| Kollam Project Dn EE |
| Date: 19/01/2023 |
Work has been completed | 100% Completed
Work completed
| Kollam Project Dn EE |
| Date: 18/01/2023 |
Work in progress | 99% Completed
Constructing valve chamber for interconnection work near ICS tank at Mynagappally completed
| Kollam Project Dn EE |
| Date: 17/01/2023 |
Work in progress | 98% Completed
Constructing valve chamber for interconnection work near ICS tank at Mynagappally completed
| Kollam Project Dn EE |
| Date: 15/01/2023 |
Work in progress | 67% Completed
Interconnection work completed near ICS OHSR in Mynagappally
| Kollam Project Dn EE |
| Date: 12/01/2023 |
Work in progress | 56% Completed
Interconnection work completed near ICS OHSR in Mynagappally
| Kollam Project Dn EE |
| Date: 09/01/2023 |
Work in progress | 51% Completed
Interconnection work completed near ICS OHSR in Mynagappally
| Kollam Project Dn EE |
| Date: 05/01/2023 |
Work in progress | 1% Completed
Agreement executed on 5/1/2023
| Kollam Project Dn EE |
| Date: 04/01/2023 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project Dn EE |
| Date: 03/01/2023 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project Dn EE |
| Date: 31/12/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project Dn EE |
| Date: 29/12/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project HD |
| Date: 26/12/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project HD |
| Date: 24/12/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project HD |
| Date: 22/12/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project HD |
| Date: 21/12/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project HD |
| Date: 19/12/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project HD |
| Date: 17/12/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project HD |
| Date: 16/12/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project HD |
| Date: 14/12/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project HD |
| Date: 12/12/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project HD |
| Date: 09/12/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project HD |
| Date: 08/12/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project HD |
| Date: 07/12/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project Dn EE |
| Date: 05/12/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project Dn EE |
| Date: 03/12/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project Dn EE |
| Date: 02/12/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project Dn EE |
| Date: 01/12/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project HD |
| Date: 30/11/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project Dn EE |
| Date: 29/11/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project HD |
| Date: 28/11/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136
| Kollam Project Dn EE |
| Date: 26/11/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136.
| Kollam Project Dn EE |
| Date: 25/11/2022 |
Work has started | 0% Completed
As part of the Mynagapally water supply project, Rs.50 lakhs was deposited as panchayath share on 03.09.2020 as per letter M4-5849/2020. When this work was completed, the total expenditure was Rs.5305864. As part of the project completion, the existing OHSR at ICS Jn should be interconnected with the new project. The Authority asked the Panchayath Committee to deposit another Rs.6.00 lakh for this work. Accordingly, on 13.10.2022, the Panchayath Committee deposited another 6.00 lakhs Rupees with the Water Authority. From this, after deducting Rs.305864 as an additional cost for completed work, there is a balance of Rs.294136.
| Kollam Project HD |
| Date: 14/10/2022 |
Work has started | 0% Completed
Mynagappally Pt remitted an amount of Rs.6 Lakhs to KWA. Confirmation letter received ON 13.10.2022
| Kollam Project HD |
| Date: 20/08/2022 |
Work has started | 0% Completed
Fund requested to Mynagapally panchayath amounting to Rs 6 lakhs for interconnection work
| Kollam Project HD |
| Date: 19/08/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work
| Kollam Project HD |
| Date: 16/08/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work
| Kollam Project HD |
| Date: 13/08/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work
| Kollam Project HD |
| Date: 11/08/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work.
| Kollam Project HD |
| Date: 08/08/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work.
| Kollam Project HD |
| Date: 06/08/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work.
| Kollam Project HD |
| Date: 04/08/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work.
| Kollam Project HD |
| Date: 30/07/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work.
| Kollam Project Dn AE3 |
| Date: 26/07/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work.
| Kollam Project HD |
| Date: 23/07/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work.
| Kollam Project HD |
| Date: 21/07/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work.
| Kollam Project HD |
| Date: 19/07/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work.
| Kollam Project HD |
| Date: 16/07/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work.
| Kollam Project HD |
| Date: 14/07/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work.
| Kollam Project HD |
| Date: 12/07/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work.
| Kollam Project HD |
| Date: 11/07/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work.
| Kollam Project HD |
| Date: 09/07/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work.
| Kollam Project HD |
| Date: 08/07/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work.
| Kollam Project HD |
| Date: 06/07/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work.
| Kollam Project HD |
| Date: 04/07/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work.
| Kollam Project HD |
| Date: 30/06/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work.
| Kollam Project HD |
| Date: 27/06/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work.
| Kollam Project HD |
| Date: 25/06/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work.
| Kollam Project HD |
| Date: 20/06/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work
| Kollam Project HD |
| Date: 18/06/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayath secretary for obtaining 6 lakh for interconnection work
| Kollam Project HD |
| Date: 16/06/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayat secretary for obtaining 6 lakh for interconnection work
| Kollam Project HD |
| Date: 14/06/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayat secretary for obtaining 6 lakh for interconnection work
| Kollam Project HD |
| Date: 13/06/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayat secretary for obtaining 6 lakh for interconnection work
| Kollam Project HD |
| Date: 10/06/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayat secretary for obtaining 6 lakh for interconnection work
| Kollam Project HD |
| Date: 09/06/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayat secretary for obtaining 6 lakh for interconnection work
| Kollam Project HD |
| Date: 08/06/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayat secretary for obtaining 6 lakh for interconnection work
| Kollam Project HD |
| Date: 07/06/2022 |
Work has started | 0% Completed
A letter is submitted to Panchayat secretary for obtaining 6 lakh for interconnection work