Sl.No. | Component | Description |
---|---|---|
1 | PROVIDING FHTCs | 6055 NOS |
2 | PROVIDING 15MM PVC TAP | 6055 NOS |
3 | CUTTING THE BITUMINOUS / CONCRETE ROADS | 1200 M |
4 | PROVIDING AND LAYING IN POSITION CC | 625 CUM |
5 | COST OF GEO TAGGING CONNECTIONS | 6055 NOS |
6 | PROVIDING SUPPORTS FOR THE FHTCs USING 75MM PVC PIPE 6 KG/ CM2 | 6055 NOS |
7 | PROVIDING AND FIXING 40MM GI PIPES | 3000 - 1 M |
8 | PROVIDING AND FIXING GI PIPES | 5000 M |
9 | SUPPLY OF PVC PIPE 6KG/CM2, 90MM DIA | 3000 M |
10 | PROVIDING 20MM (1/2 INCH) PVC AIR VALVE | 1200 NOS |
11 | PROVIDING ADDITIONAL LENGTH OF HOUSE CONECTION PIPES | 1200 M |
12 | SUPPLY , STACKING, SPREADING AND CONSOLIDATING OF QUARRY MUCK | 225 CUM |
13 | PWD ROAD RESTORATION | |
14 | CONSTRUCTION OF GRANULAR SUB-BASE | 825 CUM |
15 | PROVIDING, LAYING, SPREADING AND COMPACTING GRADED STONE AGGREGATE TO WET MIX MACADAM | 825 CUM |
16 | PROVIDING AND APPLYING PRIMER COAT WITH BITUMEN EMULSION (SS) | 5500 SQM |
17 | PROVIDING AND APPLYING TACK COAT WITH BITUMEN EMULSION(RS) | 5500 SQM |
18 | PROVIDING AND LAYING BOTUMINOUS MACADAM WITH 80-100 TPHHOT MIX PLANT | 275 CUM |
19 | PROVIDING AND APPLYING TACK COAT WITH BITUMEN EMULSION (RS) | 5500 SQM |
20 | PROVIDING AND LAYING BITUMINOUS CONCRETE WITH 80-100 TPH | 165 CUM |
21 | PROVIDING AND LAYING OF HOT APPLIED THERMOPLASTIC COMPOUND 2.5MM THICK | 550 SQM |
22 | PROVIDING AND FIXING REFLECTIVE ROAD STUDS (RAISED PAVEMENT MARKER) | 730 NOS |
23 | PLAIN / REINFORCED CC IN OPEN FOUNDATION | 4.380 CUM |
24 | PLAIN CEMENT CONCRETE 1:3:6 NOMINAL MIX IN FOUNDATION | 112.5 CUM |
25 | PLAIN / REINFORCED CC IN OPEN FOUNDATION | 75 CUM |
26 | RCC PIPE CARRYING BRIDGE |