Jal Jeevan Mission(JJM)-Phase IV-WSS to Kaduthuruthy,Kallara &Kuravilangadu Panchayath(Kaduthuruthy,-Package 1)

Project Jal Jeevan Mission(JJM)-Phase IV-WSS to Kaduthuruthy,Kallara &Kuravilangadu Panchayath(Kaduthuruthy,-Package 1)
Project Code KTMJJM052213403P2
Type Package
Main Project Jal Jeevan Mission (JJM)-Phase IV-WSS to Kaduthuruthy,kallara &Kuravilangadu pancahayth
Funding Agency JJM
Category JJM
Type of scheme Water Supply
Scheme 4215-01-102-92-02
Description Jal Jeevan Mission(JJM)-Phase IV-WSS to Kaduthuruthy,Kallara &Kuravilangadu Panchayath(Kaduthuruthy,-Package 1)
Status On-going
District Kottayam
Executing Office Kaduthuruthy Sn
Agreement Number
Agreement Date
TS Amount (Rs) 487000000
TS Number WRD/KWA-CEP /EST_TS/130/2022_26_1 _1 Dated 09-12-2022
Technical specification DETAILED ENGINEERING REPORT 1.INTRODUCTION Kaduthuruthy, Kallara and Kuravilangadu panchayath are situated in Vaikom and Meenachil taluk in Kottayam district. The total population of these panchayaths 84840 and having households 16968 nos. Due to the absence of perennial sources of water in this locality like rivers, lakes, or large ponds for catering the needs of people, they depend on open wells for water .This Project is aimed for providing FHTC to the entire area of Kaduhuruthy, Kallara and Kuravilangad Panchayath, Kottayam District of Kerala State. Since this place has an undulating terrain, water scarcity is usual in every summer season on the elevated places. Considering all these facts a comprehensive rural water supply scheme namely ‘ARWSS toVeliyannoor and adjoining villages’ was conceived in late nineties for catering the demand of nearby villages also. . 2. BRIEF HISTORY OF SCHEME The scheme area is located in the northern portion of Kottayam District. Acute scarcity of drinking water is being experienced in the scheme area. So a piped water supply system for providing safe and potable water to the public is proposed for a group of villages laying in the northern boundary of Kottayam District. There are four schemes combined together with separate entities and having a common source.,viz, 4 1. ARWSS to Veliyannoor and adjoining villages phase I : For Mulakkulam and Velloor villages. 2. ARWSS to Veliyannoor and adjoining villages phase II : For Njeezhoor and Kuravilangadu villages. 3. ARWSS to Veliyannoor and adjoining villages phase III : For Uzhavoor and Veliyannoor villages. 4. ARWSS to Kallara village : For Kallara village. The Muvattupuzha River is flowing in the northern boundary of Kottayam district. This river is perennial for the reason that the tail race water from Idukki hydro- electric project discharges to this river. Muvattupuzha River is proposed as the common source for the 4 schemes with a single intake is at Changalappalam near Mevelloor in Velloor Panchayat. A 45 MLD Water treatment plant is constructed and commissioned at Mevelloor. A fullfledged water treatment process consisting Aeration, Coagulation, Flocculation, Sedimentation, Filtration and Disinfection by chlorination is adopted in the Plant. The scheme ARWSS to Veliyannoor and adjoining villages - Phase I and Phase II and Phase III and ARWSS to Kallara has already were completed., except the works in Kuravilangad village. The existing system consist of intake arrangements, Water Treatment Plant, Electrical Installations, Pump sets and Pumping/ Gravity mains and Storage/Service Reservoirs. There are 5 17 nos OHSR/GLSR in the net work system of which 14 were already completed and commissioned. The remaining 3 nos. GLSR/OHSR was intended for Kuravilangadu Village. 3. SALIENT FEATURES 1 TITLE OF THE PROJECT Jal Jeevan Mission-2021-2022-PHASE IVMULTIPANCHAYATH SCHEME FOR KADUTHURUTHY, KALLARA & KURAVILANGAD PANCHAYATH UNDER P H DIVISION KADUTHURUTHY 2 Details of Project Location i. District Kottayam ii. Taluk Meenachil & Vaikom iii. Panchayath Kaduthuruthy , Kallara & Kuravilangad iv. Assembly Constituency Kaduthuruthy 3 Implementing Agent/SPV Kerala Water Authority 4 Nature of the project Improvements of existing distribution system , construction of OHSR and providing water connection 5 Present status of WSS , If any In Operation 6 Need for the project Even after completion of the existing schemeARWSS to Veliyannoor and adjoining villages, JJM 2020-21 Phase I & II, in all wards of the above panchayaths are lacking adequate supply of water due to lack of adequate capacity of over head tanks and inadequate existing distribution lines for providing water connections. 