AMRUT TSS- Laying Transmission main and sewer networks in Block J (Karimanal) Collection and Conveyance system- ( 8 packages)

Project AMRUT TSS- Laying Transmission main and sewer networks in Block J (Karimanal) Collection and Conveyance system- ( 8 packages)
Project Code TVMAMRUT0818645
Type Main project
Funding Agency AMRUT
Category AMRUT
Type of scheme Water Supply
Scheme AMRUT
Description sewer networks
Status On-going
District Thiruvananthapuram
Executing Office Trivandrum Project Dn
AS Amount (Rs) 150200000
AS Number GO(Rt)No.743/2020/WRD
TS Amount (Rs) 149600632
TS Number No. 1839/2019-2020,No. 21902/2021-2022,No. 19624/2021-2022,No. 20118/2021-2022,No. 20120/2021-2022,No. 20119/2021-2022
Total Bill Submitted (Rs) 6028758
Total Bill Paid (Rs) 6028758
Population Benefitted 28000
Capacity in MLD 2.56
Actual Project Completion Date 03 May 2021
Coverage Attipra and kulathoor area
Implementation Schedule Download
Work Plan Download

Packages

No. Project Name Location View
1 AMRUT - Laying Transmission Main and sewer networks in Block J ( Karimanal) Collection and Conveyance system -- Phase 1 - Laying 630mm HDPE Trunk main from New MH9 to New MH 17 by HDD Method- (Second Reach)-Package 1-Part 3 Trivandrum Project Dn
2 AMRUT -Laying Transmission Main & Sewer Networks in Block J (Karimanal) Collection and Conveyance system- BS1 - Laying Branch sewer From Karimanal Jn to Existing MH 3 in Trunk Main by HDD method-Package 2 Trivandrum Project Dn
3 AMRUT -Laying Transmission Main & Sewer Networks in Block J (Karimanal) Collection and Conveyance system-Construction of Manholes in TRUNK MAIN from Arasummood to Karimanal Pumping station- Package-1-Part-II Trivandrum Project Dn
4 AMRUT TSS- Laying Transmission main and sewer networks- Block J (Karimanal) Collection and Conveyance system- -Trunk Main from Arasumood to Karimanal Pumping Station-Package 1 Trivandrum Project Dn
5 AMURT - Laying Transmission Main and sewer networks in Block J ( Karimanal) Collection and Conveyance system -- Phase 1 -Laying of 500mm and 630mm HDPE Transmission main from Stilling Chamber to New MH 9 by HDD Method ( 1st Reach)-Package 1-Part 2 Trivandrum Project Dn
6 AMURT - Laying Transmission Main and sewer networks in Block J ( Karimanal) Collection and Conveyance system -- Phase 1 -Laying of 630mm HDPE Trunk main from New MH17 to Pump House Karimanal by HDD Method - (Third Reach)-Package 1-Part 4 Trivandrum Project Dn
7 Laying Interconnection sewer networks (for Household connections): from trunk main Man Holes on both sides of the road from Arasumoodu-Package 3 Trivandrum Project Dn
8 Laying Transmission Main and sewer networks in Block J ( Karimanal) Collection and Conveyance system -:Construction of Manholes in TRUNK MAIN from Arasummood to Karimanal Pumping station- Package 1-Part1 Trivandrum Project Dn

