KIIFB -17-18 - Vandazhi, Kizhakkencherry, Vadakkencherry & Kannambra Comprehensive Fresh Water distribution project – Phase II in Palakkad District

Project KIIFB -17-18 - Vandazhi, Kizhakkencherry, Vadakkencherry & Kannambra Comprehensive Fresh Water distribution project – Phase II in Palakkad District
Project Code PKDKIIFB1118631
Type Main project
Funding Agency KIIFB
Category KIIFB
Type of scheme Water Supply
Scheme KIIFB
Description The project is designed to provide adequate drinking water to the entire population of all wards except the elevated places of Vandazhy, Kizhakkanchery, Vadakkanchery and Kannambra Panchayaths in Alathur and Tharur constituencies of Palakkad district.The proposed project includes the components for pumping treated water to the proposed OHSR at Ponkandam and gravity feeding from balancing reservoir at WTP plant site to the proposed OHSRs at Cheerakuzhy palam, Vadakkanchery and Kannambra and boosting pumping from Cheerakuzhy to existing OHSR at Kanichiparutha so as to meet the water demand of the benefitted panchayaths at the rate of 100 liters per capita per day in the design year 2050. The Executive Engineer, Project Division, Palakkad vide letter no KWA/WSP/PKD/D2-01/2014 (Mangalam) dated 17.07.2019 has informed the Superintending Engineer, PPD, Kozhikkode that the proposed tank site at PWD rest house not available. Sri K D Prasenan, Hon'ble MLA of Alathur constituency, directed for ensuring the water supply coverage to the people residing in the high level areas of the benefitted Panchayaths in the meeting held at the chamber of honorable minister Sri. A K. Balan. Hence new tank locations are identified which will ensure the water supply coverage of the high level and low level zones of all 4 Grama panchayaths and design was modified accordingly by PPD. Location of service reservoirs are finalized for design based on the joint inspection of PPD and Project Division, Palakkad.The original proposal of transmission of treated water to OHSRs through gravity changed to Pumping. Hence motor pumpsets introduced in the revised proposal for pumping of treated water to the OHSRs. Due to the rezoning of the entire benfitted area in to 8 zones, the locations and capacities of proposed OHSRs are changed. The locations and revised capacities of OHSRs are 22 LL at Karimkunnam for covering the low level zones of Vadakkenchery and Kannambra panchayaths, 16 LL OHSR at Kavalupara Nannagadi for high level zones of Vandazhy and Kizhakkenchery panchayaths, 10LL OHSR at Palakuzhy for high level zones of Vadakkenchery and Kannambra, 0.20 LL OHSR capacity at a level of +507.000m to cater the demand of Palakuzhy highly elevated areas. The change in the diameter of transmission mains, length, route etc occurred. For pumping clear water from the Palakuzhy OHSR at a level of +187.00m to the 0.20LL OHSR at +507.00m, and two online booster stations are proposed.
Status On-going
District Palakkad
Executing Office Chittur Project Dn
AS Amount (Rs) 695400000
AS Number WRD0025-20-PA-01 dated 19.11.2018
TS Amount (Rs) 685400000
TS Number
Total Bill Submitted (Rs) 268284628
Total Bill Paid (Rs) 268284628
Population Benefitted 45000
Capacity in MLD 24.50
Actual Project Completion Date 31 Dec 2025
Coverage Vandazhy, vadakkenchery, kizhakkenchery
Implementation Schedule Download
Work Plan Download

Packages

No. Project Name Location View
1 KIIFB – 2017-18 Vandazhi, Kizhakkenchery, Vadakkanchery and Kannambra Panchayaths in Palakkad District – phase II - package I - Design, construction,Commissioning and Maintenance of 22.00 LL OHSR at Karimkunnam in Vadakkanchery Panchayath, Supplying and Laying 350mm DI K9 CWPM from WTP to Karimkunnam OHSR, Supplying and Erection of ,CW motor pump sets including road restoration work Project Division Chittur
2 KIIFB 2017-2018--CWSS to Vandazhy,Kizhakkenchery,vadakkenchery and kannambra panchayaths in palakkad district-Phase-II-Package-2-part-II Project Division Chittur
3 KIIFB-2017-2018-CWSS TO Vandazhy,Kizhakkenchery,vadakkenchery and kannambra panchayaths in palakkad district-Phase-II-Package-III -Supplying and Laying distribution network in Low level zone of Vandazhy grama panchayath from 24.50 LL OHSR at Mangalam Dam WTP - Zone 1 Project Division Chittur
4 KIIFB-2017-2018-CWSS TO Vandazhy,Kizhakkenchery,vadakkenchery and kannambra panchayaths in palakkad district-Phase-II-Package-II-Part-I-Supplying laying testing commissioning and maintenance of distribution net work from 22 LL OHSR at Karimkunnam and Transmission main from OHSR up to Diana Hotel including NH 544 crossing for kannambra low level zone and road restoration Project Division Chittur