7 Details of proposed scheme 8 i. OHSR 1) 7.0 LL Near ARNOOTIMANGALAM 2) 10LL OHSR AT SIDHANDIKUNNU 6 9 ii. Centrifugal Pump Set 1. 175 HP(2 Nos)at 45 MLD WTP at Mevelloor 2. 40 HP(2 Nos) at existing Kaduthuruthy Boosting Station 10 iii. Other details 11 Panchayath Provi ding water connections Length of distribution Length of Pumping main& gravity main KADUTHURUTHY 5291 51752 KALLARA 1169 13822 23300 KURAVILANGADU 2167 39016 Total 8627 104590 23300 12 Total estimated cost and item wise cost break up & as per which schedule of rates (year) 7902Lakhs As per DSR 2018 with Cost index 36.44%. 13 Whether detailed estimate attached? YES 14 Details of project risks 1. Road cutting permission from public works department 15 Details of project management strategy The entire implementation team and Contractor shall work as a team for timely completion of the Project with minimum interruption of water supply in the existing scheme area. Weekly review meetings will be conducted by the Executive Engineer about the progress and bottlenecks 16 Details of contract management strategy Schedule Tender 17 Details of statutory clearances 1. Road cutting from PWD. 18 Quality control infrastructure and mechanism Strict quality control will be ensured by KWA 19 Operations & maintenance (O&M) arrangements of the project after completion Operation and maintenance in accordance with JJM guide lines. 7 4.GENERAL DETAILS OF PANCHAYATH Kuravilangadu Kuravilangadu village is located in Kottayam district of Kerala. This village is situated in Meenachil Taluk, about 20 kilometers north of Kottayam and close to the town Ettumannoor and places like Kalathoor, Kalikavu, Vempally, Uzhavoor, Marangattupalli, Vakkadu, Elakkadu and Kanjirathanam. The M.C. Road passes through the middle of this village in north south direction. The majority of the people residing in the area is the followers of Christianity. Kuravilangadu is known as the “Vatikkan of India” and also “Kizhakkinte Lourde” . The church of Kuravilangadu was constructed in the third century, nearly a century before Constatine declared Christianity as the official religion in the Roman Empire. The land is blessed by the esteemed presence of St.Mary’s Forane Church, which was built in 105 AD. According to believers, Mother Mary’s first appearance in the world, was in Kuravilangad. Even though this place has certain prominence in history, the facilities like water supply and tourism are not yet attained any significant concern all these years. The area is undulating with hills and valleys. The main agricultural crop is rubber and food grains. The literacy level is 99.12%. The major educational institutions are of paramedical education. There is no important industrial establishment in the village. People mainly depended on small business and agricultural activities to carry out their day to day life. Due to the absence of perennial sources of water in the locality like rivers, lakes, or large ponds for catering the needs of people, they depend on open wells for water. Since this place has an undulating terrain water scarcity is usual in every summer season on the elevated places. Considering all these facts a comprehensive rural water supply scheme namely ‘ARWSS to Veliyannoor and adjoining villages’ was conceived in late nineties for catering the demand of nearby villages also. Currently there is no scheme for water 8 authority in kuravilangadu panchayath,and Rebuild Kerala initiative project is progressing in the panchayath. NAME Kuravilangadu Grama Panchayat INCLIDING VILLAGES Kuravilangadu BLOCK PANCHAYATH Uzhavoor DISTRICT Kottayam CONSTITUENCY Kaduthuruthy TALUK Meenachil BOUNDARY North - Njeezhoor, Maranagattupilly grama panchayaths East - Marangattupilly,Kadaplamattom Grama panchayaths South - Kanakkary Grama panchayaths West - Kaduthuruthy,Manjoor, Grama panchayaths AREA 17.57 Sq.km