| Status Date | Overall Project Status | Project Officer | Contact |
|---|---|---|---|
| 14 Mar 2025 | 75mm (8kg/cm2) PVC pipe laying work Completed. 400m pipe laid. | Kottiyam PH Sn AE | |
| 14 Mar 2025 | 75mm (8kg/cm2) PVC pipe laying work ongoing. 400m pipe laid. | Kottiyam PH Sn AE | |
| 10 Mar 2025 | 75mm (8kg/cm2) PVC pipe laying work ongoing. 360m pipe laid. | Kottiyam PH Sn AE | |
| 05 Mar 2025 | 75mm (8kg/cm2) PVC pipe laying work ongoing. 200m pipe laid. | Kottiyam PH Sn AE | |
| 03 Mar 2025 | Work started. Pipe laying work in progress | Kottiyam PH Sn AE | |
| 27 Feb 2025 | This is the work of berm cutting (400m) along the side of Mukkam-Thani Beach road and laying the pipeline.This road is under Harbour department, Thangassery,kollam. Therefore in order to get the permission to cut the road, a joint inspection was conducted with the harbour Dept as on 06.12.2024.During site inspection, it was identified that there is kseb ug cable has gone along the same part of road.Hence we arranged a site inspection with KSEB paravoor section as on 10.12.2024.Based on this inspection, a letter was sent by kseb showing that there is no obstruction to laying the pipe along this part of road and they informed harbour department. After this a Demand notice received from harbour dept as on 21.12.24.This demand notice details has been sent from this office to PH division through e-mail for payment of Rs 86,374/- | Kottiyam PH Sn AE | |
| 22 Feb 2025 | This is the work of berm cutting (400m) along the side of Mukkam-Thani Beach road and laying the pipeline.This road is under Harbour department, Thangassery,kollam. Therefore in order to get the permission to cut the road, a joint inspection was conducted with the harbour Dept as on 06.12.2024.During site inspection, it was identified that there is kseb ug cable has gone along the same part of road.Hence we arranged a site inspection with KSEB paravoor section as on 10.12.2024.Based on this inspection, a letter was sent by kseb showing that there is no obstruction to laying the pipe along this part of road and they informed harbour department. After this a Demand notice received from harbour dept as on 21.12.24.This demand notice details has been sent from this office to PH division through e-mail for payment of Rs 86,374/- | Kottiyam PH Sn AE | |
| 15 Feb 2025 | This is the work of berm cutting (400m) along the side of Mukkam-Thani Beach road and laying the pipeline.This road is under Harbour department, Thangassery,kollam. Therefore in order to get the permission to cut the road, a joint inspection was conducted with the harbour Dept as on 06.12.2024.During site inspection, it was identified that there is kseb ug cable has gone along the same part of road.Hence we arranged a site inspection with KSEB paravoor section as on 10.12.2024.Based on this inspection, a letter was sent by kseb showing that there is no obstruction to laying the pipe along this part of road and they informed harbour department. After this a Demand notice received from harbour dept as on 21.12.24.This demand notice details has been sent from this office to PH division through e-mail for payment of Rs 86,374/- | Kottiyam PH Sn AE | |
| 11 Feb 2025 | This is the work of berm cutting (400m) along the side of Mukkam-Thani Beach road and laying the pipeline.This road is under Harbour department, Thangassery,kollam. Therefore in order to get the permission to cut the road, a joint inspection was conducted with the harbour Dept as on 06.12.2024.During site inspection, it was identified that there is kseb ug cable has gone along the same part of road.Hence we arranged a site inspection with KSEB paravoor section as on 10.12.2024.Based on this inspection, a letter was sent by kseb showing that there is no obstruction to laying the pipe along this part of road and they informed harbour department. After this a Demand notice received from harbour dept as on 21.12.24.This demand notice details has been sent from this office to PH division through e-mail for payment of Rs 86,374/- | Kottiyam PH Sn AE | |
| 07 Feb 2025 | This is the work of berm cutting (400m) along the side of Mukkam-Thani Beach road and laying the pipeline.This road is under Harbour department, Thangassery,kollam. Therefore in order to get the permission to cut the road, a joint inspection was conducted with the harbour Dept as on 06.12.2024.During site inspection, it was identified that there is kseb ug cable has gone along the same part of road.Hence we arranged a site inspection with KSEB paravoor section as on 10.12.2024.Based on this inspection, a letter was sent by kseb showing that there is no obstruction to laying the pipe along this part of road and they informed harbour department. After this a Demand notice received from harbour dept as on 21.12.24.This demand notice details has been sent from this office to PH division through e-mail for payment of Rs 86,374/- | Kottiyam PH Sn AE |