DW- South Janatha -Replacement of 100 mm AC and 63 mm PVC pipe with 110 mm PVC pipe and 63 mm PVC pipe at South Janatha Road in connection with the construction of culvert under Operation break through.

Project DW- South Janatha -Replacement of 100 mm AC and 63 mm PVC pipe with 110 mm PVC pipe and 63 mm PVC pipe at South Janatha Road in connection with the construction of culvert under Operation break through.
Project Code EKMDEPO11208840
Type Main project
Funding Agency DEPO
Category Deposit Work
Type of scheme Water Supply
Scheme DEPO
Description DW- South Janatha -Replacement of 100 mm AC and 63 mm PVC pipe with 110 mm PVC pipe and 63 mm PVC pipe at South Janatha Road in connection with the construction of culvert under Operation break through.
Status Completed
District Ernakulam
Executing Office Kaloor Sub Dn 2
AS Amount (Rs) 52000
AS Number UTRN No.000166688847
TS Amount (Rs) 52000
TS Number TS/2020-2021/2020/14573
Total Bill Submitted (Rs) 0
Total Bill Paid (Rs) 0
Population Benefitted 13148
Capacity in MLD 0.20
Actual Project Completion Date 20 Sep 2021
Coverage DW- South Janatha -Replacement of 100 mm AC and 63 mm PVC pipe with 110 mm PVC pipe and 63 mm PVC pipe at South Janatha Road in connection with the construction of culvert under Operation break through.
Implementation Schedule Download
Work Plan Download

Packages

No. Project Name Location View
1 DW- South Janatha -Replacement of 100 mm AC and 63 mm PVC pipe with 110 mm PVC pipe and 63 mm PVC pipe at South Janatha Road in connection with the construction of culvert under Operation break through. Kaloor WW Sn1

Overall Project Status

Status Date Overall Project Status Project Officer Contact
07 May 2024 Bill submitted to division Kaloor AE 1
02 May 2024 Bill submitted to division Kaloor AE 1
23 Apr 2024 Bill submitted to division Kaloor AE 1
17 Apr 2024 Bill submitted to division Kaloor AE 1
09 Apr 2024 Bill submitted to division Kaloor AE 1

No project review have been added to this project

Duration & Sanction dates

Date of start of Project 06/09/2021
Scheduled date of Completion of the Project 20 Sep 2021
Expected date of Completion 20/09/2021

Processing Dates

AS Date 17 Nov 2020
TS Date 30 Jan 2021

Other details