Jal Jeevan Mission- Kannur District- Eramam Kuttur Grama Panchayath-WSS to Eramam Kuttur Panchayath-Phase II-Construction of Intake well cum pump house,4.00MLD WTP,4.50m high RCC Weir, Supply and erection of pumpsets, Construction of service reservoirs and laying pumping main, transmission main ,distribution system and providing FHTCs

Project Jal Jeevan Mission- Kannur District- Eramam Kuttur Grama Panchayath-WSS to Eramam Kuttur Panchayath-Phase II-Construction of Intake well cum pump house,4.00MLD WTP,4.50m high RCC Weir, Supply and erection of pumpsets, Construction of service reservoirs and laying pumping main, transmission main ,distribution system and providing FHTCs
Project Code KNRJJM09219458
Type Main project
Funding Agency JJM
Category JJM
Type of scheme Water Supply
Scheme 4215-01-102-92-02
Description In this project it is proposed to provide 6543 Nos FHTCs in Eramam- Kuttur Panchayath by implementing the multi village scheme WSS to Eramam- Kuttur Panchayath. The work of the above scheme includes the components such as RCC weir, Intake well, Raw water pumping mains, WTP, Clear water pumping mains, Storage reservoirs and the distribution network.
Status On-going
District Kannur
Executing Office Kannur Project Dn
AS Amount (Rs) 748000000
AS Number G.O(Rt) No.489/2021/WRD
TS Amount (Rs) 745000000
TS Number TS/2021-2022/2020/12610
Total Bill Submitted (Rs) 321022587
Total Bill Paid (Rs) 321022587
Population Benefitted 27830
Capacity in MLD 4.00
Actual Project Completion Date Date is not specified
Coverage Eramam, Kuttur and Vellora in Eramam-Kuttur Panchayath
Implementation Schedule Download
Work Plan Download

Packages

No. Project Name Location View
1 Jal Jeevan Mission- Kannur District- Eramam Kuttur Grama Panchayath-WSS to Eramam Kuttur Panchayath-Phase II-Construction of production components - Construction of Intake well cum pump house,4.00MLD WTP,4.50m high RCC Weir, Supply and erection of pumpsets and laying pumping main Payyannur Project Sn

