MInutes of the meeting ....stp Kureepuzha. 19-11-2024

21/11/2024 | File: STP mom nov 19-11-2024.pdf | Download

PROCEEDINGS OF THE SUPERINTENDING ENGINEER, P.H.CIRCLE, KWA

25/10/2024 | File: PROCEEDINGS OF THE SUPERINTENDING ENGINEER, P.H.CIRCLE, KWA.pdf | Download

MInutes of the meeting ....stp Kureepuzha. V C. 25-09-2024

25/10/2024 | File: Minutes12MLD STP at Kureeppuzha 25-09-2024 VC_compressed.pdf | Download

MInutes of the meeting ....stp Kureepuzha.

15/10/2024 | File: minutes of the meeting stp_compressed.pdf | Download

Pending works at STP site letter to ABM...01-03-2024

02/03/2024 | File: pending works at the STP site 01 Mar 2024.pdf | Download

Letter to ABM & Hydrotech- requesting higher level intervention- reg- 12.1.2024

18/01/2024 | File: letter to abm&hydrotech- 10.1.2024.pdf | Download

letter tp Secretary, Kollam Corporation- commissioning-reg on 22-12-23

18/01/2024 | File: lettr to secretary, kollam corporation -22.12.23 (1).pdf | Download

letter to CE (PPD&WASCON), CE(SR), CE(P&O), Mission director,AMRUT- Higher level intervention reg on 29.12.23

18/01/2024 | File: letter to CE(PPD&WASCON) 12MLD STP at Kureepuzha-29.12.23.pdf | Download

Minutes of the meeting held in the chamber of the Hon’ble Mayor Kollam corporation with Managing Director , KWA on 24/08/2023.

30/11/2023 | File: Minutes of the meeting held in the chamber of the Hon.docx | Download

Minutes of the meeting held in the chamber of the Hon’ble Mayor Kollam corporation with Managing Director , KWA on 24/08/2023.

STP MoM of the meeting dated 30.10.2023

30/11/2023 | File: minutes stp octo -30.10.2023.pdf | Download

STP MoM of the meeting dated 30.10.2023

STP MoM of the meeting dated 06.10.2023

30/11/2023 | File: STP MoM approved dated 6.10.23.pdf | Download

STP MoM of the meeting dated 06.10.2023

12 MLD STP at Kureepuzha - commissioning using septage- requesting directions

16/09/2023 | File: Adobe Scan 16 Sept 2023 (2).pdf | Download

12 MLD STP at Kureepuzha - tube well test and handing over construction- Request for yield static head details

14/08/2023 | File: GWD 14-08-2023.pdf | Download

12 MLD STP Intervention from higher level-letter to SE

12/07/2023 | File: stp kureepuzha time extension request reg.intervention from higher level.docx | Download

: AMRUT- Kollam Muncipal- Construction of 12 MLD Sewage Treatment Plant for zone A1 of Kollam Corporation at Kureepuzha- Intervention at higher level- requesting – reg

12 MLD KWA Kollam Approval

08/06/2023 | File: 12 MLD KWA KOLLAM Approval.pdf | Download

Minutes of the review meeting of Sewerage Wing convened by the Managing Director,KWA on 23/05/2023 at 10.00 AM.

29/05/2023 | File: 4232-AEE_II_(WASCON)-2021-KWA (40).pdf | Download

letter to contractor - to achieving progress

10/08/2022 | File: 08-08-2022(letter to contractor - to achieving progress).jpg | Download

Structure detail of a Sludge Thickener

16/02/2022 | File: | Download

Plan Elevation & Section detail of Air Blower Room

16/02/2022 | File: | Download

Structure Detail of Air Blower

16/02/2022 | File: | Download

TS

26/11/2020 | File: TS.pdf | Download

ORDER No. TS/2018-2019/2018/9433 Dated: 13-09-2018

AS

26/11/2020 | File: AS.pdf | Download

G.O.(Rt)No.LSGD 516/2018/LSGD Dated:22-02-2018 for Rs. 300000000