15 Jun 2023 Jal Jeevan Mission-Augmentation of ARWSS to Mannar Kurattissery-Pipe line extension and providing FHTC to Mannar and Chennithala Panchayaths-160mm pvc laying in Puthuvillapadi-Kuttamperoor road 250mm DI laying in Kallumoodu to Kottamuri road in chennithala panchayath Alappuzha Project Dn PM
08 Jun 2023 Mannar-Puthalapadi to kuttamperoor road 160 pvc laying - 15 nos Koikal jn kuttamperoor road 160 mm Pvc - 30 Ward- 14,Chember work ,90 mm pvc 80 mm valve,Chennithala Ward-7Concrete road,90 mm pvc Laying - 12nos Ward-8 Culvert crossing -80mm GI,90 mm pvc - 6 nos Alappuzha Project Dn PM
01 Jun 2023 Laid 160 mm PVC , 200mm DI pipe and house connections. Alappuzha Project Dn PM
20 May 2023 Laying 200 mm DI pipe kayamkulam - thiruvalla road,Laying 160mm PVC pipe @ mannar panchayath, House connections ward 7 Chennithala panchayath Alappuzha Project Dn PM
15 May 2023 Chennithala ,ward-10 House connection, FHTC Alappuzha Project Dn PM
09 May 2023 Kayamkulam to thiruvalla road laying 200 DI - 10 nos, 160 PVC - 10 nos, Chennithala panchayath Ward -11 Laying @ Mannar chennithala Panchayat 90 PVC - 30 nos Ward - 9 Interconnection 90 mm Ward -16 Connection HTC - 4nos Alappuzha Project Dn PM
03 May 2023 Chennithala Kayamkulam - thiruvalla road DI 200 mm culvert crossing , 160 MS culvert crossing ,Chennithala cherukol 75 to 90 mm PVC interconnection Measured and tagged 30 connection @ Mannar chennithala Panchayat Alappuzha Project Dn PM
25 Apr 2023 Jal Jeevan Mission-Augmentation of ARWSS to Mannar Kurattissery-Pipe line extension and providing FHTC to Mannar and Chennithala Panchayaths- 90mm Interconnection work and Gsb laying ward 10 Alappuzha Project Dn PM
18 Apr 2023 Jal Jeevan Mission-Augmentation of ARWSS to Mannar Kurattissery-Pipe line extension and providing FHTC to Mannar and Chennithala Panchayaths-Chennithala Ward 5 -Interconnection work(90 to 90) Mannar Ward 5- 6 fhtc ,Ward 6 -6FHTC ,Interconnection 90 mm Ward 18 Concreting 40m(Restoration) Alappuzha Project Dn PM
12 Apr 2023 Chennithala Ward 5 -Interconnection work(90 to 90) Mannar Ward 5- 6 fhtc ,Ward 6 -6FHTC ,Interconnection 90 mm Ward 18 Concreting 40m(Restoration) Alappuzha Project Dn PM