Overall Project Status

Status Date Overall Project Status Project Officer Contact
13 Feb 2026 KIIFB PACKAGE II PHASE I 92% CompletedTOTAL PIPE LAID 6.618km laid/8 km pipe. House connections- 3377 Nos provided/out of 6055, FHTC: 79 Nos. 1.) 90mm PVC 6 kg -3.110 km laid 2) 80mm GI pipe- 3.508 Km laidKIIFB PACKAGE II PHASE III 86% Completed Various dia of pvc pipes and GI pipes are supplied at site Total supply-123 km, Total pipe laid – 113.53 km /123 km 1.) 90 mm 6 kg 49350 m supplied and 40912.35 m laid 2.) 90 mm 8 kg-37386 m supplied and 36910.50 m laid 3.) 90mm 10 kg – 240 m supplied and 240 m laid 4) 110mm 6 kg – 4278 m supplied and 4278 m laid 5) 110mm 8kg - 5268 m supplied and 4896 m laid 6) 140mm 6kg - 5620 m supplied 5542 m laid 7) 140mm 8 kg - 1953 m supplied and 1911 m laid 8) 160 mm 6 kg - 2928 m supplied and 2880 m laid 9) 160 mm 8 kg - 1050 m supplied 1014.50 m laid 10) 80 mm GI- 2580 m laid and 2067.30 m laid 11) 100 mm GI - 312 m supplied and 311.30 m laid 12) 125mm GI – 130 m supplied and 130 m laid 13) 150MM GI - 136.50 m supplied and 108.60 m laid 14) 450MM DI - 2189 m supplied and 2051.5 m laid 15) 200mm DI -1977.50 m supplied and 1977.50 m laid 16) 250mm DI -2915 m supplied and 2909.50 m laid 17) 400MM DI - 2833.00 m supplied and 2820.30 m laid 18) 350mm DI - 1772.5 m supplied and 1767 m 19) 300MM DI - 807 m supplied and 807 m laidKIIFB PHASE II PACKAGE II PART I 72% Completed work foreclosed -72% of work completed (1300 FHTC provided. Various dia of pvc pipes and GI pipes are supplied at site Total supply-120 km, Total laid- 100.500 km /out of 120km , ) balance work arranged in kiifb ,its tender procedure processingKIIFB PHASE II PACKAGE II PART II 16% Completed 200mm DI=489.5m,90/6kg=5009m,90/8kg=948m,110/8kg=150m,110/6kg=1174m,140/6 kg=666m,250mm DI=181.5m,350mm DI=2920.5m,160/6kg=653m Chittur Project Dn - AE 3
11 Feb 2026 KIIFB PACKAGE II PHASE I 92% CompletedTOTAL PIPE LAID 6.618km laid/8 km pipe. House connections- 3377 Nos provided/out of 6055, FHTC: 79 Nos. 1.) 90mm PVC 6 kg -3.110 km laid 2) 80mm GI pipe- 3.508 Km laidKIIFB PACKAGE II PHASE III 86% Completed Various dia of pvc pipes and GI pipes are supplied at site Total supply-123 km, Total pipe laid – 113.53 km /123 km 1.) 90 mm 6 kg 49350 m supplied and 40912.35 m laid 2.) 90 mm 8 kg-37386 m supplied and 36910.50 m laid 3.) 90mm 10 kg – 240 m supplied and 240 m laid 4) 110mm 6 kg – 4278 m supplied and 4278 m laid 5) 110mm 8kg - 5268 m supplied and 4896 m laid 6) 140mm 6kg - 5620 m supplied 5542 m laid 7) 140mm 8 kg - 1953 m supplied and 1911 m laid 8) 160 mm 6 kg - 2928 m supplied and 2880 m laid 9) 160 mm 8 kg - 1050 m supplied 1014.50 m laid 10) 80 mm GI- 2580 m laid and 2067.30 m laid 11) 100 mm GI - 312 m supplied and 311.30 m laid 12) 125mm GI – 130 m supplied and 130 m laid 13) 150MM GI - 136.50 m supplied and 108.60 m laid 14) 450MM DI - 2189 m supplied and 2051.5 m laid 15) 200mm DI -1977.50 m supplied and 1977.50 m laid 16) 250mm DI -2915 