Projects

  
Search ongoing projects Example: ‘project code’ or ’project name’ or ’location’

Documents & Files

LOA

25/06/2024 | File: fhtc - LOA.pdf | Download

Disaster management

25/06/2024 | File: k o jose.pdf | Download

Disaster management- Pre-Monsoon Activities-Urgent action required for refilling the pipeline trenches excavated during construction works for pipeline laying under Jal Jeevan Mission.

letter to contractor

25/06/2024 | File: LETTER TO K O JOSE.pdf | Download

for the purpose of road restoration

TS SLIP

25/06/2024 | File: package 2 ts.pdf | Download

TS SLIP

AS SLIP

25/06/2024 | File: package 2 as.pdf | Download

AS SLIP

letter to PWD AE

22/05/2024 | File: LETTER TO PWD AE.pdf | Download

letter to contractor

21/04/2023 | File: 315-AEE-2023-Pr.D-KTPA-MTPZA.pdf | Download

letter regarding status of work at erattayar

pipe testing

23/03/2023 | File: Kundan pipes testing PDI 4_compressed (1).pdf | Download

MEMO OF WORK

23/03/2023 | File: Memo of Work (1).xlsx | Download

AGREED BoQ

23/03/2023 | File: Agreed BoQ.pdf | Download

Jal Jeevan Mission (JJM)-JJM PROVIDING FHTCS TO ALL HOUSEHOLD IN ERATTAYAR AND KAMAKSHI (PART) PANCHAYATHS IN IDUKKI DISTRICTSProviding and Laying Distribution Network and FHTC for various zones-Pipeline Work

Power of Attorney

23/03/2023 | File: POA.pdf | Download

Jal Jeevan Mission (JJM)-JJM PROVIDING FHTCS TO ALL HOUSEHOLD IN ERATTAYAR AND KAMAKSHI (PART) PANCHAYATHS IN IDUKKI DISTRICTSProviding and Laying Distribution network and FHTCs for various zones- Pipeline Work-- Power of Attorney

POWER OF ATTORNEY

23/03/2023 | File: power__OF_ATTORNEY_KO_JOSE.pdf | Download

AGREEMENT

23/03/2023 | File: Agreement.pdf | Download

Letter to Erattayar Grama panchayt 14/03/2023

21/03/2023 | File: information - letter Erattayar.pdf | Download

Letter to Erattayar Grama panchayt on 14/03/2023 to inform the work has been started

Short Report of Erattayar distribution Scheme

21/03/2023 | File: Microsoft Word - short report erattayar (1).pdf | Download

Short report of Erattayar distribution scheme

Report of Erattayar Distribution Scheme

21/03/2023 | File: REPORT final.pdf | Download

Report Presented on 11/03/2023 at the time of scheme inaguration

Inaguration notice for Erattayar Grama panchayat -Distribution scheme

21/03/2023 | File: Adobe Scan 08-Mar-2023 (2)_compressed.pdf | Download

Inaguration notice for Erattayar Grama panchayat -Distribution scheme

DISTRIBUTION LINE MAPS

15/12/2022 | File: Distribution map.pdf | Download

DISTRIBUTION LINE MAPS OF WATER TREATMENT PLANT,NANGUTHOTTY TANK,VAZHAVARA TANK ,KURISUMOTTILPADI,ADAYALAKKALLU,THENNALI CITY,HEROPADI

PWD ROAD INSPECTION

15/12/2022 | File: PWD ROADS INSPECTED-1-2.pdf | Download

PWD JOINT INSPECTION WITH NEDUMKANDAM SECTION

PWD ROAD INSPECTION

15/12/2022 | File: PWD ROADS INSPECTED-1-2.pdf | Download

PWD JOINT INSPECTION WITH NEDUMKANDAM SECTION

PWD ROAD INSPECTION

15/12/2022 | File: PWD ROADS INSPECTED-1-2.pdf | Download

PWD JOINT INSPECTION WITH NEDUMKANDAM SECTION

PWD ROAD INSPECTION

15/12/2022 | File: PWD ROADS INSPECTED-1-2.pdf | Download

PWD JOINT INSPECTION WITH NEDUMKANDAM SECTION

PWD ROAD INSPECTION

15/12/2022 | File: PWD ROADS INSPECTED-1-2.pdf | Download

PWD JOINT INSPECTION WITH NEDUMKANDAM SECTION

PWD ROAD INSPECTION

15/12/2022 | File: PWD ROADS INSPECTED- KATTAPPANA SECTION.pdf | Download

PWD ROADS - JOINT INSPECTION WITH KATTAPPANA PWD SECTION