| Perlasserry Sn 1 |
| Date: 22/10/2024 |
Work has started | 0% Completed
dropped
| Perlassery Sn 2 AE |
| Date: 19/10/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 15/10/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 08/10/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 04/10/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 30/09/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 23/09/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 18/09/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 09/09/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 04/09/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted
| Perlassery Sn 2 AE |
| Date: 30/08/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 21/08/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 13/08/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted
| Perlassery Sn 2 AE |
| Date: 09/08/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted
| Perlassery Sn 2 AE |
| Date: 05/08/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted
| Perlassery Sn 2 AE |
| Date: 01/08/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 27/07/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 22/07/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 12/07/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 08/07/2024 |
Work has started | 0% Completed
Not Started
| Perlassery Sn 2 AE |
| Date: 25/06/2024 |
Work has started | 0% Completed
Not Started
| Perlassery Sn 2 AE |
| Date: 20/06/2024 |
Work has started | 0% Completed
Not Started
| Perlassery Sn 2 AE |
| Date: 10/06/2024 |
Work has started | 0% Completed
Not Started
| Perlassery Sn 2 AE |
| Date: 01/06/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 22/05/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 17/05/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 10/05/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Kannur PH Dn EE |
| Date: 03/05/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Kannur PH Dn EE |
| Date: 25/04/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 18/04/2024 |
Work in progress | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Kannur PH Dn EE |
| Date: 15/04/2024 |
Work in progress | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Kannur PH Dn EE |
| Date: 05/04/2024 |
Work in progress | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 27/03/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Kannur PH Dn EE |
| Date: 26/03/2024 |
Work in progress | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 18/03/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 11/03/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 28/02/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Kannur PH Dn EE |
| Date: 22/02/2024 |
Work in progress | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 14/02/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Perlassery Sn 2 AE |
| Date: 07/02/2024 |
Work has started | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Kannur PH Dn EE |
| Date: 29/01/2024 |
Work in progress | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Kannur PH Dn EE |
| Date: 20/01/2024 |
Work in progress | 0% Completed
No response received, tender cancelled. Estimate to be re casted.
| Kannur PH Dn EE |
| Date: 10/01/2024 |
Work in progress | 0% Completed
Re-tendered with due date 16.01.2024
| Kannur PH Dn EE |
| Date: 30/12/2023 |
Work in progress | 0% Completed
Tender cancelled & to be re-tendered.
| Perlassery Sn 2 AE |
| Date: 20/12/2023 |
Work has started | 0% Completed
Received high quoted rates, to be re-tendered.
| Kannur PH Dn EE |
| Date: 16/12/2023 |
Work in progress | 0% Completed
Received high quoted rates, to be re-tendered.
| Perlassery Sn 2 AE |
| Date: 07/12/2023 |
Work has started | 0% Completed
Received high quoted rates. Negotiating with contractor.
| Perlassery Sn 2 AE |
| Date: 25/11/2023 |
Work has started | 0% Completed
Received high quoted rates. Negotiating with contractor.
| Kannur PH Dn EE |
| Date: 18/11/2023 |
Work in progress | 0% Completed
Received high quoted rates. Negotiating with contractor.
| Perlassery Sn 2 AE |
| Date: 09/11/2023 |
Work has started | 0% Completed
Received high quoted rates. Negotiating with contractor.
| Perlassery Sn 2 AE |
| Date: 01/11/2023 |
Work has started | 0% Completed
Received high quoted rates. Negotiating with contractor.
| Kannur PH Dn EE |
| Date: 27/10/2023 |
Work in progress | 0% Completed
Received high quoted rates. Negotiating with contractor.
| Kannur PH Dn EE |
| Date: 19/10/2023 |
Work in progress | 0% Completed
Tender under scrutiny.
| Kannur PH Dn EE |
| Date: 11/10/2023 |
Work in progress | 0% Completed
Tender under scrutiny.
| Perlassery Sn 2 AE |
| Date: 03/10/2023 |
Work has started | 0% Completed
Tender under scrutiny.
| Perlassery Sn 2 AE |
| Date: 27/09/2023 |
Work has started | 0% Completed
Tender under scrutiny.
| Perlassery Sn 2 AE |
| Date: 20/09/2023 |
Work has started | 0% Completed
Tender under scrutiny.
| Perlassery Sn 2 AE |
| Date: 13/09/2023 |
Work has started | 0% Completed
Tender under scrutiny.