Overall Project Status

Status Date Overall Project Status Project Officer Contact
13 May 2024 PACKAGE- I - Due to poor performance, the original work is Terminated and Pre closed and balance work is arranged under 4 parts of Package 1 at Risk and Cost of the Contractor. PACKAGE -2- The scope of the work was Supply & laying 200mm HDPE pipe for a length of 130m. Pipe laying work has been completed. 2 nos precast base ring casted. One of the cover slab concreted. Second cover slab concrete completed. The contractor has been instructed to start the work immediately.PACKAGE-3 - As per the work was short closed by the Superintending Engineer. PACKAGE-1-PART 1 – MH construction Work -(Risk &Cost work) - Grit chamber final lift reinforcement work progressing. Package 1-Part2- MH construction Work-MH casting progressing . Package 1-Part 2- 1ST REACH- (Risk &Cost work) –Work completed. Package1-Part- 3-2ND REACH (Risk &Cost work) - Work completed. Package 1-Part 4- 3RD REACH (Risk &Cost work) - The scope of the work was Supply &laying 630mm HDPE pipe for a length of 703m by HDD method. 553m laid out of 703m. The remaining 150m length is in progress through open cut. Open cut pipe laying and MH construction are in progress near zam zam restaurant at Arasumoodu Road. Thiruvananthapuram Project AE9
10 May 2024 PACKAGE- I - Due to poor performance, the original work is Terminated and Pre closed and balance work is arranged under 4 parts of Package 1 at Risk and Cost of the Contractor. PACKAGE -2- The scope of the work was Supply & laying 200mm HDPE pipe for a length of 130m. Pipe laying work has been completed. 2 nos precast base ring casted. One of the cover slab concreted. Second cover slab concrete completed. The contractor has been instructed to start the work immediately.PACKAGE-3 - As per the work was short closed by the Superintending Engineer. PACKAGE-1-PART 1 – MH construction Work -(Risk &Cost work) - Grit chamber final lift reinforcement work progressing. Package 1-Part2- MH construction Work-MH casting progressing . Package 1-Part 2- 1ST REACH- (Risk &Cost work) –Work completed. Package1-Part- 3-2ND REACH (Risk &Cost work) - Work completed. Package 1-Part 4- 3RD REACH (Risk &Cost work) - The scope of the work was Supply &laying 630mm HDPE pipe for a length of 703m by HDD method. 553m laid out of 703m. The remaining 150m length is in progress through open cut. Open cut pipe laying and MH construction are in progress near zam zam restaurant at Arasumoodu Road. Thiruvananthapuram Project AE9
07 May 2024 PACKAGE- I - Due to poor performance, the original work is Terminated and Pre closed and balance work is arranged under 4 parts of Package 1 at Risk and Cost of the Contractor. PACKAGE -2- The scope of the work was Supply & laying 200mm HDPE pipe for a length of 130m. Pipe laying work has been completed. 2 nos precast base ring casted. One of the cover slab concreted. Second cover slab concrete completed. The contractor has been instructed to start the work immediately.PACKAGE-3 - As per the work was short closed by the Superintending Engineer. PACKAGE-1-PART 1 – MH construction Work -(Risk &Cost work) - Grit chamber final lift reinforcement work progressing. Package 1-Part2- MH construction Work-MH casting progressing . Package 1-Part 2- 1ST REACH- (Risk &Cost work) –Work completed. Package1-Part- 3-2ND REACH (Risk &Cost work) - Work completed. Package 1-Part 4- 3RD REACH (Risk &Cost work) - The scope of the work was Supply &laying 630mm HDPE pipe for a length of 703m by HDD method. 553m laid out of 703m. The remaining 150m length is in progress through open cut. Open cut pipe laying and MH construction are in progress near zam zam restaurant at Arasumoodu Road. Thiruvananthapuram Project AE9
02 May 2024 PACKAGE- I - Due to poor performance, the original work is Terminated and Pre closed and balance work is arranged under 4 parts of Package 1 at Risk and Cost of the Contractor. PACKAGE -2- The scope of the work was Supply & laying 200mm HDPE pipe for a length of 130m. Pipe laying work has been completed. 2 nos precast base ring casted. One of the cover slab concreted. Second cover slab concrete completed. The contractor has been instructed to start the work immediately.PACKAGE-3 - As per the work was short closed by the Superintending Engineer. PACKAGE-1-PART 1 – MH construction Work -(Risk &Cost work) - Grit chamber final lift reinforcement work progressing. Package 1-Part2- MH construction Work-MH casting progressing . Package 1-Part 2- 1ST REACH- (Risk &Cost work) –Work completed. Package1-Part- 3-2ND REACH (Risk &Cost work) - Work completed. Package 1-Part 4- 3RD REACH (Risk &Cost work) - The scope of the work was Supply &laying 630mm HDPE pipe for a length of 703m by HDD method. 553m laid out of 703m. The remaining 150m length is in progress through open cut. Open cut pipe laying and MH construction are in progress near zam zam restaurant at Arasumoodu Road. Thiruvananthapuram Project AE9
30 Apr 2024 PACKAGE- I - Due to poor performance, the original work is Terminated and Pre closed and balance work is arranged under 4 parts of Package 1 at Risk and Cost of the Contractor. PACKAGE -2- The scope of the work was Supply & laying 200mm HDPE pipe for a length of 130m. Pipe laying work has been completed. 2 nos precast base ring casted. One of the cover slab concreted. Second cover slab concrete completed. The contractor has been instructed to start the work immediately.PACKAGE-3 - As per the work was short closed by the Superintending Engineer. PACKAGE-1-PART 1 – MH construction Work -(Risk &Cost work) - Grit chamber final lift reinforcement work progressing. Package 1-Part2- MH construction Work-MH casting progressing . Package 1-Part 2- 1ST REACH- (Risk &Cost work) –Work completed. Package1-Part- 3-2ND REACH (Risk &Cost work) - Work completed. Package 1-Part 4- 3RD REACH (Risk &Cost work) - The scope of the work was Supply &laying 630mm HDPE pipe for a length of 703m by HDD method. 553m laid out of 703m. The remaining 150m length is in progress through open cut. Open cut pipe laying and MH construction are in progress near zam zam restaurant at Arasumoodu Road. Thiruvananthapuram Project AE9

No project review have been added to this project

Duration & Sanction dates

Date of start of Project 09/08/2019
Scheduled date of Completion of the Project 03 May 2021
Expected date of Completion 31/05/2023

Processing Dates

AS Date 02 Nov 2017
TS Date 26 Mar 2018

Other details

Project Officers View