Overall Project Status

Status Date Overall Project Status Project Officer Contact
02 Jul 2026 KIIFB phase II – package I (Work in progress 92% ) Contractor Styopped works and filed case agaist KWA ,waiting for court order. Present Progress -OHSR primer coat work completed and compound wall work are also in progress and, 350mm DI work- 15.00KM PIPE supplied at site and 14.742km laid. GAP filling work is balance ,crossing bridge work not started.MS pipe for crossing is supplied KIIFB phase II – package III (Work in progress 86% ) Various dia of pvc pipes and GI pipes are supplied at site Total supply-123 km, Total pipe laid – 113.53 km /123 km 1.) 90 mm 6 kg 49350 m supplied and 40912.35 m laid 2.) 90 mm 8 kg-37386 m supplied and 36910.50 m laid 3.) 90mm 10 kg – 240 m supplied and 240 m laid 4) 110mm 6 kg – 4278 m supplied and 4278 m laid 5) 110mm 8kg - 5268 m supplied and 4896 m laid 6) 140mm 6kg - 5620 m supplied 5542 m laid 7) 140mm 8 kg - 1953 m supplied and 1911 m laid 8) 160 mm 6 kg - 2928 m supplied and 2880 m laid 9) 160 mm 8 kg - 1050 m supplied 1014.50 m laid 10) 80 mm GI- 2580 m laid and 2067.30 m laid 11) 100 mm GI - 312 m supplied and 311.30 m laid 12) 125mm GI – 130 m supplied and 130 m laid 13) 150MM GI - 136.50 m supplied and 108.60 m laid 14) 450MM DI - 2189 m supplied and 2051.5 m laid 15) 200mm DI -1977.50 m supplied and 1977.50 m laid 16) 250mm DI -2915 m supplied and 2909.50 m laid 17) 400MM DI - 2833.00 m supplied and 2820.30 m laid 18) 350mm DI - 1772.5 m supplied and 1767 m 19) 300MM DI - 807 m supplied and 807 m laid KIIFB phase II – package II-PART I (Work in progress 72% ) work foreclosed -72% of work completed (1300 FHTC provided. Various dia of pvc pipes and GI pipes are supplied at site Total supply-120 km, Total laid- 100.500 km /out of 120km , ) balance work arranged in kiifb ,its tender procedure processing KIIFB phase II – package II-PART II (Work in progress 16% ) 200mmDI=633.1m,90/6kg=8554m,90/8kg=2132m,110/8kg=430.2m,110/6kg=1180m,140/6 kg=666m,250mm DI=633.5m,350mm DI=2985.5m,160/6Kg=668m,80mm GI =657.4m,300mm DI=121m,100mm GI=39.7M Chittur Project Dn - AE 3
29 Jun 2026 KIIFB phase II – package I (Work in progress 92% ) Contractor Styopped works and filed case agaist KWA ,waiting for court order. Present Progress -OHSR primer coat work completed and compound wall work are also in progress and, 350mm DI work- 15.00KM PIPE supplied at site and 14.742km laid. GAP filling work is balance ,crossing bridge work not started.MS pipe for crossing is supplied KIIFB phase II – package III (Work in progress 86% ) Various dia of pvc pipes and GI pipes are supplied at site Total supply-123 km, Total pipe laid – 113.53 km /123 km 1.) 90 mm 6 kg 49350 m supplied and 40912.35 m laid 2.) 90 mm 8 kg-37386 m supplied and 36910.50 m laid 3.) 90mm 10 kg – 240 m supplied and 240 m laid 4) 110mm 6 kg – 4278 m supplied and 4278 m laid 5) 110mm 8kg - 5268 m supplied and 4896 m laid 6) 140mm 6kg - 5620 m supplied 5542 m laid 7) 140mm 8 kg - 1953 m supplied and 1911 m laid 8) 160 mm 6 kg - 2928 m supplied and 2880 m laid 9) 160 mm 8 kg - 1050 m supplied 1014.50 m laid 10) 80 mm GI- 2580 m laid and 2067.30 m laid 11) 100 mm GI - 312 m supplied and 311.30 m laid 12) 125mm GI – 130 m supplied and 130 m laid 13) 150MM GI - 136.50 m supplied and 108.60 m laid 14) 450MM DI - 2189 m supplied and 2051.5 m laid 15) 200mm DI -1977.50 m supplied and 1977.50 m laid 16) 250mm DI -2915 m supplied and 2909.50 m laid 17) 400MM DI - 2833.00 m supplied and 2820.30 m laid 18) 350mm DI - 1772.5 m supplied and 1767 m 19) 300MM DI - 807 m supplied and 807 m laid KIIFB phase II – package II-PART I (Work in progress 72% ) work foreclosed -72% of work completed (1300 FHTC provided. Various dia of pvc pipes and GI pipes are supplied at site Total supply-120 km, Total laid- 100.500 km /out of 120km , ) balance work arranged in kiifb ,its tender procedure processing KIIFB phase II – package II-PART II (Work in progress 16% ) 200mmDI=633.1m,90/6kg=8554m,90/8kg=2132m,110/8kg=430.2m,110/6kg=1180m,140/6 kg=666m,250mm DI=633.5m,350mm DI=2985.5m,160/6Kg=668m,80mm GI =657.4m,300mm DI=121m,100mm GI=39.7M Chittur Project Dn - AE 3
