Improvements to Water Supply system to TMC and adjoining 3 Panchayath

Project Improvements to Water Supply system to TMC and adjoining 3 Panchayath
Project Code TVMJNNURM09075858
Type Main project
Funding Agency JNNURM
Category Plan plus central
Type of scheme Water Supply
Scheme JNNURM
Description Water supply project WP1 to WP10 and 5 rehabilitation packages
Status On-going
District Thiruvananthapuram
Executing Office Trivandrum Project Dn
AS Amount (Rs) 871600000
AS Number GO(Rt)No.2484/07/LSGD
TS Amount (Rs) 0
TS Number 0.00
Total Bill Submitted (Rs) 0
Total Bill Paid (Rs) 581856392
Population Benefitted 700000
Capacity in MLD 0.00
Actual Project Completion Date 04 Oct 2011
Coverage Vettucaud,Sanghumugham,Thirumala,Thrikkannapuram,Ulloor,Medical college,Akkulam, Pallithura,Kazhakuttom, Sreekaryam, Chempazhanthi, Pappanamcode, Ponnumangalam, Nemom, Melamcode, Estate , Punchakkari, Thiruvallom,Poonkulam wards of Trivandrum Municipal corporation.
Implementation Schedule Download
Work Plan Download

Packages

No. Project Name Location View
1 Improvement to WSS to Thiruvananthapuram Municipal Corporation and adjoining Panchayaths-Supplying,Laying,Testing and Commissioning of DI Distribution line for New Central zone,Thirumala zone ,Low Level zone,Peroorkada zone,Manvila zone and Powdikonam zone-Balnce work at risk and cost of the Contractor-Urgent pipe line work for commissioning the distribution network at Pallithura area Trivandrum Project Dn
2 JNNURM-Improvements to water supply scheme to TMC and adjoining panchayaths - Strengthening Distribution Network-Supplying, Laying, Testing and Commissioning PVC pipe line for Low Level Zone (WP4) JNNURM PIU Dn Thiruvananthapuram
3 JNNURM-Improvements to water supply scheme to TMC and adjoining panchayaths - Strengthening Distribution Network-Supplying, Laying, Testing and Commissioning PVC pipe line for Powdikonam Zone (WP8) JNNURM PIU Dn Thiruvananthapuram
4 JNNURM-Improvements to water supply scheme to TMC and adjoining panchayaths - Strengthening Distribution Network-Supplying, Laying, Testing and Commissioning PVC pipe line for Thiruvallom Zone(WP10) JNNURM PIU Dn Thiruvananthapuram
5 JNNURM-Improvements to water supply scheme to TMC and adjoining panchayaths - Strengthening Distribution Network-Supplying, Laying, Testing and Commissioning PVC pipe line for Vattiyoorkav Zone-WP5 JNNURM PIU Dn Thiruvananthapuram
6 JNNURM-Improvements to WSS to TMC & adjoining panchayaths-Rehabilitation packages 13A JNNURM PIU Dn Thiruvananthapuram
7 JNNURM-Improvements to WSS to TMC & adjoining panchayaths-Rehabilitation packages13C JNNURM PIU Dn Thiruvananthapuram
8 JNNURM-Improvements to WSS to TMC & adjoining panchayaths-Rehabilitation packages 16A JNNURM PIU Dn Thiruvananthapuram
9 JNNURM-Improvements to WSS to TMC & adjoining panchayaths-Rehabilitation packages 16B JNNURM PIU Dn Thiruvananthapuram
10 JNNURM-Improvements to WSS to TMC & adjoining panchayaths-Rehabilitation packages WP12C JNNURM PIU Dn Thiruvananthapuram
11 JNNURM-Improvements to WSS to TMC & adjoining panchayaths-Strengthening Distribution network-Manvila Zone-WP7 JNNURM PIU Dn Thiruvananthapuram
12 JNNURM-Improvements to WSS to TMC & adjoining panchayaths-Strengthening Distribution network-Nemom Zone-WP9 JNNURM PIU Dn Thiruvananthapuram
13 JNNURM-Improvements to WSS to TMC & adjoining panchayaths-Strengthening Distribution network-Thirumala Zone-WP3 JNNURM PIU Dn Thiruvananthapuram
14 JnNURM- Improvement to Thiruvananthapuram Municipal Corporation and adjoining Panchayaths - Supplying, Laying, Testing and Commissioning of DI Distribution line - Balance work at risk and cost of the contractor- Commissioning of the pipe line through Thirumala Puthenkadamukku – Plankalamukku Road Trivandrum Project Dn
15 JnNURM - Improvement to Thiruvananthapuram Municipal Corporation and adjoining Panchayaths - Supplying, Laying, Testing and Commissioning of DI Distribution line - Balance work at risk and cost of the Contractor - Pipe line through Thirumala Puthenkadamukku -Plankalamukku road - Supplying and fitting various sizes of control valves , construction of valve chambers, taking branch connections etc. Trivandrum Project Dn
16 KWA/JNNURM - Improvements to Water Supply Scheme to Thiruvananthapuram Municipal Corporation and adjoining Panchayaths -Supplying, Laying, Jointing,Testing and Commissioning of DI Distribution Network Pipe line for New Central zone, Thirumala zone, Low level zone, Peroorkada zone, Manvila zone, Powdikonam zone, Nemom zone, Thiruvallom zone - WP1 Trivandrum Project Dn
17 KWA/JNNURM - Improvements to Water Supply Scheme to Thiruvananthapuram Municipal Corporation and adjoining Panchayaths - Supplying, Laying, Testing and Commissioning of PVC Distribution network for new central zone-WP2 JNNURM PIU Dn Thiruvananthapuram
18 KWA/JNNURM - Improvements to Water Supply Scheme to Thiruvananthapuram Municipal Corporation and adjoining Panchayaths - Supplying, Laying, Testing and Commissioning of PVC distribution Network for Peroorkada Zone - WP6 JNNURM PIU Dn Thiruvananthapuram