m supplied and 2909.50 m laid 17) 400MM DI - 2833.00 m supplied and 2820.30 m laid 18) 350mm DI - 1772.5 m supplied and 1767 m 19) 300MM DI - 807 m supplied and 807 m laidKIIFB PHASE II PACKAGE II PART I 72% Completed work foreclosed -72% of work completed (1300 FHTC provided. Various dia of pvc pipes and GI pipes are supplied at site Total supply-120 km, Total laid- 100.500 km /out of 120km , ) balance work arranged in kiifb ,its tender procedure processingKIIFB PHASE II PACKAGE II PART II 16% Completed 200mm DI=489.5m,90/6kg=4907m,90/8kg=948m,110/8kg=150m,110/6kg=1174m,140/6 kg=666m,250mm DI=181.5m,350mm DI=2920.5m,160/6kg=653m Chittur Project Dn - AE 3
09 Feb 2026 KIIFB PACKAGE II PHASE I 92% CompletedTOTAL PIPE LAID 6.618km laid/8 km pipe. House connections- 3377 Nos provided/out of 6055, FHTC: 79 Nos. 1.) 90mm PVC 6 kg -3.110 km laid 2) 80mm GI pipe- 3.508 Km laidKIIFB PACKAGE II PHASE III 86% Completed Various dia of pvc pipes and GI pipes are supplied at site Total supply-123 km, Total pipe laid – 113.53 km /123 km 1.) 90 mm 6 kg 49350 m supplied and 40912.35 m laid 2.) 90 mm 8 kg-37386 m supplied and 36910.50 m laid 3.) 90mm 10 kg – 240 m supplied and 240 m laid 4) 110mm 6 kg – 4278 m supplied and 4278 m laid 5) 110mm 8kg - 5268 m supplied and 4896 m laid 6) 140mm 6kg - 5620 m supplied 5542 m laid 7) 140mm 8 kg - 1953 m supplied and 1911 m laid 8) 160 mm 6 kg - 2928 m supplied and 2880 m laid 9) 160 mm 8 kg - 1050 m supplied 1014.50 m laid 10) 80 mm GI- 2580 m laid and 2067.30 m laid 11) 100 mm GI - 312 m supplied and 311.30 m laid 12) 125mm GI – 130 m supplied and 130 m laid 13) 150MM GI - 136.50 m supplied and 108.60 m laid 14) 450MM DI - 2189 m supplied and 2051.5 m laid 15) 200mm DI -1977.50 m supplied and 1977.50 m laid 16) 250mm DI -2915 m supplied and 2909.50 m laid 17) 400MM DI - 2833.00 m supplied and 2820.30 m laid 18) 350mm DI - 1772.5 m supplied and 1767 m 19) 300MM DI - 807 m supplied and 807 m laidKIIFB PHASE II PACKAGE II PART I 72% Completed work foreclosed -72% of work completed (1300 FHTC provided. Various dia of pvc pipes and GI pipes are supplied at site Total supply-120 km, Total laid- 100.500 km /out of 120km , ) balance work arranged in kiifb ,its tender procedure processingKIIFB PHASE II PACKAGE II PART II 16% Completed 200mm DI=489.5m,90/6kg=4907m,90/8kg=948m,110/8kg=150m,110/6kg=1174m,140/6 kg=666m,250mm DI=181.5m,350mm DI=2920.5m,160/6kg=653m Chittur Project Dn - AE 3
06 Feb 2026 KIIFB PACKAGE II PHASE I 92% CompletedTOTAL PIPE LAID 6.618km laid/8 km pipe. House connections- 3377 Nos provided/out of 6055, FHTC: 79 Nos. 1.) 90mm PVC 6 kg -3.110 km laid 2) 80mm GI pipe- 3.508 Km laidKIIFB PACKAGE II PHASE III 86% Completed Various dia of pvc pipes and GI pipes are supplied at site Total supply-123 km, Total pipe laid – 113.53 km /123 km 1.) 90 mm 6 kg 49350 m supplied and 40912.35 m laid 2.) 90 mm 8 kg-37386 m supplied and 36910.50 m laid 3.) 