DEPOSIT WORK - KRFB :- TEMPORARY REALIGNMENT OF PIPE LINE OVER PATHIYOOR BRIDGE USING 110 MM HDPE LINE FOR CONSTRUCTION OF NEW BRIDGE NEAR PATHIYOOR TEMPLE IN PATHIYOOR PANCHAYAT.
Project |
DEPOSIT WORK - KRFB :- TEMPORARY REALIGNMENT OF PIPE LINE OVER PATHIYOOR BRIDGE USING 110 MM HDPE LINE FOR CONSTRUCTION OF NEW BRIDGE NEAR PATHIYOOR TEMPLE IN PATHIYOOR PANCHAYAT. |
Project Code |
ALPDEPO101910144 |
Type |
Main project |
Funding Agency |
DEPO |
Category |
Deposit Work |
Type of scheme |
Water Supply |
Scheme |
DEPO |
Description |
DEPOSIT WORK - KRFB :- TEMPORARY REALIGNMENT OF PIPE LINE OVER PATHIYOOR BRIDGE USING 110 MM HDPE LINE FOR CONSTRUCTION OF NEW BRIDGE NEAR PATHIYOOR TEMPLE IN PATHIYOOR PANCHAYAT. SANCTION ACCORDED FOR CONSTRUCTION OF TWO NEW BRIDGES (AT MALAYIL AND PATHIYOOR) THROUGH KRFB. SO, KRFB DEPOSITED PIPE LINE SHIFTING CHARGES AMOUNTING RS1230000/- TO KWA. KWA CARRIED OUT TEMPORARY AND PERMANENT SHIFTING OF PIPE LINES AT MALAYIL BRIDGE. TEMPORARY SHIFTING OF PIPE LINERS OVER PATHIYOOR BRIDGE (200 MM CI /MS) WAS ARRANGED AS QUOTATION WORK USING 110 MM PVC PIPE AND LAYING OF PVC PIPE LINE IS PROPOSED OVER THE TEMPORARY SAND BUND. TO LAY PIPE LINE OVER SAND BUND, PIPE LINE IS TO BE CROSSED THROUGH SOME PRIVATE PROPERTIES. NOW, THERE IS SOME LAND ISSUES AND HENCE, IT MAY NOT POSSIBLE TO LAY PIPE LINE THROUGH BUND. HENCE, AS PER DIRECTION OF HON. MLA'S REVIEW MEETING DATED 21/03/2022, JOINT INSPECTION DONE WITH OFFICIALS OF KRFB ON 23/03/2022 AND DECIDED TO LAY PIPE LINE THROUGH UNDER WATER USING HDPE PIPE. THE REVISED ESTIMATE IS PREPARED BASED ON THE LETTER NO. KRFB-PMU/ALP/EE-1-8/2021 DATED 25.03.2022 FROM EXECUTIVE ENGINEER, KRFB-PMU ALAPPUZHA FOR TEMPORARY REALIGNMENT OF PIPE LINE IN BRIDGE PORTION IN CONNECTION WITH CONSTRUCTION OF NEW BRIDGE.THE DETAILS OF DEPOSITED AMOUNT, UTILIZED AMOUNT AND BALANCE AMOUNT WITH KWA ETC IS ATTACHED IN DETAILS 3. OUT OF DEPOSITED RS1230000/- , THE EXPENDITURE INCURRED IS ONLY RS135090/-. HENCE, SUFFICIENT FUND AVAILABLE WITH KWA FOR EXECUTION OF THIS WORK AS WELL AS FOR PERMANENT LAYING OF PIPE LINE OVER THE BRIDGE AFTER CONSTRUCTION OF NEW BRIDGE |
Status |
Completed |
District |
Alappuzha |
Executing Office |
Kayamkulam PH Sn |
AS Amount (Rs) |
1230000
|
AS Number |
12/PWD004-93/PD/PMU-KRFB/137R/ALPY/2017 |
TS Amount (Rs) |
191000 |
TS Number |
ORDER No. TS/2021-2022/2022/12171 Dated: 29-03-2022 |
Total Bill Submitted (Rs) |
0 |
Total Bill Paid (Rs) |
0 |
Population Benefitted |
1000 |
Capacity in MLD |
1.00 |
Actual Project Completion Date |
03 May 2022 |
Coverage |
Pathiyoor bridge |
Implementation Schedule |
Download |
Work Plan |
Download |
Packages
No. |
Project Name |
Location |
View |
1 |
DEPOSIT WORK - KRFB :- TEMPORARY REALIGNMENT OF PIPE LINE OVER PATHIYOOR BRIDGE USING 110 MM HDPE LINE FOR CONSTRUCTION OF NEW BRIDGE NEAR PATHIYOOR TEMPLE IN PATHIYOOR PANCHAYAT. |
Kayamkulam PH Sn |
|
Overall Project Status
Status Date |
Overall Project Status |
Project Officer |
Contact |
03 May 2022 |
work completed |
Kayamkulam AE |
|
No project review have been added to this project
Duration & Sanction dates
Date of start of Project |
08/04/2022 |
Scheduled date of Completion of the Project |
22 Apr 2022 |
Expected date of Completion |
30/04/2022 |
Processing Dates
AS Date |
10 Oct 2019 |
TS Date |
29 Mar 2022 |