13th finance commission award -Grant for kuttanad development proposal of KWA for completing the clean water transmission main of the kuttanad water supply augmentation scheme
Project |
13th finance commission award -Grant for kuttanad development proposal of KWA for completing the clean water transmission main of the kuttanad water supply augmentation scheme |
Project Code |
ALPGOK1013621 |
Type |
Main project |
Funding Agency |
GOK |
Category |
Completion of Ongoing Rural WSS |
Type of scheme |
Water Supply |
Scheme |
2215-02-106-97 |
Description |
13th finance commission award -Grant for kuttanad development proposal of KWA for completing the clear water transmission main of the kuttanad water supply augmentation scheme |
Status |
Completed |
District |
Alappuzha |
Executing Office |
KIIFB Projects (ALP) |
AS Amount (Rs) |
700000000
|
AS Number |
WS/107/2013-14 |
TS Amount (Rs) |
700000000 |
TS Number |
KWA/CE(SR)/45/2013-14 |
Total Bill Submitted (Rs) |
568300000 |
Total Bill Paid (Rs) |
568300000 |
Population Benefitted |
115880 |
Capacity in MLD |
14.00 |
Actual Project Completion Date |
31 May 2023 |
Coverage |
Distribution network in Muttar, Veliyanad,Edathua,Thalavady, Thakazhy and Neelamperoor panchayaths .Transmission lines to veliyanad, Neelamperoor, veeyapuram,Ramankary, Chambakkulam, Pulinkunnu and Kavalam panchayaths.4.5LL OHSR at Thakazhy panchayath. |
Implementation Schedule |
Download |
Work Plan |
Download |
Packages
No. |
Project Name |
Location |
View |
1 |
Package- III-13th finance Commission-Aug of kuttanad WSS supply ,laying,testing and commissioning of transmission pipe using various size of HDPE & DI (pipe for distribution system 1 and construction of 4.5 LL capacity OH tank at Thakazhy) |
Alappuzha Project Dn |
|
2 |
Package -II-Transmission system II-13th finance commission-Aug of kuttanad WSS supply ,laying,testing and commissioning of transmission pipe using various size of HDPE pipe ranging from 200mm to 800mm(Neerettupuram to Mampuzhakary and Pallikkuttumma to Kavalam) |
Alappuzha Project Dn |
|
3 |
Package-I-Transmission system I-13th Finance Commission - Aug: of Kuttanad WSS-Supply,laying,jointing,testing and commissioning of HDPE pipe ranging from 200mm to 500mm for system I(Kidangara to Neelamperoor and Edathua to Veeyapuram) |
Alappuzha Project Dn |
|
Overall Project Status
Status Date |
Overall Project Status |
Project Officer |
Contact |
06 Dec 2023 |
Package 1,2 & 3 completed. |
Alappuzha KIIFB - AE 1 |
|
30 May 2022 |
Package 1&2 completed. Under package 3, 36.8 km pipe line out of 46 km distribution mains to 6 panchayats completed. The MS fabrication work at Muttar panchayath 12 nos. gap completed.90 mm HDPE pipe laying at Veliyanad panchayath 800m completed. Contractor not carrying out balance works. Notice issued to contractor to complete the balance work otherwise will be arranged at his risk and cost. Soil investigation works for railway crossing arranged through NIT Kozhikkode. |
Alappuzha KIIFB - AE 1 |
|
08 Jan 2022 |
Package 1&2 completed. Under package 3, 36.8 km pipe line out of 46 km distribution mains to 6 panchayats completed. MS fabrication works in Muttar panchayat is in progress. Soil investigation works for railway crossing arranged |
Alappuzha KIIFB - AE 1 |
|
08 Jan 2022 |
Package 1&2 completed. Under package 3, 36.8 km pipe line out of 46 km distribution mains to 6 panchayats completed. The MS fabrication works in Muttar panchath is in progress. Soil investigation works for railway crossing arranged and report to railway can be submitted by 31/12/2021. |
Alappuzha KIIFB - AE 1 |
|
20 Dec 2021 |
Package 1&2 completed. Under package 3, 36.8 km pipe line out of 46 km distribution mains to 6 panchayats completed. Pipe laying works, gap closing and interconnection works could not be proceeded due to rise in water table during heavy rains. Work resumed on 17/12/2021.
Soil investigation works for railway crossing arranged and report to railway can be submitted by 31/12/2021. |
Alappuzha KIIFB - AE 1 |
|
No project review have been added to this project
Duration & Sanction dates
Date of start of Project |
14/07/2014 |
Scheduled date of Completion of the Project |
02 Feb 2016 |
Expected date of Completion |
31/01/2022 |
Processing Dates
AS Date |
28 Dec 2013 |
TS Date |
01 Jan 2014 |