POPULATION 18242 (based on census 2011 ) ( 18931, based on caste census 2012 ) FEMALES 9274 (based on census 2011 ) ( 9639, based on caste census 2012 ) MALES 8968 (based on census 2011 ) ( 9292, based on caste census 2012 ) DENSITY OF POPULATION 1038.247 based on census 2011 WARDS 14 TOTAL HOUSEHOLDS 4667 Kaduthuruthy Kaduthuruthy panchayath is located in northern portion of Kottayam district coming under Vaikom Taluk. The total area of Kaduthuruthy y panchayath is 36.31 Sq.Km. The topography of the panchayath is undulated terrain. The Population as per 2011 census is 31844 Nos and having House hold 8471cNos. Existing water connection in Kaduthuruthy panchayath is 3359 Nos before JJM project. In JJM Phase I sanctioned is 1000 Nos. The source of the scheme is Mvattupuzha river and raw water is treated at 45MLD water treatment plant at Mevalloor College.At present Treated waterfrom the 45MLD water treatment plant is pumped to the 15 LakhsLtr. Capacity OHSR at Jathikkamala through a 250mm Pumping main from WTP. 9 NAME Kaduthuruthy Grama Panchayat INCLIDING VILLAGES Kaduthuruthy& Muttuchira BLOCK PANCHAYATH Kaduthuruthy DISTRICT Kottayam CONSTITUENCY Kaduthuruthy TALUK Vaikom BOUNDARY North - Thalayolaparambu grama panchayaths East - Kuravilangad Grama panchayaths South –Manjoor Grama panchayaths West - Kallara Grama panchayaths AREA 36.31 Sq.Km POPULATION 31844 WARDS 19 TOTAL HOUSEHOLDS 8471 5.PRESENT PROPOSAL In this backdrop Jal Jeevan Mission (JJM) has been launched which aims at providing functional house hold tap connection to every rural household by 2024. The programme focuses as service delivery at household level i.e., water supply on regular basis in adequate quality and prescribed quality. Due to in- 11 creasing the demand of treated water supply in these four panchayath, JJM project aiming for giving 8627 no of household connections in Kaduhuruthy, Kallara and Kuravilangad Panchayath by augmenting the scheme which is beneficial to the existing consumers. Already functioning OHSR at Jathikkamala is unable to meet the current requirement of all the 6 panchayaths. For supplying Kaduthuruthy, Kallara ,Kuravilangad, Njeezhoor, Mulakkulam & part of Velloor Panchayath 15 MLDs of water required. But at present scenario design can be only utilised for 6.5 MLD, which is about 8.5 MLD less than the actual requirement. This leads to lack of supply of water in western part of Kallara Panchayath like Mundar (upper Kuttanad) area and elevated places like Arunoottimangalam, Myladumpara etc. And a RKI new scheme for Kuravilangad Panchayath has been ongoing stage, which requires 3 MLDs of water. Hence submitting herewith the proposal for separation of Kaduthuruthy, Kallara and Kuravilangad Panchayath from the existing Jhathikkamala OHSR. At present in Kaduthuruthy ,Kallara water supply is scheduled only twice in a week .And there is a frequent pipe leakage issue in gravity main from Jathikkamala to Kaduthuruthy Rajan kavala Arnoottimangalam PWD road.And this also affects the regular water supply in these panchayaths.The present proposal aiming new pump house, pump & motor ,clear water channel ,2 nos of OHSR , 400mm DI pumping main, 400mm DI , 250mm DI & 200 mm DI gravity main, extension of pipelines to non covered wards and also for providing house hold connections to all 12 houses wherever possible. By executing this project already existing consumers in these panchayaths also benefitted and it will be a solution for above mentioned issues. Hence the new proposal is aiming for giving supply at Kaduthuruthy, Kallara, and Kuravilangad Panchayath comprising of following components 1. Pumping Main from Plant to Arunoottimangalam 400mm DI pipe 2. Gravity Main from Arunoottimangalam to Alari 400mm DI pipe 3. Gravity Main from Alari to Kaduthuruthy 350mm DI pipe 4. Gravity Main from Kaduthuruthy to Kallara 200mm DI pipe 5. Construction of 7 LL OHSR at Aranoottimangalam 6. Pump & Motor at Pump House 7. Pump House ,Clear water channel,Power Allocation etc. 8. Kallara Panchayath Distribution Line 9. Kaduthuruthy Panchayath Distribution Line 10. Kuravilangad Panchayath Distribution Line 11. Construction of 10LL OHSR at Sidhandhikkunnu 12. Providing