DW-Kochi Corporation -Replacing the existing 63 mm PVC pipe in construction of canal side wall with supplying and laying new 63 mm HDPEb pipe (8 kg/cm2) for a length of 65 m at Edappally -Arakkakadavu road in Div no:34 (old) of Kochi Corporation.
Project |
DW-Kochi Corporation -Replacing the existing 63 mm PVC pipe in construction of canal side wall with supplying and laying new 63 mm HDPEb pipe (8 kg/cm2) for a length of 65 m at Edappally -Arakkakadavu road in Div no:34 (old) of Kochi Corporation. |
Project Code |
EKMDEPO03218808 |
Type |
Main project |
Funding Agency |
DEPO |
Category |
Deposit Work |
Type of scheme |
Water Supply |
Scheme |
DEPO |
Description |
DW-Kochi Corporation -Replacing the existing 63 mm PVC pipe in construction of canal side wall with supplying and laying new 63 mm HDPE pipe (8 kg/cm2) for a length of 65 m at Edappally -Arakkakadavu road in Div no:34 (old) of Kochi Corporation. |
Status |
On-going |
District |
Ernakulam |
Executing Office |
Kaloor Sub Dn 2 |
AS Amount (Rs) |
63000
|
AS Number |
S-1615/21 CBe no 18 of 3/2021 |
TS Amount (Rs) |
35000 |
TS Number |
TS/2021-2022/2020/9317 |
Total Bill Submitted (Rs) |
0 |
Total Bill Paid (Rs) |
0 |
Population Benefitted |
20379 |
Capacity in MLD |
0.25 |
Actual Project Completion Date |
Date is not specified |
Coverage |
DW-Kochi Corporation -Replacing the existing 63 mm PVC pipe in construction of canal side wall with supplying and laying new 63 mm HDPE pipe (8 kg/cm2) for a length of 65 m at Edappally -Arakkakadavu road in Div no:34 (old) of Kochi Corporation. |
Implementation Schedule |
Download |
Work Plan |
Download |
Packages
No. |
Project Name |
Location |
View |
1 |
DW-Kochi Corporation -Replacing the existing 63 mm PVC pipe in construction of canal side wall with supplying and laying new 63 mm HDPEb pipe (8 kg/cm2) for a length of 65 m at Edappally -Arakkakadavu road in Div no:34 (old) of Kochi Corporation. |
Kaloor WW Sn1 |
|
Overall Project Status
Status Date |
Overall Project Status |
Project Officer |
Contact |
07 May 2024 |
Contractor not willing, work may dropped |
Kaloor AE 1 |
|
02 May 2024 |
Contractor not willing, work may dropped |
Kaloor AE 1 |
|
23 Apr 2024 |
Contractor not willing, work may dropped |
Kaloor AE 1 |
|
17 Apr 2024 |
Contractor not willing, work may dropped |
Kaloor AE 1 |
|
09 Apr 2024 |
Contractor not willing, work may dropped |
Kaloor AE 1 |
|
No project review have been added to this project
Duration & Sanction dates
Date of start of Project |
30/03/2022 |
Scheduled date of Completion of the Project |
15 Apr 2022 |
Expected date of Completion |
31/07/2023 |
Processing Dates
AS Date |
05 Mar 2021 |
TS Date |
07 Dec 2021 |