Overall Project Status

Status Date Overall Project Status Project Officer Contact
30 Jun 2023 A special civil application No SCA 17833of 2018 filed by KWA is pending before the Honorable High Court of Gujarat Challenging the Arbitration proceedings by the Sole Arbitrator appointed by Gujarat chamber of Commerce and Industry Company. Meantime the Petitioner M/s Modern Construction Company filed a New application on 25-04-2021, before the GCC for interim relief under sec 17 of the Arbitration and conciliation act,1996 of DP-19 &GCCI ADRC case. Arbitration meeting was held on 8-05-2021 and the Honorable Mr Justice C K Buch (Rtd),Sole Arbitrator passed order that, ”till hearing and disposal of the present application-in the meantime, parties before the tribunal shall maintain status quo-as on date to the execution of contract in question. Hence as per the legal opinion received from CLO , further proceedings on arrangements of balance Work is kept pending until a decision is made. After a series of Arbitral hearings , a proceeding dated 11/2021 was received through e mail on 23-11-2021 and as per this, the interim protection granted has vacated by the Tribunal and stated that the work under contract requires to be completed is in ultimate interest and benefit of large number of people of a city of State of Kerala i.e Thiruvanthapuram. If the status quo granted if continued, and the contract between the parties is treated in existence, it may cause serious prejudice and inconvenience to the people as the work is of laying down water pipeline would remain hanging.Work arranged for the balance Work for Pallithura area under Risk and Cost and work started. Tendered the balance works in Thirumala Thrikkanapuram Road and the work order issued. Termination Order of the Original work WP1 is No.KWA/JNNURM-PIU/WS-27/09/DI dtd 03-03-2020 of the Project Coordinator, JNNURM PIU, Thiruvananthapuram. Construction of valve chambers were completed at Kunnapuzha Jn. and Puthenkadamukku Jn. MS fabrication work on both side of the Trikkannapuram Bridge has been completed. Interconnection works were completed and suitable valve chambers were constructed at Sree hills lane, Jai nagar , Plavila Junction, Plavila Jn (near bank) , Anayidavazhi road, Vaaliyakkattaikkal road,Aramada society road Ani company road, and Aramada park Jn. There is an existing valve chamber at Aramada MLA Jn. So interconnection works were only done there. Work completed and final bill submitted for supplying and fixing valve chambers work. A gap and nonalignment has found between 300mm and 500 mm DI pipe at Plangalamukku during earthwork for valve fixing in commissioning of DI pipeline work. So 300 mm MS pipe was fabricated and joined with 500 mm DI pipe. Construction of valve chamber completed at Plangalamukku and heavy duty covers fixed. Scour valve of 150 mm fixed after Trikkannapuram bridge. Air valve fixed at Puthenkadamukku and Kunnapuzha Jn. Earth leveling completed. Thiruvananthapuram Project AE9
21 Jun 2023 A special civil application No SCA 17833of 2018 filed by KWA is pending before the Honorable High Court of Gujarat Challenging the Arbitration proceedings by the Sole Arbitrator appointed by Gujarat chamber of Commerce and Industry Company. Meantime the Petitioner M/s Modern Construction Company filed a New application on 25-04-2021, before the GCC for interim relief under sec 17 of the Arbitration and conciliation act,1996 of DP-19 &GCCI ADRC case. Arbitration meeting was held on 8-05-2021 and the Honorable Mr Justice C K Buch (Rtd),Sole Arbitrator passed order that, ”till hearing and disposal of the present application-in the meantime, parties before the tribunal shall maintain status quo-as on date to the execution of contract in question. Hence as per the legal opinion received from CLO , further proceedings on arrangements of balance Work is kept pending until a decision is made. After a series of Arbitral hearings , a proceeding dated 11/2021 was received through e mail on 23-11-2021 and as per this, the interim protection granted has vacated by the Tribunal and stated that the work under contract requires to be completed is in ultimate interest and benefit of large number of people of a city of State of Kerala i.e Thiruvanthapuram. If the status quo granted if continued, and the contract between the parties is treated in existence, it may cause serious prejudice and inconvenience to the people as the work is of laying down water pipeline would remain hanging.Work arranged for the balance Work for Pallithura area under Risk and Cost and work started. Tendered the balance works