90mm 10 kg – 240 m supplied and 240 m laid 4) 110mm 6 kg – 4278 m supplied and 4278 m laid 5) 110mm 8kg - 5268 m supplied and 4896 m laid 6) 140mm 6kg - 5620 m supplied 5542 m laid 7) 140mm 8 kg - 1953 m supplied and 1911 m laid 8) 160 mm 6 kg - 2928 m supplied and 2880 m laid 9) 160 mm 8 kg - 1050 m supplied 1014.50 m laid 10) 80 mm GI- 2580 m laid and 2067.30 m laid 11) 100 mm GI - 312 m supplied and 311.30 m laid 12) 125mm GI – 130 m supplied and 130 m laid 13) 150MM GI - 136.50 m supplied and 108.60 m laid 14) 450MM DI - 2189 m supplied and 2051.5 m laid 15) 200mm DI -1977.50 m supplied and 1977.50 m laid 16) 250mm DI -2915 m supplied and 2909.50 m laid 17) 400MM DI - 2833.00 m supplied and 2820.30 m laid 18) 350mm DI - 1772.5 m supplied and 1767 m 19) 300MM DI - 807 m supplied and 807 m laidKIIFB PHASE II PACKAGE II PART I 72% Completed work foreclosed -72% of work completed (1300 FHTC provided. Various dia of pvc pipes and GI pipes are supplied at site Total supply-120 km, Total laid- 100.500 km /out of 120km , ) balance work arranged in kiifb ,its tender procedure processingKIIFB PHASE II PACKAGE II PART II 16% Completed 200mm DI=489.5m,90/6kg=4865m,90/8kg=948m,110/8kg=150m,110/6kg=1174m,140/6 kg=666m,250mm DI=181.5m,350mm DI=2920.5m,160/6kg=653m Chittur Project Dn - AE 3
04 Feb 2026 KIIFB PACKAGE II PHASE I 92% CompletedTOTAL PIPE LAID 6.618km laid/8 km pipe. House connections- 3377 Nos provided/out of 6055, FHTC: 79 Nos. 1.) 90mm PVC 6 kg -3.110 km laid 2) 80mm GI pipe- 3.508 Km laidKIIFB PACKAGE II PHASE III 86% Completed Various dia of pvc pipes and GI pipes are supplied at site Total supply-123 km, Total pipe laid – 113.53 km /123 km 1.) 90 mm 6 kg 49350 m supplied and 40912.35 m laid 2.) 90 mm 8 kg-37386 m supplied and 36910.50 m laid 3.) 90mm 10 kg – 240 m supplied and 240 m laid 4) 110mm 6 kg – 4278 m supplied and 4278 m laid 5) 110mm 8kg - 5268 m supplied and 4896 m laid 6) 140mm 6kg - 5620 m supplied 5542 m laid 7) 140mm 8 kg - 1953 m supplied and 1911 m laid 8) 160 mm 6 kg - 2928 m supplied and 2880 m laid 9) 160 mm 8 kg - 1050 m supplied 1014.50 m laid 10) 80 mm GI- 2580 m laid and 2067.30 m laid 11) 100 mm GI - 312 m supplied and 311.30 m laid 12) 125mm GI – 130 m supplied and 130 m laid 13) 150MM GI - 136.50 m supplied and 108.60 m laid 14) 450MM DI - 2189 m supplied and 2051.5 m laid 15) 200mm DI -1977.50 m supplied and 1977.50 m laid 16) 250mm DI -2915 m supplied and 2909.50 m laid 17) 400MM DI - 2833.00 m supplied and 2820.30 m laid 18) 350mm DI - 1772.5 m supplied and 1767 m 19) 300MM DI - 807 m supplied and 807 m laidKIIFB PHASE II PACKAGE II PART I 72% Completed work foreclosed -72% of work completed (1300 FHTC provided. Various dia of pvc pipes and GI pipes are supplied at site Total supply-120 km, Total laid- 100.500 km /out of 120km , ) balance work arranged in kiifb ,its tender procedure processingKIIFB PHASE II PACKAGE II PART II 16% Completed 200mm DI=489.5m,90/6kg=4787m,90/8kg=948m,110/8kg=150m,110/6kg=1174m,140/6 kg=666m,250mm DI=181.5m,350mm DI=2920.5m,160/6kg=653m Chittur Project Dn - AE 3
