Sl.No. |
Component |
Description |
1
|
Construction of OHSR |
Design construction ,commissioning and maintanance of 8 LL OHSR ,7LL OHSR and 11 LL OHSR in MALAMPUZHA and marutha road panchayath |
2
|
Laying work |
Laying CWPM to padalikkad JTS marutha road OHSR and existing kandathupara OHSR and distribution main line |
3
|
Mechanichal works |
Railway crossing by HDD method , construction of pump house at Malampuzha KWA compound for malampuzha panchayath, supply and errection of pumpset , laying CWPM to malampuzha plant OHSR and Distribution line mains, Road restoration work for PWD and PMGSY |
4
|
Construction of OHSR |
7 LL OHSR at padalikkad school compound in Marutharoad Panchayath |
5
|
Construction of OHSR |
11 LL OHSR at JTS Marutha road |
6
|
Construction of OHSR |
8.00 LL OHSR at Malampuzha KWA compound |
7
|
Laying CWPM to padalikkad JTS marutha road OHSR and existing kandathupara OHSR and distribution main line |
350mm , DI K9 FOR Pumping main,350 mmDI K9 FOR Distribution main,300 mm,200mm,400 mm,90mm pvc, |
8
|
350mm , DI K9 FOR Pumping main, |
6125m |
9
|
350 mmDI K9 FOR Distribution main, |
276m |
10
|
350mm dia 10mm thick MS ERW |
305M |
11
|
300 mm MS ERW |
15M |
12
|
300mm DI K9 pipe- |
4311m |
13
|
200mm DI K9 |
309 M |
14
|
400 mm DI K9 |
15m |
15
|
90mm PVC for rider main |
540m |
16
|
Railway crossing by HDD method , |
40 m |
17
|
construction of pump house |
Malampuzha KWA compound |
18
|
supply and errection of pumpset |
15 HP, 56HP |
19
|
15 HP Centrifugal motor pumset |
2 nos (1 standby), Head 31 m, discharge-25 lps, |
20
|
56 HP centrifugal motor pumpset- |
2 nos ,1 stand by),head 50 m, discharge-59 lps |
21
|
mechanichcal flow meter |
80mm size -1 no |
22
|
laying CWPM to malampuzha plant OHSR and Distribution line mains, |
200mm DI K9 FOR PUMPING MAIN -101 M |
23
|
Road restoration work |
PWD and PMGSY |