Water Connection at Kaduthuruthy Panchayath- 5291NoS. 13. Providing Water Connection at Kallara Panchayath- 1169Nos. 14. Expansion of Distribution Line and providing Water Connection after RKI Work of Kuravilangad Panchayath -2167 Nos. 13 6.DESIGN CRITERIA The scheme components are designed with the ultimate demand estimated for the year 2045. The per capita demand is taken as 100 lpcd. The 45 MLD water treatment plant constructed at Mevelloor in Velloor panchayath is the source of the scheme. Water is being drawn from the Moovattupuzha river which is perennial. DESIGN CALCULATION OF 10LL OHSR , 7 LL OHSR, PUMPING MAIN, PUMP & MOTOR Design of clear water pumping main Treatment Plant to Arunnoottimangalam 7LL OHSR Length of Pumping Main 8250 m Ultimate demand 8.50 mld Intermediate demand 8.17 mld Hours of pumping 23.00 hrs Rate of pumping in lps (ultimate) 102.66 lps Diameter required assuming velocity of 1m/s 361.63 mm, Say 400 mm Static Head Inlet level of OHSR at Arunoottimangalam 78.37 m Foot valve level 10.00 m Static Head including 1m residual head 69.37 m Floor level of pump house 13.00 m Suction head - Positive suction 3.00 m Provide 400mm D.I.K-9 pipe is found economical. 14 Design of Pupmset from 45 MLD WTP at Mevelloor toArunoottimagalam OHSR Dia of Pumping main 400 mm Discharge in lps 102.6 Length 8500 Inlet level of OHSR 78.37 Foot valve level 10 Static head 68.37 Frictional head(Hazen williams equation) 13 Say 12 Total head=(Frictinal head+Satic head+Minor losses) 81.37 Say 82 m HP required 160.25 Say 175 Hp Design of Pupmset from Kaduthuruthy Sump to Sidhanthikunnu OHSR Dia of Pumping main 250mm Discharge in lps 35 Length 1200 Inlet level of OHSR 78.15 Foot valve level 28 Static head 50.15 Frictinal head(Hazen williams equation) 3 say 3 Total head=(Frictinal head+Satic head+Minor losses) 53.15 say 55 m Hp required 36.66667 say 40 Hp Design of 7LL OHSR at Arunoottimangalam Population benefitted 84840 Nos Demand 100lpcd*84840 8.4 MLD Wastage 10% 0.84MLD For Industrial, Institutional & fire fighting 10% 0.84MLD 15 Total Demad 10.08 MLD 1 MLD’s of water is required for local supply considering 6 Hour storage. Remaining 9 MLD’s of water required for Thottuva Sump(Kuravilangad) and Kaduthuruthy sump. Total capacity required for the Arunoottimagalam Tank= (107*6/23)+(9*107*1/23) =2.6+3.91=6.5 say 7 Lakhs Design of 10 LL OHSR at Siddanthikunnu Population benefitted 5000*5 25000 Nos Demand 100 lpcd X 25000 2.5 MLD Wastage 10% 0.25MLD For Industrial, Institutional and Firefighting 10% 0.25 MLD Total Demand 3 MLD Capacity of OHSR 1/3rd of 3 MLD 10 LL OHSR proposal for ensuring the drinking water supply rate to 100 lpcd to the inhabitants in the Kaduthuruthy panchayath. The population in this area comes around 25000 Nos. 10% of leakage provision is considered and 10% of domestic demand is added to meet institutional, industrial, and fire fighting demands. Thus the ultimate water demand comes to 3 MLD. 1/3rd storage of the same is taken for design of Tank capacity. Hence 10LL Capacity OHSR is proposed.
Contractor Abu Mathew (Mob: 9447037780)

No project review have been added to this project

Project Progress Status

Project Progress Status

Agreement Details

No Status Updated

Duration & Sanction dates

Date of start of Package 18/05/2023
Scheduled date of Completion as per agreement 19 Apr 2024
Expected date of Completion 19/04/2024

Processing Dates

TS Date 09 Dec 2022
Estimate Approval 19 Feb 2022
NIT Approval 12 Dec 2022
Tender Closing 03 Jan 2023
Technichal Pre-Qualification 02 Jan 2023
Price bid opening 04 Jan 2023

Approval Dates

Workorder Date 14 Mar 2023
NA 20 Apr 2023

Other details

Project Schedule View
Project Components View
Project Officers View

Project Status Updations See All Status Updations

Kaduthuruthy Dn EE
Date: 13/06/2024

Work in progress | 16% Completed

Piravom kaduthuruthy road restoration work, shuttering work at OHSR Kaduthuruthy, 400mm DI laying work at Kaduthuruthy-Piravom road .

Attached images

img

Kaduthuruthy Dn EE
Date: 12/06/2024

Work in progress | 16% Completed

Piravom kaduthuruthy road restoration work,laying 63 mm PVC in ward 7, shuttering work at OHSR Kaduthuruthy .