1 Construction of OHSR Design construction ,commissioning and maintanance of 8 LL OHSR ,7LL OHSR and 11 LL OHSR in MALAMPUZHA and marutha road panchayath
2 Laying work Laying CWPM to padalikkad JTS marutha road OHSR and existing kandathupara OHSR and distribution main line
3 Mechanichal works Railway crossing by HDD method , construction of pump house at Malampuzha KWA compound for malampuzha panchayath, supply and errection of pumpset , laying CWPM to malampuzha plant OHSR and Distribution line mains, Road restoration work for PWD and PMGSY
4 Construction of OHSR 7 LL OHSR at padalikkad school compound in Marutharoad Panchayath
5 Construction of OHSR 11 LL OHSR at JTS Marutha road
6 Construction of OHSR 8.00 LL OHSR at Malampuzha KWA compound
7 Laying CWPM to padalikkad JTS marutha road OHSR and existing kandathupara OHSR and distribution main line 350mm , DI K9 FOR Pumping main,350 mmDI K9 FOR Distribution main,300 mm,200mm,400 mm,90mm pvc,
8 350mm , DI K9 FOR Pumping main, 6125m
9 350 mmDI K9 FOR Distribution main, 276m
10 350mm dia 10mm thick MS ERW 305M
11 300 mm MS ERW 15M
12 300mm DI K9 pipe- 4311m
13 200mm DI K9 309 M
14 400 mm DI K9 15m
15 90mm PVC for rider main 540m
16 Railway crossing by HDD method , 40 m
17 construction of pump house Malampuzha KWA compound
18 supply and errection of pumpset 15 HP, 56HP
19 15 HP Centrifugal motor pumset 2 nos (1 standby), Head 31 m, discharge-25 lps,
20 56 HP centrifugal motor pumpset- 2 nos ,1 stand by),head 50 m, discharge-59 lps
21 mechanichcal flow meter 80mm size -1 no
22 laying CWPM to malampuzha plant OHSR and Distribution line mains, 200mm DI K9 FOR PUMPING MAIN -101 M
23 Road restoration work PWD and PMGSY