22 Jun 2026 KIIFB phase II – package I (Work in progress 92% ) Contractor Styopped works and filed case agaist KWA ,waiting for court order. Present Progress -OHSR primer coat work completed and compound wall work are also in progress and, 350mm DI work- 15.00KM PIPE supplied at site and 14.742km laid. GAP filling work is balance ,crossing bridge work not started.MS pipe for crossing is supplied KIIFB phase II – package III (Work in progress 86% ) Various dia of pvc pipes and GI pipes are supplied at site Total supply-123 km, Total pipe laid – 113.53 km /123 km 1.) 90 mm 6 kg 49350 m supplied and 40912.35 m laid 2.) 90 mm 8 kg-37386 m supplied and 36910.50 m laid 3.) 90mm 10 kg – 240 m supplied and 240 m laid 4) 110mm 6 kg – 4278 m supplied and 4278 m laid 5) 110mm 8kg - 5268 m supplied and 4896 m laid 6) 140mm 6kg - 5620 m supplied 5542 m laid 7) 140mm 8 kg - 1953 m supplied and 1911 m laid 8) 160 mm 6 kg - 2928 m supplied and 2880 m laid 9) 160 mm 8 kg - 1050 m supplied 1014.50 m laid 10) 80 mm GI- 2580 m laid and 2067.30 m laid 11) 100 mm GI - 312 m supplied and 311.30 m laid 12) 125mm GI – 130 m supplied and 130 m laid 13) 150MM GI - 136.50 m supplied and 108.60 m laid 14) 450MM DI - 2189 m supplied and 2051.5 m laid 15) 200mm DI -1977.50 m supplied and 1977.50 m laid 16) 250mm DI -2915 m supplied and 2909.50 m laid 17) 400MM DI - 2833.00 m supplied and 2820.30 m laid 18) 350mm DI - 1772.5 m supplied and 1767 m 19) 300MM DI - 807 m supplied and 807 m laid KIIFB phase II – package II-PART I (Work in progress 72% ) work foreclosed -72% of work completed (1300 FHTC provided. Various dia of pvc pipes and GI pipes are supplied at site Total supply-120 km, Total laid- 100.500 km /out of 120km , ) balance work arranged in kiifb ,its tender procedure processing KIIFB phase II – package II-PART II (Work in progress 16% ) 200mmDI=633.1m,90/6kg=8554m,90/8kg=2132m,110/8kg=430.2m,110/6kg=1180m,140/6 kg=666m,250mm DI=633.5m,350mm DI=2985.5m,160/6Kg=668m,80mm GI =657.4m,300mm DI=121m,100mm GI=39.7M Chittur Project Dn - AE 3
15 Jun 2026 KIIFB phase II – package I (Work in progress 92% ) Contractor Styopped works and filed case agaist KWA ,waiting for court order. Present Progress -OHSR primer coat work completed and compound wall work are also in progress and, 350mm DI work- 15.00KM PIPE supplied at site and 14.742km laid. GAP filling work is balance ,crossing bridge work not started.MS pipe for crossing is supplied KIIFB phase II – package III (Work in progress 86% ) Various dia of pvc pipes and GI pipes are supplied at site Total supply-123 km, Total pipe laid – 113.53 km /123 km 1.) 90 mm 6 kg 49350 m supplied and 40912.35 m laid 2.) 90 mm 8 kg-37386 m supplied and 36910.50 m laid 3.) 