AMRUT TSS- Laying Transmission main and sewer networks in Block J (Karimanal) Collection and Conveyance system- ( 8 packages)
Project |
AMRUT TSS- Laying Transmission main and sewer networks in Block J (Karimanal) Collection and Conveyance system- ( 8 packages) |
Project Code |
TVMAMRUT0818645 |
Type |
Main project |
Funding Agency |
AMRUT |
Category |
AMRUT |
Type of scheme |
Water Supply |
Scheme |
AMRUT |
Description |
sewer networks
|
Status |
On-going |
District |
Thiruvananthapuram |
Executing Office |
Trivandrum Project Dn |
AS Amount (Rs) |
150200000
|
AS Number |
GO(Rt)No.743/2020/WRD |
TS Amount (Rs) |
149600632 |
TS Number |
No. 1839/2019-2020,No. 21902/2021-2022,No. 19624/2021-2022,No. 20118/2021-2022,No. 20120/2021-2022,No. 20119/2021-2022 |
Total Bill Submitted (Rs) |
6028758 |
Total Bill Paid (Rs) |
6028758 |
Population Benefitted |
28000 |
Capacity in MLD |
2.56 |
Actual Project Completion Date |
03 May 2021 |
Coverage |
Attipra and kulathoor area |
Implementation Schedule |
Download |
Work Plan |
Download |
Packages
No. |
Project Name |
Location |
View |
1 |
AMRUT - Laying Transmission Main and sewer networks in Block J ( Karimanal) Collection and Conveyance system -- Phase 1 - Laying 630mm HDPE Trunk main from New MH9 to New MH 17 by HDD Method- (Second Reach)-Package 1-Part 3 |
Trivandrum Project Dn |
|
2 |
AMRUT -Laying Transmission Main & Sewer Networks in Block J (Karimanal) Collection and Conveyance system- BS1 - Laying Branch sewer From Karimanal Jn to Existing MH 3 in Trunk Main by HDD method-Package 2 |
Trivandrum Project Dn |
|
3 |
AMRUT -Laying Transmission Main & Sewer Networks in Block J (Karimanal) Collection and Conveyance system-Construction of Manholes in TRUNK MAIN from Arasummood to Karimanal Pumping station- Package-1-Part-II |
Trivandrum Project Dn |
|
4 |
AMRUT TSS- Laying Transmission main and sewer networks- Block J (Karimanal) Collection and Conveyance system- -Trunk Main from Arasumood to Karimanal Pumping Station-Package 1 |
Trivandrum Project Dn |
|
5 |
AMURT - Laying Transmission Main and sewer networks in Block J ( Karimanal) Collection and Conveyance system -- Phase 1 -Laying of 500mm and 630mm HDPE Transmission main from Stilling Chamber to New MH 9 by HDD Method ( 1st Reach)-Package 1-Part 2 |
Trivandrum Project Dn |
|
6 |
AMURT - Laying Transmission Main and sewer networks in Block J ( Karimanal) Collection and Conveyance system -- Phase 1 -Laying of 630mm HDPE Trunk main from New MH17 to Pump House Karimanal by HDD Method - (Third Reach)-Package 1-Part 4 |
Trivandrum Project Dn |
|
7 |
Laying Interconnection sewer networks (for Household connections): from trunk main Man Holes on both sides of the road from Arasumoodu-Package 3 |
Trivandrum Project Dn |
|
8 |
Laying Transmission Main and sewer networks in Block J ( Karimanal) Collection and Conveyance system -:Construction of Manholes in TRUNK MAIN from Arasummood to Karimanal Pumping station- Package 1-Part1 |
Trivandrum Project Dn |
|
Overall Project Status
Status Date |
Overall Project Status |
Project Officer |
Contact |
13 May 2024 |
PACKAGE- I - Due to poor performance, the original work is Terminated and Pre closed and balance work is arranged under 4 parts of Package 1 at Risk and Cost of the Contractor. PACKAGE -2- The scope of the work was Supply & laying 200mm HDPE pipe for a length of 130m. Pipe laying work has been completed. 2 nos precast base ring casted. One of the cover slab concreted. Second cover slab concrete completed. The contractor has been instructed to start the work immediately.PACKAGE-3 - As per the work was short closed by the Superintending Engineer. PACKAGE-1-PART 1 – MH construction Work -(Risk &Cost work) - Grit chamber final lift reinforcement work progressing. Package 1-Part2- MH construction Work-MH casting progressing . Package 1-Part 2- 1ST REACH- (Risk &Cost work) –Work completed. Package1-Part- 3-2ND REACH (Risk &Cost work) - Work completed. Package 1-Part 4- 3RD REACH (Risk &Cost work) - The scope of the work was Supply &laying 630mm HDPE pipe for a length of 703m by HDD method. 553m laid out of 703m. The remaining 150m length is in progress through open cut. Open cut pipe laying and MH construction are in progress near zam zam restaurant at Arasumoodu Road. |
Thiruvananthapuram Project AE9 |
|
10 May 2024 |