02 Feb 2026 KIIFB PACKAGE II PHASE I 92% CompletedTOTAL PIPE LAID 6.618km laid/8 km pipe. House connections- 3377 Nos provided/out of 6055, FHTC: 79 Nos. 1.) 90mm PVC 6 kg -3.110 km laid 2) 80mm GI pipe- 3.508 Km laidKIIFB PACKAGE II PHASE III 86% Completed Various dia of pvc pipes and GI pipes are supplied at site Total supply-123 km, Total pipe laid – 113.53 km /123 km 1.) 90 mm 6 kg 49350 m supplied and 40912.35 m laid 2.) 90 mm 8 kg-37386 m supplied and 36910.50 m laid 3.) 90mm 10 kg – 240 m supplied and 240 m laid 4) 110mm 6 kg – 4278 m supplied and 4278 m laid 5) 110mm 8kg - 5268 m supplied and 4896 m laid 6) 140mm 6kg - 5620 m supplied 5542 m laid 7) 140mm 8 kg - 1953 m supplied and 1911 m laid 8) 160 mm 6 kg - 2928 m supplied and 2880 m laid 9) 160 mm 8 kg - 1050 m supplied 1014.50 m laid 10) 80 mm GI- 2580 m laid and 2067.30 m laid 11) 100 mm GI - 312 m supplied and 311.30 m laid 12) 125mm GI – 130 m supplied and 130 m laid 13) 150MM GI - 136.50 m supplied and 108.60 m laid 14) 450MM DI - 2189 m supplied and 2051.5 m laid 15) 200mm DI -1977.50 m supplied and 1977.50 m laid 16) 250mm DI -2915 m supplied and 2909.50 m laid 17) 400MM DI - 2833.00 m supplied and 2820.30 m laid 18) 350mm DI - 1772.5 m supplied and 1767 m 19) 300MM DI - 807 m supplied and 807 m laidKIIFB PHASE II PACKAGE II PART I 72% Completed work foreclosed -72% of work completed (1300 FHTC provided. Various dia of pvc pipes and GI pipes are supplied at site Total supply-120 km, Total laid- 100.500 km /out of 120km , ) balance work arranged in kiifb ,its tender procedure processingKIIFB PHASE II PACKAGE II PART II 16% Completed 200mm DI=489.5m,90/6kg=4751m,90/8kg=948m,110/8kg=150m,110/6kg=1174m,140/6 kg=666m,250mm DI=181.5m,350mm DI=2920.5m,160/6kg=653m Chittur Project Dn - AE 3
29 Jan 2026 KIIFB PACKAGE II PHASE I 92% CompletedTOTAL PIPE LAID 6.618km laid/8 km pipe. House connections- 3377 Nos provided/out of 6055, FHTC: 79 Nos. 1.) 90mm PVC 6 kg -3.110 km laid 2) 80mm GI pipe- 3.508 Km laidKIIFB PACKAGE II PHASE III 86% Completed Various dia of pvc pipes and GI pipes are supplied at site Total supply-123 km, Total pipe laid – 113.53 km /123 km 1.) 90 mm 6 kg 49350 m supplied and 40912.35 m laid 2.) 90 mm 8 kg-37386 m supplied and 36910.50 m laid 3.) 90mm 10 kg – 240 m supplied and 240 m laid 4) 110mm 6 kg – 4278 m supplied and 4278 m laid 5) 110mm 8kg - 5268 m supplied and 4896 m laid 6) 140mm 6kg - 5620 m supplied 5542 m laid 7) 140mm 8 kg - 1953 m supplied and 1911 m laid 8) 160 mm 6 kg - 2928 m supplied and 2880 m laid 9) 160 mm 8 kg - 1050 m supplied 1014.50 m laid 10) 80 mm GI- 2580 m laid and 2067.30 m laid 11) 100 mm GI - 312 m supplied and 311.30 m laid 12) 125mm GI – 130 m supplied and 130 m laid 13) 150MM GI - 136.50 m supplied and 108.60 m laid 14) 450MM DI - 2189 m supplied and 2051.5 m laid 15) 200mm DI -1977.50 m supplied and 1977.50 m laid 16) 250mm DI -2915 m supplied and 2909.50 m laid 