90mm 10 kg – 240 m supplied and 240 m laid 4) 110mm 6 kg – 4278 m supplied and 4278 m laid 5) 110mm 8kg - 5268 m supplied and 4896 m laid 6) 140mm 6kg - 5620 m supplied 5542 m laid 7) 140mm 8 kg - 1953 m supplied and 1911 m laid 8) 160 mm 6 kg - 2928 m supplied and 2880 m laid 9) 160 mm 8 kg - 1050 m supplied 1014.50 m laid 10) 80 mm GI- 2580 m laid and 2067.30 m laid 11) 100 mm GI - 312 m supplied and 311.30 m laid 12) 125mm GI – 130 m supplied and 130 m laid 13) 150MM GI - 136.50 m supplied and 108.60 m laid 14) 450MM DI - 2189 m supplied and 2051.5 m laid 15) 200mm DI -1977.50 m supplied and 1977.50 m laid 16) 250mm DI -2915 m supplied and 2909.50 m laid 17) 400MM DI - 2833.00 m supplied and 2820.30 m laid 18) 350mm DI - 1772.5 m supplied and 1767 m 19) 300MM DI - 807 m supplied and 807 m laid KIIFB phase II – package II-PART I (Work in progress 72% ) work foreclosed -72% of work completed (1300 FHTC provided. Various dia of pvc pipes and GI pipes are supplied at site Total supply-120 km, Total laid- 100.500 km /out of 120km , ) balance work arranged in kiifb ,its tender procedure processing KIIFB phase II – package II-PART II (Work in progress 16% ) 200mmDI=633.1m,90/6kg=8554m,90/8kg=2132m,110/8kg=430.2m,110/6kg=1180m,140/6 kg=666m,250mm DI=633.5m,350mm DI=2985.5m,160/6Kg=668m,80mm GI =657.4m,300mm DI=121m,100mm GI=39.7M Chittur Project Dn - AE 3
12 Jun 2026 KIIFB phase II – package I (Work in progress 92% ) Contractor Styopped works and filed case agaist KWA ,waiting for court order. Present Progress -OHSR primer coat work completed and compound wall work are also in progress and, 350mm DI work- 15.00KM PIPE supplied at site and 14.742km laid. GAP filling work is balance ,crossing bridge work not started.MS pipe for crossing is supplied KIIFB phase II – package III (Work in progress 86% ) Various dia of pvc pipes and GI pipes are supplied at site Total supply-123 km, Total pipe laid – 113.53 km /123 km 1.) 90 mm 6 kg 49350 m supplied and 40912.35 m laid 2.) 90 mm 8 kg-37386 m supplied and 36910.50 m laid 3.) 90mm 10 kg – 240 m supplied and 240 m laid 4) 110mm 6 kg – 4278 m supplied and 4278 m laid 5) 110mm 8kg - 5268 m supplied and 4896 m laid 6) 140mm 6kg - 5620 m supplied 5542 m laid 7) 140mm 8 kg - 1953 m supplied and 1911 m laid 8) 160 mm 6 kg - 2928 m supplied and 2880 m laid 9) 160 mm 8 kg - 1050 m supplied 1014.50 m laid 10) 80 mm GI- 2580 m laid and 2067.30 m laid 11) 100 mm GI - 312 m supplied and 311.30 m laid 12) 125mm GI – 130 m supplied and 130 m laid 13) 150MM GI - 136.50 m supplied and 108.60 m laid 14) 450MM DI - 2189 m supplied and 2051.5 m laid 15) 200mm DI -1977.50 m supplied and 1977.50 m laid 16) 250mm DI -2915 m supplied and 2909.50 m laid 17) 400MM DI - 2833.00 m supplied and 2820.30 m laid 18) 350mm DI - 1772.5 m supplied and 1767 m 19) 300MM DI - 807 m supplied and 807 m laid KIIFB phase II – package II-PART I (Work in progress 72% ) work foreclosed -72% of work completed (1300 FHTC provided. Various dia of pvc pipes and GI pipes are supplied at site Total supply-120 km, Total laid- 100.500 km /out of 120km , ) balance work arranged in kiifb ,its tender procedure processing KIIFB phase II – package II-PART II (Work in progress 16% ) 200mmDI=633.1m,90/6kg=8554m,90/8kg=2132m,110/8kg=430.2m,110/6kg=1180m,140/6 kg=666m,250mm DI=633.5m,350mm DI=2985.5m,160/6Kg=668m,80mm GI =657.4m,300mm DI=121m,100mm GI=39.7M Chittur Project Dn - AE 3

Project Review

See All Review messages
Review Date Review Message Review Attended By
23 Dec 2021 HDD along NH at Wadakkanchery area. NHAI will not permit excavation along the service road and is insisting HDD for nearly 7km. There are many branches on either side and so pipes will have to be laid on both sides. Acquisition of land on either side is an option, but the NHAI has plans for widening plans on the anvil, which is not finalized. EE is directed to prepare estimate for HDD Baby George, EE, A S Raju, AEE

Duration & Sanction dates

Date of start of Project 13/03/2020
Scheduled date of Completion of the Project 27 May 2022
Expected date of Completion 31/12/2024

Processing Dates

AS Date 19 Nov 2018
TS Date 13 Dec 2019

Other details

Project Officers View