Budget -2017-2018-KIIFB project-TRAN10:WRD 025-13-WSS to Ramanchadi- Aligarh in Malappuram District

Project Budget -2017-2018-KIIFB project-TRAN10:WRD 025-13-WSS to Ramanchadi- Aligarh in Malappuram District
Project Code MLPKIIFB1118510
Type Main project
Funding Agency KIIFB
Category KIIFB
Type of scheme Water Supply
Scheme KIIFB
Description `Construction and commissioning of intake well cum pump house including construction of leading channel,temporary bund,construction of transformer substation building,Design,supply,erection,testing and commissioning of centrifugal pump sets with allied electrical works,supplying ,laying,testing,commissioning 600mm DI K9 RWPM ,250 mmDI K9 CWPM,450mm DI K9 CWGM,Design,constuction,commissioning 23 MLD WTP with SCADA arrangements,construction commissioning 12 LL capacity OHSR etc.. supply laying and testing of Distribution main and electro mechanical works etc.. on completion of tvhe project 8.24MLD water can be supplied.Annual revenue will be 12030400 rupees If rate is rs 4/kl Labour material ratio is 5:14
Status On-going
District Malappuram
Executing Office Malappuram Project Dn
AS Amount (Rs) 925200000
AS Number GO (Rt) No.67/2018/WRD dtd 1/2/2018
TS Amount (Rs)
TS Number
Total Bill Submitted (Rs) 496271582
Total Bill Paid (Rs) 496271582
Population Benefitted 190954
Capacity in MLD 23.00
Actual Project Completion Date 31 Jul 2022
Coverage Perintalmanna municipality and adjoining elamkulam ,angadippuram panchayaths
Implementation Schedule Download
Work Plan Download

Packages

No. Project Name Location View
1 Budget -2017-2018-KIIFB project-TRAN10:WRD 025-13-WSS to Ramanchadi- Aligarh in Malappuram District Package 1 Project Division Malappuram
2 Budget -2017-2018-KIIFB project-TRAN10:WRD 025-13-WSS to Ramanchadi- Aligarh in Malappuram District Package 2 Project Division Malappuram
3 Budget -2017-2018-KIIFB project-TRAN10:WRD 025-13-WSS to Ramanchadi- Aligarh in Malappuram District- Package 3A- Electromechanical works Project Division Malappuram
4 Budget 2017-2018 KIIFB Project- TRAN10 : WRD 025- 13 WSS to Ramanchadi- Aligarh in Malappuram District-Package 3B - balance transmission main up to KWA office compound Project Division Malappuram
5 Budget -2017-2018-KIIFB project-TRAN10:WRD 025-13-WSS to Ramanchadi- Aligarh in Malappuram District- Package 4 construction of weir Project Division Malappuram
6 Budget -2017-2018-KIIFB project-TRAN10:WRD 025-13-WSS to Ramanchadi- Aligarh in Malappuram District- Package 5 Project Division Malappuram

