Absract of estimate
laying charge - 805887.77 cost of materials - 212260.62 road restoration charge (NH) - 3423647.10 (requested for actual estimate)
Site sketch
line drawing for laying 63mm/50mm GI pipe from the existing 63mm PVC pipe