| Kannur PH Dn EE |
| Date: 01/09/2023 |
Work in progress | 0% Completed
Tender under scrutiny.
| Perlassery Sn 2 AE |
| Date: 24/08/2023 |
Work has started | 0% Completed
Tender under scrutiny.
| Kannur PH Dn EE |
| Date: 22/08/2023 |
Work in progress | 0% Completed
Tender under scrutiny.
| Kannur PH Dn EE |
| Date: 14/08/2023 |
Work in progress | 0% Completed
Tender under scrutiny.
| Perlassery Sn 2 AE |
| Date: 04/08/2023 |
Work has started | 0% Completed
WORK RETENDERED WITH DUE DATE 24.07.2023
| Perlassery Sn 2 AE |
| Date: 31/07/2023 |
Work has started | 0% Completed
WORK RETENDERED WITH DUE DATE 24.07.2023
| Perlassery Sn 2 AE |
| Date: 27/07/2023 |
Work has started | 0% Completed
WORK RE TENDERED WITH DUE DATE 24.07.2023
| Kannur PH Dn EE |
| Date: 19/07/2023 |
Work has started | 0% Completed
WORK RETENDERED WITH DUE DATE 24.07.2023
| Perlassery Sn 2 AE |
| Date: 14/07/2023 |
Work has started | 0% Completed
To be re tendered
| Perlasserry Sn 1 |
| Date: 10/07/2023 |
Work in progress | 0% Completed
To be re tendered
| Perlassery Sn 2 AE |
| Date: 04/07/2023 |
Work has started | 0% Completed
To be retendered
| Perlassery Sn 2 AE |
| Date: 30/06/2023 |
Work in progress | 0% Completed
To be re tendered
| Perlassery Sn 2 AE |
| Date: 24/06/2023 |
Work has started | 0% Completed
To be retendered
| Perlassery Sn 2 AE |
| Date: 19/06/2023 |
Work has started | 0% Completed
To be retendered
| Perlassery Sn 2 AE |
| Date: 16/06/2023 |
Work has started | 0% Completed
To be retendered
| Perlassery Sn 2 AE |
| Date: 13/06/2023 |
Work has started | 0% Completed
To be retendered
| Perlassery Sn 2 AE |
| Date: 09/06/2023 |
Work in progress | 0% Completed
To be retendered
| Perlassery Sn 2 AE |
| Date: 01/06/2023 |
Work in progress | 0% Completed
NO RESPONSE IN THE RE-TENDER. DUE DATE EXTENDED UP TO 29.05.2023
| Kannur PH Dn EE |
| Date: 23/05/2023 |
Work has started | 0% Completed
NO RESPONSE IN THE RE-TENDER. DUE DATE EXTENDED UP TO 29.05.2023
| Perlassery Sn 2 AE |
| Date: 18/05/2023 |
Work has started | 0% Completed
NO RESPONSE IN THE RE-TENDER. DUE DATE EXTENDED UP TO 22.05.2023
| Kannur PH Dn EE |
| Date: 12/05/2023 |
Work has started | 0% Completed
NO RESPONSE IN THE RE-TENDER. DUE DATE EXTENDED UP TO 22.05.2023
| Perlassery Sn 2 AE |
| Date: 10/05/2023 |
Work has started | 0% Completed
NO RESPONSE IN THE RE-TENDER. DUE DATE EXTENDED UP TO 08.05.2023
| Perlassery Sn 2 AE |
| Date: 02/05/2023 |
Work has started | 0% Completed
NO RESPONSE IN THE RE-TENDER. DUE DATE EXTENDED UP TO 08.05.2023
| Kannur PH Dn EE |
| Date: 26/04/2023 |
Work has started | 0% Completed
NO RESPONSE IN THE RE-TENDER. DUE DATE EXTENDED UPTO 08.05.2023
| Kannur PH Dn EE |
| Date: 19/04/2023 |
Work has started | 0% Completed
NO RESPONSE IN THE RE-TENDER. DUE DATE EXTENDED UPTO 24.04.2023
| Perlassery Sn 2 AE |
| Date: 13/04/2023 |
Work has started | 0% Completed
NO RESPONSE IN THE RE-TENDER. DUE DATE EXTENDED UPTO 17.04.2023
| Perlassery Sn 2 AE |
| Date: 09/04/2023 |
Work has started | 0% Completed
NO RESPONSE IN THE RE-TENDER. DUE DATE EXTENDED UPTO 17.04.2023
| Kannur PH Dn EE |
| Date: 06/04/2023 |
Work has started | 0% Completed
NO RESPONSE IN THE RE-TENDER. DUE DATE EXTENDED UPTO 17.04.2023
| Perlassery Sn 2 AE |
| Date: 29/03/2023 |
Work has started | 0% Completed
NO RESPONSE IN THE RE-TENDER. DUE DATE EXTENDED UPTO 28.03.2023
| Kannur PH Dn EE |