17) 400MM DI - 2833.00 m supplied and 2820.30 m laid 18) 350mm DI - 1772.5 m supplied and 1767 m 19) 300MM DI - 807 m supplied and 807 m laidKIIFB PHASE II PACKAGE II PART I 72% Completed work foreclosed -72% of work completed (1300 FHTC provided. Various dia of pvc pipes and GI pipes are supplied at site Total supply-120 km, Total laid- 100.500 km /out of 120km , ) balance work arranged in kiifb ,its tender procedure processingKIIFB PHASE II PACKAGE II PART II 16% Completed 200mm DI=297m,90/6kg=4493m,90/8kg=948m,110/8kg=150m,110/6kg=1174m,140/6 kg=576m,250mm DI=181.5m,350mm DI=2920.5m,160/6kg=576m Chittur Project Dn - AE 3
27 Jan 2026 KIIFB PACKAGE II PHASE I 92% CompletedTOTAL PIPE LAID 6.618km laid/8 km pipe. House connections- 3377 Nos provided/out of 6055, FHTC: 79 Nos. 1.) 90mm PVC 6 kg -3.110 km laid 2) 80mm GI pipe- 3.508 Km laidKIIFB PACKAGE II PHASE III 86% Completed Various dia of pvc pipes and GI pipes are supplied at site Total supply-123 km, Total pipe laid – 113.53 km /123 km 1.) 90 mm 6 kg 49350 m supplied and 40912.35 m laid 2.) 90 mm 8 kg-37386 m supplied and 36910.50 m laid 3.) 90mm 10 kg – 240 m supplied and 240 m laid 4) 110mm 6 kg – 4278 m supplied and 4278 m laid 5) 110mm 8kg - 5268 m supplied and 4896 m laid 6) 140mm 6kg - 5620 m supplied 5542 m laid 7) 140mm 8 kg - 1953 m supplied and 1911 m laid 8) 160 mm 6 kg - 2928 m supplied and 2880 m laid 9) 160 mm 8 kg - 1050 m supplied 1014.50 m laid 10) 80 mm GI- 2580 m laid and 2067.30 m laid 11) 100 mm GI - 312 m supplied and 311.30 m laid 12) 125mm GI – 130 m supplied and 130 m laid 13) 150MM GI - 136.50 m supplied and 108.60 m laid 14) 450MM DI - 2189 m supplied and 2051.5 m laid 15) 200mm DI -1977.50 m supplied and 1977.50 m laid 16) 250mm DI -2915 m supplied and 2909.50 m laid 17) 400MM DI - 2833.00 m supplied and 2820.30 m laid 18) 350mm DI - 1772.5 m supplied and 1767 m 19) 300MM DI - 807 m supplied and 807 m laidKIIFB PHASE II PACKAGE II PART I 72% Completed work foreclosed -72% of work completed (1300 FHTC provided. Various dia of pvc pipes and GI pipes are supplied at site Total supply-120 km, Total laid- 100.500 km /out of 120km , ) balance work arranged in kiifb ,its tender procedure processingKIIFB PHASE II PACKAGE II PART II 16% Completed 200mm DI=297m,90/6kg=4493m,90/8kg=948m,110/8kg=150m,110/6kg=1174m,140/6 kg=540m,250mm DI=181.5m,350mm DI=2920.5m,160/6kg=396m Chittur Project Dn - AE 3
23 Jan 2026 KIIFB PACKAGE II PHASE I 92% CompletedTOTAL PIPE LAID 6.618km laid/8 km pipe. House connections- 3377 Nos provided/out of 6055, FHTC: 79 Nos. 1.) 90mm PVC 6 kg -3.110 km laid 2) 80mm GI pipe- 3.508 Km laidKIIFB PACKAGE II PHASE III 86% Completed Various dia of pvc pipes and GI pipes are supplied at site Total supply-123 km, Total pipe laid – 113.53 km /123 km 1.) 90 mm 6 kg 49350 m supplied and 40912.35 m laid 2.) 90 mm 8 kg-37386 m supplied and 36910.50 m laid 3.) 