| Thodupuzha PH Dn EE |
| Date: 12/04/2023 |
Work has been completed | 100% Completed
Work has been Completed.
| Thodupuzha PH Dn EE |
| Date: 11/04/2023 |
Work has been completed | 100% Completed
Work has been Completed.
| Thodupuzha PH Dn EE |
| Date: 03/04/2023 |
Work in progress | 95% Completed
Work in progress
| Thodupuzha PH Dn EE |
| Date: 01/04/2023 |
Work in progress | 95% Completed
Work in progress
| Thodupuzha PH Dn EE |
| Date: 30/03/2023 |
Work in progress | 95% Completed
Work in progress
| Thodupuzha PH Dn EE |
| Date: 28/03/2023 |
Work in progress | 95% Completed
Work in progress
| Thodupuzha PH Dn EE |
| Date: 24/03/2023 |
Work in progress | 95% Completed
Work in progress
| Thodupuzha PH Dn EE |
| Date: 22/03/2023 |
Work in progress | 95% Completed
Work in progress
| Thodupuzha PH Dn EE |
| Date: 20/03/2023 |
Work in progress | 95% Completed
Work in progress
| Thodupuzha PH Dn EE |
| Date: 18/03/2023 |
Work in progress | 95% Completed
Work in progress
| Thodupuzha PH Dn EE |
| Date: 15/03/2023 |
Work in progress | 95% Completed
Work in progress
| Thodupuzha PH Dn EE |
| Date: 13/03/2023 |
Work in progress | 95% Completed
Work in progress
| Thodupuzha PH Dn EE |
| Date: 08/03/2023 |
Work in progress | 95% Completed
Work in progress
| Thodupuzha PH Dn EE |
| Date: 06/03/2023 |
Work in progress | 95% Completed
Work in progress
| Thodupuzha PH Dn EE |
| Date: 04/03/2023 |
Work in progress | 95% Completed
Work in progress
| Thodupuzha PH Dn EE |
| Date: 01/03/2023 |
Work in progress | 95% Completed
Work in progress
| Thodupuzha PH Dn EE |
| Date: 27/02/2023 |
Work in progress | 95% Completed
Work in progress
| Thodupuzha PH Dn EE |
| Date: 25/02/2023 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 22/02/2023 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 15/02/2023 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 10/02/2023 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 08/02/2023 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 06/02/2023 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 03/02/2023 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 01/02/2023 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 30/01/2023 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 27/01/2023 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 25/01/2023 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 23/01/2023 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 21/01/2023 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 19/01/2023 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 16/01/2023 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 13/01/2023 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 11/01/2023 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 08/01/2023 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 05/01/2023 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 03/01/2023 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 30/12/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 28/12/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 26/12/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 21/12/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 19/12/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 17/12/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 15/12/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 12/12/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 09/12/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 07/12/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 05/12/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 03/12/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 29/11/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 26/11/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 23/11/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 21/11/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 19/11/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 17/11/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 14/11/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 09/11/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 07/11/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 04/11/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 02/11/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 31/10/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 27/10/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 25/10/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 21/10/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 19/10/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 17/10/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 12/10/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 10/10/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 07/10/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 03/10/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 30/09/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 28/09/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 26/09/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 24/09/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 22/09/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 19/09/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 17/09/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 12/09/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 03/09/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 01/09/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 29/08/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 26/08/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 24/08/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 22/08/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 12/08/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 04/08/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 02/08/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 30/07/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 25/07/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 22/07/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 18/07/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 14/07/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 11/07/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 05/07/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 02/07/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 29/06/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 27/06/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 24/06/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 22/06/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 20/06/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 18/06/2022 |
Work has started | 0% Completed
Work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 15/06/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 13/06/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 08/06/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 06/06/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 02/06/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 31/05/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 28/05/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 25/05/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 23/05/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 20/05/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 16/05/2022 |
Work in progress | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 11/05/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 09/05/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 06/05/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 29/04/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work
| Thodupuzha PH Dn EE |
| Date: 25/04/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work.
| Thodupuzha PH Dn EE |
| Date: 22/04/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work.
| Thodupuzha PH Dn EE |
| Date: 18/04/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work.
| Thodupuzha PH Dn EE |
| Date: 16/04/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work.
| Thodupuzha PH Dn EE |
| Date: 13/04/2022 |
Work in progress | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work.
| Thodupuzha PH Dn EE |
| Date: 11/04/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work.
| Thodupuzha PH Dn EE |
| Date: 08/04/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work.
| Thodupuzha PH Dn EE |
| Date: 06/04/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work.
| Thodupuzha PH Dn EE |
| Date: 04/04/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work.
| Thodupuzha PH Dn EE |
| Date: 01/04/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work.
| Thodupuzha PH Dn EE |
| Date: 28/03/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work.
| Thodupuzha PH Dn EE |
| Date: 25/03/2022 |
Work has started | 0% Completed
work handed over to PH Sub Division Thodupuzha to Tender and arrange the work.