| Date: 27/03/2023 |
Work has started | 0% Completed
NO RESPONSE IN THE RE-TENDER. DUE DATE EXTENDED UPTO 28.03.2023
| Perlassery Sn 2 AE |
| Date: 22/03/2023 |
Work has started | 0% Completed
NO RESPONSE IN THE RE-TENDER. DUE DATE EXTENDED UPTO 21.03.2023
| Perlassery Sn 2 AE |
| Date: 18/03/2023 |
Work in progress | 0% Completed
NO RESPONSE IN THE RE-TENDER. DUE DATE EXTENDED UPTO 21.03.2023
| Kannur PH Dn EE |
| Date: 15/03/2023 |
Work has started | 0% Completed
NO RESPONSE IN THE RE-TENDER. DUE DATE EXTENDED UPTO 21.03.2023
| Perlassery Sn 2 AE |
| Date: 14/03/2023 |
Work has started | 0% Completed
RE-TENDERED-TENDER DUE DATE 14.03.2023
| Perlassery Sn 2 AE |
| Date: 09/03/2023 |
Work has started | 0% Completed
RE-TENDERED-TENDER DUE DATE 14.03.2023
| Kannur PH Dn EE |
| Date: 04/03/2023 |
Work has started | 0% Completed
RE-TENDERED-TENDER DUE DATE 14.03.2023
| Perlassery Sn 2 AE |
| Date: 27/02/2023 |
Work has started | 0% Completed
Work Tendered.But No Response.To be Re tendered
| Perlassery Sn 2 AE |
| Date: 21/02/2023 |
Work has started | 0% Completed
Work Tendered.But No Response.To be Re tendered
| Perlassery Sn 2 AE |
| Date: 17/02/2023 |
Work has started | 0% Completed
Work Tendered.But No Response.To be Retendered
| Perlassery Sn 2 AE |
| Date: 10/02/2023 |
Work has started | 0% Completed
Work Tendered.But No Response.To be Retendered
| Perlassery Sn 2 AE |
| Date: 29/01/2023 |
Work has started | 0% Completed
Work Tendered.But No Response.To be Retendered
| Perlassery Sn 2 AE |
| Date: 19/01/2023 |
Work has started | 0% Completed
Work Tendered.But No Response.To be Retendered
| Perlassery Sn 2 AE |
| Date: 07/01/2023 |
Work in progress | 0% Completed
Work Tendered.But No Response.To be Retendered
| Perlassery Sn 2 AE |
| Date: 04/01/2023 |
Work has started | 0% Completed
Work Tendered.But No Response.To be Retendered
| Perlassery Sn 2 AE |
| Date: 30/12/2022 |
Work has started | 0% Completed
Work Tendered.But No Response .To be Re tendered
| Perlassery Sn 2 AE |
| Date: 26/12/2022 |
Work has started | 0% Completed
Work Tendered.But No Response .To be Re tendered
| Perlassery Sn 2 AE |
| Date: 21/12/2022 |
Work has started | 0% Completed
Work Tendered.But No Response .To be Retendered
| Kannur PH Dn EE |
| Date: 13/12/2022 |
Work has started | 0% Completed
Work Tendered.But No Response .To be Retendered
| Perlassery Sn 2 AE |
| Date: 23/09/2022 |
Work has started | 0% Completed
Estimate to be prepared in Price-3 and is under process
| Perlassery Sn 2 AE |
| Date: 19/09/2022 |
Work has started | 0% Completed
Estimate submitted for OD approval CE,s Office
| Perlassery Sn 2 AE |
| Date: 15/09/2022 |
Work has started | 0% Completed
Estimate submitted for OD approval CE,s Office
| Perlassery Sn 2 AE |
| Date: 11/09/2022 |
Work has started | 0% Completed
Estimate submitted for OD approval CE,s Office
| Perlassery Sn 2 AE |
| Date: 07/09/2022 |
Work has started | 0% Completed
Estimate submitted for OD approval CE,s Office
| Perlassery Sn 2 AE |
| Date: 03/09/2022 |
Work has started | 0% Completed
Estimate submitted for OD approval CE,s Office
| Perlassery Sn 2 AE |
| Date: 30/08/2022 |
Work has started | 0% Completed
Estimate submitted for OD approval CE,s Office
| Perlassery Sn 2 AE |
| Date: 26/08/2022 |
Work has started | 0% Completed
Estimate submitted for OD approval CE,s Office
| Perlassery Sn 2 AE |
| Date: 22/08/2022 |
