16/06/2022 . No offers were received then again extended up to 27/06/2022. No offers were received then again extended up to 8/07/2022.No offers were received then again extended up to 20/07/2022. No offers were received then again extended up to 29/07/2022. But No offers were received then again extended up to 16/08/2022. No offers received then again extended up to 26/08/2022. Tender cancelled due to no participation. Package VIII, tender sanctioned from CE's office.But the tender for transformer building is not taken by any bidders,the tender for automation and solar panel is cancelled. Estimate recating of pumpsets and automation,solar panel etc on price 3 and forwarded to Consultant for vetting Kollam Project HD
15 Nov 2022 Packages I to III & V to IX - Work Completed 100%. Package IV - Supplying, laying, Commissioning and maintaining 1219mm M.S RW Pumping Main from Intake to TP at Vasoorichira – Application submitted in MORTH portal vide application no.20220821/1/1/16271/124813 for road cutting sanction from Elampalloor to Nanthirikkal. Package X - 914 mm gravity main – 5553.1 laid out of 6130m,1016 mm clear water pumping main - 3617.46 mm laid out of 3835m. Hydrotesting of pipelines - 914 mm- 5046.2m completed, 1016mm - 2944m completed. Valve chamber works- 10 Nos completed 6 Nos balance. Cathodic protection work in progress. The whole plastering work of 54LL OHSR at Manichithodu was completed and the Painting work was completed. The casting of the top beam of the pipeline bridge at kallupalam was completed on both sides. The casting of the pipeline bridge at Ayathil is completed and pipe laying through the pipeline bridge is completed. Pit for railway Push through work 75% completed. Kallupalam pipeline bridge fabrication work in progress. Handrail fixing work is in progress at 54LL OHSR at Manichithodu Package XI- TS issued by CE(SR)on 07/07/22 .Work tendered with submission date 4-8-2022 and opening date 6-8-2022. Since no offers were received, the work will be retendered with submission date 3-9-2022 and opening date 5-9-2022.No offers were received then extended upto 12/09/2022.Since no offers were received, the work will be retendered with submission date 1-10-2022 and opening date 3-10-2022. One offer received. Technical bid submitted to CE(SR) for pre-qualification on 12/10/2022. Pre-qualification Minutes received on 21/10/2022.Final Pre-qualification is under processing. Price bid opened on 3/10/2022.One offer received, Quated rate 36% above the TPAC. Submitted to CE(SR) for tender sanction on 07/11/2022.Selection notice issued on 11.11.22 but contractor not willing to execute the work at awarded rate. Package XII- Tenders of packages V and VII opened on 4/5/2022. No offers were received hence the tenders were extended up to 16/05/2022. again no offer was received then again tender was extended up to 26/05/2022.no offers were received then again extended up to 16/06/2022 . No offers were received then again extended up to 27/06/2022. No offers were received then again extended up to 8/07/2022.No offers were received then again extended up to 20/07/2022. No offers were received then again extended up to 29/07/2022. But No offers were received then again extended up to 16/08/2022. No offers received then again extended up to 26/08/2022. Tender cancelled due to no participation. Package VIII, tender sanctioned from CE's office.But the tender for transformer building is not taken by any bidders,the tender for automation and solar panel is cancelled. Estimate recating of pumpsets and automation,solar panel etc is going on Kollam Project HD
06 Nov 2022 Packages I to III & V to IX - Work Completed 100%. Package IV - Supplying, laying, Commissioning and maintaining 1219mm M.S RW Pumping Main from Intake to TP at Vasoorichira – Application submitted in MORTH portal vide application no.20220821/1/1/16271/124813 for road cutting sanction from Elampalloor to Nanthirikkal. Package X - 914 mm gravity main – 5502.615 laid out of 6130m,1016 mm clear water pumping main - 3617.46 mm laid out of 3835m. Hydrotesting of pipelines - 914 mm- 5046.2m completed, 1016mm - 2944m completed. Valve chamber works- 10 Nos completed 6 Nos balance. Cathodic protection work in progress. The whole plastering work of 54LL OHSR at Manichithodu was completed and the Painting work was completed. The casting of the top beam of the pipeline bridge at kallupalam was completed on both sides. The casting of the pipeline bridge at Ayathil is completed and pipe laying through the pipeline bridge is completed. Pit for railway Push through work 75% completed. Kallupalam pipeline bridge fabrication work in progress. Handrail fixing work is in progress at 54LL OHSR at Manichithodu Package XI- TS issued by CE(SR)on 07/07/22 .Work tendered with submission date 4-8-2022 and opening date 6-8-2022. Since no offers were received, the work will be retendered with submission date 3-9-2022 and opening date 5-9-2022.No offers were received then extended upto 12/09/2022.Since no offers were received, the work will be retendered with submission date 1-10-2022 and opening date 3-10-2022. One offer received. Technical bid submitted to CE(SR) for pre-qualification on 12/10/2022. Pre-qualification Minutes received on 21/10/2022.Final Pre-qualification is under processing. Price bid opened on 3/10/2022.One offer received, Quated rate 36% above the TPAC. Package XII- Tenders of packages V and VII opened on 4/5/2022. No offers were received hence the tenders were extended up to 16/05/2022. again no offer was received then again tender was extended up to 26/05/2022.no offers were received then again extended up to 16/06/2022 . No offers were received then again extended up to 27/06/2022. No offers were received then again extended up to 8/07/2022.No offers were received then again extended up to 20/07/2022. No offers were received then again extended up to 29/07/2022. But No offers were received then again extended up to 16/08/2022. No offers received then again extended up to 26/08/2022. Tender cancelled due to no participation. Package VIII, tender sanctioned from CE's office.But the tender for transformer building is not taken by any bidders,the tender for automation and solar panel is cancelled. Estimate recating of pumpsets and automation,solar panel etc is going on. Kollam Project HD