Overall Project Status

Status Date Overall Project Status Project Officer Contact
27 Nov 2023 In package 1, 93% - Raw water pumphouse, Raw water pumping main, and Booster station are in Finishing stage. 23 MLD WTP, 12 LL OHSR, All gravity and pumping mains are completed. In package 2, Work short closed. in package 3a, Tender approval obtained from govt. and work awarded on 31/05/2023. Design of pump set are completed and pump set order is placed by the contracter. In package 3b, Work Awarded. In package 4, As per the joint meeting with CE irrigation with our CE,it is decided to deposit weir AS amount 2.9 crore rupees in the Irrigation project. Irrigation dept is progressing towards AS for their project. In joint meeting with CE irrigation and CR IDRB conducted on 11/04/2022, CE IDRB informed that the design will be ready soon. Direction was given by Secretary to Government, Water Resources (WS-C) Department to CE (I&A) to prepare a submite DPR of the subject work for Administrative Saction on 19/08/2023. In packge 5, Got TS approval. Waiting for KIIFB package approval to start tendering process. Malappuram Project Dn AE3
12 Sep 2023 In package 1, 92% - Pump house and substation building works are completed. Leading chanel work 70% completed. Row water pumping main completed. Anchor blocks 90% completed. Pressure testing of Raw water pumping main in MS portion to be done. Booster station work completed. Water tightening test to be done. WTP is completed. 12 LL OHSR in AMU campus is completed. Clear water pumping main/ Gravity main are completed. KSEB power line extension is required for the commissioning of the scheme. KIIFB asked for resubmit the demand (of 6.25 cr recieved from KSEB) with out supervision charge. The same is not obtained from KSEB yet. Package 2, 93% - All works are completed except the replacement of old AC pipe with DI for a length of 4.5 KM along NH 966, as the road cutting permission was not obtained from the NHAI. so Work short closed. Package 3A, Tender approval obtained from govt. and work awarded on 31/05/2023. Design of pump set are completed and pump set order is placed by the contracter. Package 3B, Tender awarded in LMR rate. Contractor denied to executed the agreement. Tender cancelled. Re-casted the estimate with new pipe rate in price 3 and submitted. TS approved, Under Tendering Procedure. Package 4, As per the joint meeting with CE irrigation with our CE,it is decided to deposit weir AS amount 2.9 crore rupees in the Irrigation project. Irrigation dept is progressing towards AS for their project. In joint meeting with CE irrigation and CR IDRB conducted on 11/04/2022, CE IDRB informed that the design will be ready soon. Package 5, Got TS approval. Waiting for KIIFB package approval to start tendering process. Malappuram Project Dn AE3
01 Aug 2023 In package 1, 91% - Raw water pumping main 695 m (600mm DI) laying done. Laying MS row water pumping main on going and anchor block work ongoing. RWPM Air Valve Fixing Completed. Clear water pumping main work under progress. 1215 m (250 mm DI) piping done. 8030 m (450 mm DI) laying done. Substation building (Handrail and Paiting works completed) Well cum Pump house (Plastering work and fabrication works for windows and doors completed. Painting Work completed. (Booster cum pump house) plastering in progress, pumphouse flooring PCC work completed. Leading Channel work in progress. Package 2, 93% - Work short closed. Package 3A, Tender approval obtained (No : 27/2023/WRD DTD. 24/04/2023). Work awarded and site handed over. Package 3B, Tender awarded in LMR rate. Contractor denied to executed the agreement. Tender cancelled. Re-casted the estimate with new pipe rate in price 3 and submitted. TS approved, Re-Tendered. Package 4, As per the joint meeting with CE irrigation with our CE,it is decided to deposit weir AS amount 2.9 crore rupees in the Irrigation project. Irrigation dept is progressing towards AS for their project. In joint meeting with CE irrigation and CR IDRB conducted on 11/04/2022, CE IDRB informed that the design will be ready soon. Package 5, Got TS. Waiting for KIIFB package approval to start tendering process. Malappuram Project Dn AE3
20 Jul 2023 In package 1, 91% - Raw water pumping main 695 m (600mm DI) laying done. Laying MS row water pumping main on going and anchor block work ongoing. RWPM Air Valve Fixing Completed. Clear water pumping main work under progress. 1215 m (250 mm DI) piping done. 8030 m (450 mm DI) laying done. Substation building (Handrail and Paiting works completed) Well cum Pump house (Plastering work and fabrication works for windows and doors completed. Painting Work completed. (Booster cum pump house) plastering in progress, pumphouse flooring PCC work completed. Leading Channel work in progress. Package 2, 93% - Work short closed. Package 3A, Tender approval obtained (No : 27/2023/WRD DTD. 24/04/2023). Work awarded and site handed over. Package 3B, Tender awarded in LMR rate. Contractor denied to executed the agreement. Tender cancelled. Re-casted the estimate with new pipe rate in price 3 and submitted. TS approved, Re-Tendered. Package 4, As per the joint meeting with CE irrigation with our CE,it is decided to deposit weir AS amount 2.9 crore rupees in the Irrigation project. Irrigation dept is progressing towards AS for their project. In joint meeting with CE irrigation and CR IDRB conducted on 11/04/2022, CE IDRB informed that the design will be ready soon. Package 5, Got TS. Waiting for KIIFB package approval to start tendering process. Malappuram Project Dn AE3
30 Jun 2023 In package 1, 90% - Raw water pumping main 695 m (600mm DI) laying done. Laying MS row water pumping main on going. RWPM Air Valve Fixing Completed. Clear water pumping main work under progress. 1215 m (250 mm DI) piping done. 8030 m (450 mm DI) laying done. Substation building (Handrail works and Paiting work progress.) Well cum Pump house (Plastering work and fabrication works for windows and doors under progress. Painting Work progress. (Booster cum pump house) plastering in progress, pumphouse flooring PCC work in progress. Leading Channel work in progress. Package 2, Work Short closed. Package 3A, Tender approval obtained (No : 27/2023/WRD DTD. 24/04/2023). Work awarded and site handed over. Package 3B, Tender awarded in LMR rate. Contractor denied to executed the agreement. Tender cancelled. Re-casted the estimate with new pipe rate in price 3 and submitted. TS approved, Re-Tendered. Package 4, As per the joint meeting with CE irrigation with our CE,it is decided to deposit weir AS amount 2.9 crore rupees in the Irrigation project. Irrigation dept is progressing towards AS for their project. In joint meeting with CE irrigation and CR IDRB conducted on 11/04/2022, CE IDRB informed that the design will be ready soon. Package 5, Got TS. Waiting for KIIFB package approval to start tendering process. Malappuram Project Dn AE3

No project review have been added to this project

Duration & Sanction dates

Date of start of Project 17/03/2020
Scheduled date of Completion of the Project 30 Nov 2023
Expected date of Completion 30/11/2023

Processing Dates

AS Date 13 Nov 2018
TS Date 12 Dec 2019

Other details

Project Officers View