KIIFB- Design Construction and Commissioning of Water Supply Scheme to Zoological Park-Wild Life Conservation and Research centre at Puthur in Thrissur District
Project |
KIIFB- Design Construction and Commissioning of Water Supply Scheme to Zoological Park-Wild Life Conservation and Research centre at Puthur in Thrissur District |
Project Code |
TCRGOK08185295 |
Type |
Main project |
Funding Agency |
GOK |
Category |
KIIFB |
Type of scheme |
Water Supply |
Scheme |
2215-02-106-97 |
Description |
This scheme is sanctioned under KIIFB projects for providing a water supply scheme to the upcoming Zoological Park at Puthur in Thrissur District.Components are 6 M dia.Intake well, Pump house, 1.5 MLD water treatment plant,200 mm DI Raw water pumping main-4000M,100 mm DI clear water pumping main 225 M, Raw water pump sets (VT-discharge 18.75 lps, head 98 m),Clear water pumpsets, RCC sumps- 1LL and 6LL. |
Status |
Completed |
District |
Thrissur |
Executing Office |
Peechi PH Sn |
AS Amount (Rs) |
1838200000
|
AS Number |
G.O9M.S)No.34/2018/F&WLD |
TS Amount (Rs) |
91000000 |
TS Number |
TS/2019-20/2018/14788 |
Total Bill Submitted (Rs) |
42349450 |
Total Bill Paid (Rs) |
42349450 |
Population Benefitted |
5000 |
Capacity in MLD |
1.50 |
Actual Project Completion Date |
29 Mar 2021 |
Coverage |
Exclusively for the requirements of zoological park :
Work Completed |
Implementation Schedule |
Download |
Work Plan |
Download |
Packages
No. |
Project Name |
Location |
View |
1 |
KIIFB- Design Construction and Commissioning of Water Supply Scheme to Zoological Park-Wild Life Conservation and Research centre at Puthur in Thrissur District |
Peechi PH Sn |
|
Overall Project Status
Status Date |
Overall Project Status |
Project Officer |
Contact |
03 Feb 2022 |
Work Completed |
Thrissur PH Dn EE |
|
17 Dec 2021 |
10 LL OHSR roof slab completed including plastering work , Lamella clarifier completed including plastering. Construction of baffled flocculator completed including plastering, WTP structural work completed, 1 LL GLSR, 6LL GLSR completed including plastering. Raw water pumping main laying completed. Raw water pump sets erected , power connection obtained and trial running completed, Aluminum fabrication doors and windows work completed, pressure filter installation work completed, Landscape work completed, power connection obtained, WTP trial run completed, DLPC Period started.
|
Peechi PH Sn - AE |
|
28 Oct 2021 |
10 LL OHSR roof slab completed including plastering work , Lamella clarifier completed including plastering. Construction of baffled flocculator completed including plastering, WTP structural work completed, 1 LL GLSR, 6LL GLSR completed including plastering. Raw water pumping main laying completed. Raw water pump sets erected , power connection obtained and trial running completed, Aluminum fabrication doors and windows work completed, pressure filter installation work completed, Landscape work completed, power connection obtained, WTP trial run completed, DLPC Period started. |
Thrissur PH Dn EE |
|
27 Aug 2021 |
10 LL OHSR roof slab completed including plastering work , Lamella clarifier completed including plastering. Construction of baffled flocculator completed including plastering, WTP structural work completed, 1 LL GLSR, 6LL GLSR completed including plastering. Raw water pumping main laying completed. Raw water pump sets erected , power connection obtained and trial running completed, Aluminum fabrication doors and windows work completed, pressure filter installation work completed, Landscape work completed, WTP ready for trial running, power connection not obtained. |
Thrissur PH Dn EE |
|
17 Jul 2021 |
10 LL OHSR roof slab completed including plastering work , Lamella clarifier completed including plastering. Construction of baffled flocculator completed including plastering, WTP structural work completed, 1 LL GLSR, 6LL GLSR completed including plastering. Raw water pumping main laying completed. Raw water pump sets erected , power connection obtained and trial running completed, Aluminium fabrication doors and windows work in progress, pressure filter installation work in progress. |
Thrissur PH Dn EE |
|
No project review have been added to this project
Duration & Sanction dates
Date of start of Project |
20/02/2020 |
Scheduled date of Completion of the Project |
31 May 2021 |
Expected date of Completion |
31/01/2022 |
Processing Dates
AS Date |
08 Aug 2018 |
TS Date |
06 Jul 2019 |