PACKAGE- I - Due to poor performance, the original work is Terminated and Pre closed and balance work is arranged under 4 parts of Package 1 at Risk and Cost of the Contractor. PACKAGE -2- The scope of the work was Supply & laying 200mm HDPE pipe for a length of 130m. Pipe laying work has been completed. 2 nos precast base ring casted. One of the cover slab concreted. Second cover slab concrete completed. The contractor has been instructed to start the work immediately.PACKAGE-3 - As per the work was short closed by the Superintending Engineer. PACKAGE-1-PART 1 – MH construction Work -(Risk &Cost work) - Grit chamber final lift reinforcement work progressing. Package 1-Part2- MH construction Work-MH casting progressing . Package 1-Part 2- 1ST REACH- (Risk &Cost work) –Work completed. Package1-Part- 3-2ND REACH (Risk &Cost work) - Work completed. Package 1-Part 4- 3RD REACH (Risk &Cost work) - The scope of the work was Supply &laying 630mm HDPE pipe for a length of 703m by HDD method. 553m laid out of 703m. The remaining 150m length is in progress through open cut. Open cut pipe laying and MH construction are in progress near zam zam restaurant at Arasumoodu Road. |
Thiruvananthapuram Project AE9 |
|
07 May 2024 |
PACKAGE- I - Due to poor performance, the original work is Terminated and Pre closed and balance work is arranged under 4 parts of Package 1 at Risk and Cost of the Contractor. PACKAGE -2- The scope of the work was Supply & laying 200mm HDPE pipe for a length of 130m. Pipe laying work has been completed. 2 nos precast base ring casted. One of the cover slab concreted. Second cover slab concrete completed. The contractor has been instructed to start the work immediately.PACKAGE-3 - As per the work was short closed by the Superintending Engineer. PACKAGE-1-PART 1 – MH construction Work -(Risk &Cost work) - Grit chamber final lift reinforcement work progressing. Package 1-Part2- MH construction Work-MH casting progressing . Package 1-Part 2- 1ST REACH- (Risk &Cost work) –Work completed. Package1-Part- 3-2ND REACH (Risk &Cost work) - Work completed. Package 1-Part 4- 3RD REACH (Risk &Cost work) - The scope of the work was Supply &laying 630mm HDPE pipe for a length of 703m by HDD method. 553m laid out of 703m. The remaining 150m length is in progress through open cut. Open cut pipe laying and MH construction are in progress near zam zam restaurant at Arasumoodu Road. |
Thiruvananthapuram Project AE9 |
|
02 May 2024 |
PACKAGE- I - Due to poor performance, the original work is Terminated and Pre closed and balance work is arranged under 4 parts of Package 1 at Risk and Cost of the Contractor. PACKAGE -2- The scope of the work was Supply & laying 200mm HDPE pipe for a length of 130m. Pipe laying work has been completed. 2 nos precast base ring casted. One of the cover slab concreted. Second cover slab concrete completed. The contractor has been instructed to start the work immediately.PACKAGE-3 - As per the work was short closed by the Superintending Engineer. PACKAGE-1-PART 1 – MH construction Work -(Risk &Cost work) - Grit chamber final lift reinforcement work progressing. Package 1-Part2- MH construction Work-MH casting progressing . Package 1-Part 2- 1ST REACH- (Risk &Cost work) –Work completed. Package1-Part- 3-2ND REACH (Risk &Cost work) - Work completed. Package 1-Part 4- 3RD REACH (Risk &Cost work) - The scope of the work was Supply &laying 630mm HDPE pipe for a length of 703m by HDD method. 553m laid out of 703m. The remaining 150m length is in progress through open cut. Open cut pipe laying and MH construction are in progress near zam zam restaurant at Arasumoodu Road. |
Thiruvananthapuram Project AE9 |
|
30 Apr 2024 |
PACKAGE- I - Due to poor performance, the original work is Terminated and Pre closed and balance work is arranged under 4 parts of Package 1 at Risk and Cost of the Contractor. PACKAGE -2- The scope of the work was Supply & laying 200mm HDPE pipe for a length of 130m. Pipe laying work has been completed. 2 nos precast base ring casted. One of the cover slab concreted. Second cover slab concrete completed. The contractor has been instructed to start the work immediately.PACKAGE-3 - As per the work was short closed by the Superintending Engineer. PACKAGE-1-PART 1 – MH construction Work -(Risk &Cost work) - Grit chamber final lift reinforcement work progressing. Package 1-Part2- MH construction Work-MH casting progressing . Package 1-Part 2- 1ST REACH- (Risk &Cost work) –Work completed. Package1-Part- 3-2ND REACH (Risk &Cost work) - Work completed. Package 1-Part 4- 3RD REACH (Risk &Cost work) - The scope of the work was Supply &laying 630mm HDPE pipe for a length of 703m by HDD method. 553m laid out of 703m. The remaining 150m length is in progress through open cut. Open cut pipe laying and MH construction are in progress near zam zam restaurant at Arasumoodu Road. |
Thiruvananthapuram Project AE9 |
|
No project review have been added to this project
Duration & Sanction dates
Date of start of Project |
09/08/2019 |
Scheduled date of Completion of the Project |
03 May 2021 |
Expected date of Completion |
31/05/2023 |
Processing Dates
AS Date |
02 Nov 2017 |
TS Date |
26 Mar 2018 |