20 Dec 2021 FHTC Geotagged-2952nos(geotagged today=03nos) FHTC total-2952Nos(today physical connection-03nos)Total pipe laid 12km , pressure testing done-7.5km Kollam Project Dn AE
19 Dec 2021 FHTC Geotagged-2949nos(geotagged today=04nos) FHTC total-2949Nos(today physical connection-04nos)Total pipe laid 12km , pressure testing done-7.5km Kollam Project Dn AE
17 Dec 2021 FHTC Geotagged-2945nos(geotagged today=08nos) FHTC total-2945Nos(today physical connection-08nos)Total pipe laid 12km , pressure testing done-7.5km Kollam Project Dn AE
16 Dec 2021 FHTC Geotagged-2937nos(geotagged today=0nos) FHTC total-2937Nos(today physical connection-0nos)Total pipe laid 12km , pressure testing done-7.5km Kollam Project Dn AE
15 Dec 2021 FHTC Geotagged-2937nos(geotagged today=15nos) FHTC total-2937Nos(today physical connection-15nos)Total pipe laid 12km , pressure testing done-7km Kollam Project Dn AE
13 Dec 2021 FHTC Geotagged-2922nos(geotagged today=11nos) FHTC total-2922Nos(today physical connection-11nos)Total pipe laid 12km , pressure testing done-7km Kollam Project Dn AE
11 Dec 2021 FHTC Geotagged-2911nos(geotagged today=04nos) FHTC total-2911Nos(today physical connection-04nos)Total pipe laid 12km , pressure testing done-7km Kollam Project Dn AE
09 Dec 2021 FHTC Geotagged-2907nos(geotagged today=16nos) FHTC total-2907Nos(today physical connection-16nos)Total pipe laid 12km , pressure testing done-7km Kollam Project Dn AE
07 Dec 2021 FHTC Geotagged-2891nos(geotagged today=14nos) FHTC total-2891Nos(today physical connection-14nos)Total pipe laid 12km , pressure testing done-7km Kollam Project Dn AE
06 Dec 2021 FHTC Geotagged-2877nos(geotagged today=07nos) FHTC total-2877Nos(today physical connection-07nos)Total pipe laid 12km , pressure testing done-7km Kollam Project Dn AE