Work has started | 0% Completed
Estimate submitted for OD approval CE,s Office
| Perlassery Sn 2 AE |
| Date: 18/08/2022 |
Work has started | 0% Completed
Estimate submitted for OD approval CE,s Office
| Perlassery Sn 2 AE |
| Date: 13/08/2022 |
Work has started | 0% Completed
Estimate submitted for OD approval CE,s Office
| Perlassery Sn 2 AE |
| Date: 09/08/2022 |
Work has started | 0% Completed
Estimate submitted for OD approval CE,s Office
| Perlassery Sn 2 AE |
| Date: 07/08/2022 |
Work has started | 0% Completed
Estimate submitted for OD approval CE,s Office
| Perlassery Sn 2 AE |
| Date: 01/08/2022 |
Work has started | 0% Completed
Estimate submitted for OD approval CE,s Office
| Perlassery Sn 2 AE |
| Date: 28/07/2022 |
Work has started | 0% Completed
Estimate submitted for OD approval CE,s Office
| Perlassery Sn 2 AE |
| Date: 24/07/2022 |
Work has started | 0% Completed
Estimate returned with incorporating road reformation estimate- The revised estimate submitted
| Perlassery Sn 2 AE |
| Date: 20/07/2022 |
Work has started | 0% Completed
Estimate returned with incorporating road reformation estimate- The revised estimate submitted
| Perlassery Sn 2 AE |
| Date: 17/07/2022 |
Work has started | 0% Completed
Estimate returned with incorporating road reformation estimate- The revised estimate subhmitted
| Perlassery Sn 2 AE |
| Date: 11/07/2022 |
Work has started | 0% Completed
Estimate returned with incorporating road reformation estimate- The revised estimate submitted
| Perlassery Sn 2 AE |
| Date: 08/07/2022 |
Work has started | 0% Completed
Estimate returned with incorporating road reformation estimate- The revised estimate under preparation
| Perlassery Sn 2 AE |
| Date: 04/07/2022 |
Work has started | 0% Completed
Estimate returned with incorporating road reformation estimate- The revised estimate under preparation
| Perlassery Sn 2 AE |
| Date: 30/06/2022 |
Work has started | 0% Completed
Estimate returned with incorporating road reformation estimate- The revised estimate under preparation
| Kannur PH Dn EE |
| Date: 29/06/2022 |
Work has started | 0% Completed
TS Cancelled and estimate returned to AEE for adding detailed road reformation estimate.
| Perlassery Sn 2 AE |
| Date: 26/06/2022 |
Work has started | 0% Completed
No response even in the extended due dates.To be re-tendered
| Perlassery Sn 2 AE |
| Date: 22/06/2022 |
Work has started | 0% Completed
No response even in the extended due dates.To be re-tendered
| Perlassery Sn 2 AE |
| Date: 19/06/2022 |
Work has started | 0% Completed
No response even in the extended due dates.To be re-tendered.
| Perlassery Sn 2 AE |
| Date: 16/06/2022 |
Work has started | 0% Completed
No response even in the extended due dates.To be re-tendered.
| Kannur PH Dn EE |
| Date: 07/05/2022 |
Work has started | 0% Completed
Due to no response tender due date extended to 09.05.22
| Kannur PH Dn EE |
| Date: 26/03/2022 |
Work has started | 0% Completed
Tender Notice Published
| Kannur PH Dn EE |
| Date: 04/03/2022 |
Work has started | 0% Completed
TS Issued and Tender process started
| Kannur PH Dn EE |
| Date: 19/02/2022 |
Work has started | 0% Completed
Submitted to SE, PHC Kannur for TS
| Kannur PH Dn EE |
| Date: 07/01/2022 |
Work has started | 0% Completed
Submitted to SE, PHC Kannur for TS
| Kannur PH Dn EE |
| Date: 06/01/2022 |
Work has started | 0% Completed
Estimate Submitted