Overall Project Status

Status Date Overall Project Status Project Officer Contact
24 Jun 2024 Construction of Intake Well Cum Pump house at Thumbathadam : 8 m dia intake well construction work is in progress. RCC work of well steining, leading channel, floor slab etc are completed. Roof slab concreting of pump house completed. Plastering works of pump house is completed. Windows, ventilators, rolling shutters etc are fitted. Painting works completed. Electrical works in progress. 2. Raw Water and Clear Water Pumping Mains and transmission mains: All the required pipes as per NIT is supplied by the contractor. Total 20.80 km pipe laid out of 21.20 km. 3. Construction of 1.75LL GLSR cum Booster pump house at Kuttur – GLSR side wall and roof slab concreting work completed. Construction of Booster pump house is completed. Plastering and painting works also completed. Compound wall construction work completed. 4. Construction of 4.00 MLD Water Treatment Plant at Kannadipoyil : 95% of the work is completed. Finishing work of WTP building is in progress. Filter media work in progress. 5. Construction of 6.50 LL capacity OHSR at Water Treatment Plant at Kannadipoyil for Zone-I : OHSR works in finishing stage. 6.Construction of 4.50 LL capacity OHSR at Vellora and 0.50 L.L Break pressure tank at Perumbadavu for Zone-II : Construction work is completed. Finishing works also completed. 7. Supplying and Laying Distribution Network for Zone-I & Zone-II : All the required pipes as per NIT is supplied by the contractor. Total 199 km pipe laid out of 206 km. HTC work is also in progress. Total 4300 HTC provided out of 6543. 8. Supply Erection of Raw water and Clear water pump sets at Intake Well, Booster and WTP Pump houses is completed. Construction of 4.50m RCC weir at Thumbathadam is not started Payyannur UIDSSMT AE 3
21 Jun 2024 Construction of Intake Well Cum Pump house at Thumbathadam : 8 m dia intake well construction work is in progress. RCC work of well steining, leading channel, floor slab etc are completed. Roof slab concreting of pump house completed. Plastering works of pump house is completed. Windows, ventilators, rolling shutters etc are fitted. Painting works completed. Electrical works in progress. 2. Raw Water and Clear Water Pumping Mains and transmission mains: All the required pipes as per NIT is supplied by the contractor. Total 20.80 km pipe laid out of 21.20 km. 3. Construction of 1.75LL GLSR cum Booster pump house at Kuttur – GLSR side wall and roof slab concreting work completed. Construction of Booster pump house is completed. Plastering and painting works also completed. Compound wall construction work completed. 4. Construction of 4.00 MLD Water Treatment Plant at Kannadipoyil : 95% of the work is completed. Finishing work of WTP building is in progress. Filter media work in progress. 5. Construction of 6.50 LL capacity OHSR at Water Treatment Plant at Kannadipoyil for Zone-I : OHSR works in finishing stage. 6.Construction of 4.50 LL capacity OHSR at Vellora and 0.50 L.L Break pressure tank at Perumbadavu for Zone-II : Construction work is completed. Finishing works also completed. 7. Supplying and Laying Distribution Network for Zone-I & Zone-II : All the required pipes as per NIT is supplied by the contractor. Total 199 km pipe laid out of 206 km. HTC work is also in progress. Total 4300 HTC provided out of 6543. 8. Supply Erection of Raw water and Clear water pump sets at Intake Well, Booster and WTP Pump houses is completed. Construction of 4.50m RCC weir at Thumbathadam is not started Payyannur UIDSSMT AE 3
18 Jun 2024 Construction of Intake Well Cum Pump house at Thumbathadam : 8 m dia intake well construction work is in progress. RCC work of well steining, leading channel, floor slab etc are completed. Roof slab concreting of pump house completed. Plastering works of pump house is completed. Windows, ventilators, rolling shutters etc are fitted. Painting works completed. Electrical works in progress. 2. Raw Water and Clear Water Pumping Mains and transmission mains: All the required pipes as per NIT is supplied by the contractor. Total 20.80 km pipe laid out of 21.20 km. 3. Construction of 1.75LL GLSR cum Booster pump house at Kuttur – GLSR side wall and roof slab concreting work completed. Construction of Booster pump house is completed. Plastering and painting works also completed. Compound wall construction work completed. 4. Construction of 4.00 MLD Water Treatment Plant at Kannadipoyil : 95% of the work is completed. Finishing work of WTP building is in progress. Filter media work in progress. 5. Construction of 6.50 LL capacity OHSR at Water Treatment Plant at Kannadipoyil for Zone-I : OHSR works in finishing stage. 6.Construction of 4.50 LL capacity OHSR at Vellora and 0.50 L.L Break pressure tank at Perumbadavu for Zone-II : Construction work is completed. Finishing works also completed. 7. Supplying and Laying Distribution Network for Zone-I & Zone-II : All the required pipes as per NIT is supplied by the contractor. Total 199 km pipe laid out of 206 km. HTC work is also in progress. Total 4300 HTC provided out of 6543. 8. Supply Erection of Raw water and Clear water pump sets at Intake Well, Booster and WTP Pump houses is completed. Construction of 4.50m RCC weir at Thumbathadam is not started Payyannur UIDSSMT AE 3
18 Jun 2024 Jal Jeevan Mission- Kannur District- Eramam Kuttur Grama Panchayath-WSS to Eramam Kuttur Panchayath-Phase II-Construction of production components - Construction of Intake well cum pump house,4.00MLD WTP,4.50m high RCC Weir, Supply and erection of pumpsets and laying pumping main Payyannur UIDSSMT AE 3
15 Jun 2024 Construction of Intake Well Cum Pump house at Thumbathadam : 8 m dia intake well construction work is in progress. RCC work of well steining, leading channel, floor slab etc are completed. Roof slab concreting of pump house completed. Plastering works of pump house is completed. Windows, ventilators, rolling shutters etc are fitted. Painting works completed. Electrical works in progress. 2. Raw Water and Clear Water Pumping Mains and transmission mains: All the required pipes as per NIT is supplied by the contractor. Total 20.80 km pipe laid out of 21.20 km. 3. Construction of 1.75LL GLSR cum Booster pump house at Kuttur – GLSR side wall and roof slab concreting work completed. Construction of Booster pump house is completed. Plastering and painting works also completed. Compound wall construction work completed. 4. Construction of 4.00 MLD Water Treatment Plant at Kannadipoyil : 95% of the work is completed. Finishing work of WTP building is in progress. Filter media work in progress. 5. Construction of 6.50 LL capacity OHSR at Water Treatment Plant at Kannadipoyil for Zone-I : OHSR works in finishing stage. 6.Construction of 4.50 LL capacity OHSR at Vellora and 0.50 L.L Break pressure tank at Perumbadavu for Zone-II : Construction work is completed. Finishing works also completed. 7. Supplying and Laying Distribution Network for Zone-I & Zone-II : All the required pipes as per NIT is supplied by the contractor. Total 199 km pipe laid out of 206 km. HTC work is also in progress. Total 4300 HTC provided out of 6543. 8. Supply Erection of Raw water and Clear water pump sets at Intake Well, Booster and WTP Pump houses is completed. Construction of 4.50m RCC weir at Thumbathadam is not started Payyannur UIDSSMT AE 3

No project review have been added to this project

Duration & Sanction dates

Date of start of Project 15/07/2022
Scheduled date of Completion of the Project 07 Jan 2024
Expected date of Completion 07/01/2024

Processing Dates

AS Date 18 Sep 2021
TS Date 19 Jan 2022