90mm 10 kg – 240 m supplied and 240 m laid 4) 110mm 6 kg – 4278 m supplied and 4278 m laid 5) 110mm 8kg - 5268 m supplied and 4896 m laid 6) 140mm 6kg - 5620 m supplied 5542 m laid 7) 140mm 8 kg - 1953 m supplied and 1911 m laid 8) 160 mm 6 kg - 2928 m supplied and 2880 m laid 9) 160 mm 8 kg - 1050 m supplied 1014.50 m laid 10) 80 mm GI- 2580 m laid and 2067.30 m laid 11) 100 mm GI - 312 m supplied and 311.30 m laid 12) 125mm GI – 130 m supplied and 130 m laid 13) 150MM GI - 136.50 m supplied and 108.60 m laid 14) 450MM DI - 2189 m supplied and 2051.5 m laid 15) 200mm DI -1977.50 m supplied and 1977.50 m laid 16) 250mm DI -2915 m supplied and 2909.50 m laid 17) 400MM DI - 2833.00 m supplied and 2820.30 m laid 18) 350mm DI - 1772.5 m supplied and 1767 m 19) 300MM DI - 807 m supplied and 807 m laidKIIFB PHASE II PACKAGE II PART I 72% Completed work foreclosed -72% of work completed (1300 FHTC provided. Various dia of pvc pipes and GI pipes are supplied at site Total supply-120 km, Total laid- 100.500 km /out of 120km , ) balance work arranged in kiifb ,its tender procedure processingKIIFB PHASE II PACKAGE II PART II 16% Completed 200mm DI=297m,90/6kg=4493m,90/8kg=948m,110/8kg=150m,110/6kg=1174m,140/6 kg=540m,250mm DI=181.5m,350mm DI=2920.5m,160/6kg=120m Chittur Project Dn - AE 3
21 Jan 2026 KIIFB PACKAGE II PHASE I 92% CompletedTOTAL PIPE LAID 6.618km laid/8 km pipe. House connections- 3377 Nos provided/out of 6055, FHTC: 79 Nos. 1.) 90mm PVC 6 kg -3.110 km laid 2) 80mm GI pipe- 3.508 Km laidKIIFB PACKAGE II PHASE III 86% Completed Various dia of pvc pipes and GI pipes are supplied at site Total supply-123 km, Total pipe laid – 113.53 km /123 km 1.) 90 mm 6 kg 49350 m supplied and 40912.35 m laid 2.) 90 mm 8 kg-37386 m supplied and 36910.50 m laid 3.) 90mm 10 kg – 240 m supplied and 240 m laid 4) 110mm 6 kg – 4278 m supplied and 4278 m laid 5) 110mm 8kg - 5268 m supplied and 4896 m laid 6) 140mm 6kg - 5620 m supplied 5542 m laid 7) 140mm 8 kg - 1953 m supplied and 1911 m laid 8) 160 mm 6 kg - 2928 m supplied and 2880 m laid 9) 160 mm 8 kg - 1050 m supplied 1014.50 m laid 10) 80 mm GI- 2580 m laid and 2067.30 m laid 11) 100 mm GI - 312 m supplied and 311.30 m laid 12) 125mm GI – 130 m supplied and 130 m laid 13) 150MM GI - 136.50 m supplied and 108.60 m laid 14) 450MM DI - 2189 m supplied and 2051.5 m laid 15) 200mm DI -1977.50 m supplied and 1977.50 m laid 16) 250mm DI -2915 m supplied and 2909.50 m laid 17) 400MM DI - 2833.00 m supplied and 2820.30 m laid 18) 350mm DI - 1772.5 m supplied and 1767 m 19) 300MM DI - 807 m supplied and 807 m laidKIIFB PHASE II PACKAGE II PART I 72% Completed work foreclosed -72% of work completed (1300 FHTC provided. Various dia of pvc pipes and GI pipes are supplied at site Total supply-120 km, Total laid- 100.500 km /out of 120km , ) balance work arranged in kiifb ,its tender procedure processingKIIFB PHASE II PACKAGE II PART II 15% Completed 200mm DI=297m,90/6kg=4493m,90/8kg=948m,110/8kg=150m,110/6kg=1174m,140/6 kg=540m,250mm DI=181.5m,350mm DI=2920.5m Chittur Project Dn - AE 3