in Thirumala Thrikkanapuram Road and the work order issued. Termination Order of the Original work WP1 is No.KWA/JNNURM-PIU/WS-27/09/DI dtd 03-03-2020 of the Project Coordinator, JNNURM PIU, Thiruvananthapuram. Construction of valve chambers were completed at Kunnapuzha Jn. and Puthenkadamukku Jn. MS fabrication work on both side of the Trikkannapuram Bridge has been completed. Interconnection works were completed and suitable valve chambers were constructed at Sree hills lane, Jai nagar , Plavila Junction, Plavila Jn (near bank) , Anayidavazhi road, Vaaliyakkattaikkal road,Aramada society road Ani company road, and Aramada park Jn. There is an existing valve chamber at Aramada MLA Jn. So interconnection works were only done there. Work completed and final bill submitted for supplying and fixing valve chambers work. A gap and nonalignment has found between 300mm and 500 mm DI pipe at Plangalamukku during earthwork for valve fixing in commissioning of DI pipeline work. So 300 mm MS pipe was fabricated and joined with 500 mm DI pipe. Construction of valve chamber completed at Plangalamukku and heavy duty covers fixed. Scour valve of 150 mm fixed after Trikkannapuram bridge. Air valve fixed at Puthenkadamukku and Kunnapuzha Jn. Earth leveling completed. Thiruvananthapuram Project AE9
16 Jun 2023 A special civil application No SCA 17833of 2018 filed by KWA is pending before the Honorable High Court of Gujarat Challenging the Arbitration proceedings by the Sole Arbitrator appointed by Gujarat chamber of Commerce and Industry Company. Meantime the Petitioner M/s Modern Construction Company filed a New application on 25-04-2021, before the GCC for interim relief under sec 17 of the Arbitration and conciliation act,1996 of DP-19 &GCCI ADRC case. Arbitration meeting was held on 8-05-2021 and the Honorable Mr Justice C K Buch (Rtd),Sole Arbitrator passed order that, ”till hearing and disposal of the present application-in the meantime, parties before the tribunal shall maintain status quo-as on date to the execution of contract in question. Hence as per the legal opinion received from CLO , further proceedings on arrangements of balance Work is kept pending until a decision is made. After a series of Arbitral hearings , a proceeding dated 11/2021 was received through e mail on 23-11-2021 and as per this, the interim protection granted has vacated by the Tribunal and stated that the work under contract requires to be completed is in ultimate interest and benefit of large number of people of a city of State of Kerala i.e Thiruvanthapuram. If the status quo granted if continued, and the contract between the parties is treated in existence, it may cause serious prejudice and inconvenience to the people as the work is of laying down water pipeline would remain hanging.Work arranged for the balance Work for Pallithura area under Risk and Cost and work started. Tendered the balance works in Thirumala Thrikkanapuram Road and the work order issued. Termination Order of the Original work WP1 is No.KWA/JNNURM-PIU/WS-27/09/DI dtd 03-03-2020 of the Project Coordinator, JNNURM PIU, Thiruvananthapuram. Construction of valve chambers were completed at Kunnapuzha Jn. and Puthenkadamukku Jn. MS fabrication work on both side of the Trikkannapuram Bridge has been completed. Interconnection works were completed and suitable valve chambers were constructed at Sree hills lane, Jai nagar , Plavila Junction, Plavila Jn (near bank) , Anayidavazhi road, Vaaliyakkattaikkal road,Aramada society road Ani company road, and Aramada park Jn. There is an existing valve chamber at Aramada MLA Jn. So interconnection works were only done there. Work completed and final bill submitted for supplying and fixing valve chambers work. A gap and nonalignment has found between 300mm and 500 mm DI pipe at Plangalamukku during earthwork for valve fixing in commissioning of DI pipeline work. So 300 mm MS pipe was fabricated and joined with 500 mm DI pipe. Construction of valve chamber completed at Plangalamukku and heavy duty covers fixed. Scour valve of 150 mm fixed after Trikkannapuram bridge. Air valve fixed at Puthenkadamukku and Kunnapuzha Jn. Earth leveling completed Thiruvananthapuram Project AE9
03 Jun 2023 A special civil application No SCA 17833of 2018 filed by KWA is pending before the Honorable High Court of Gujarat Challenging the Arbitration proceedings by the Sole Arbitrator appointed by Gujarat chamber of Commerce and Industry Company. Meantime the Petitioner M/s Modern Construction Company filed a New application on 25-04-2021, before the GCC for interim relief under sec 17 of the Arbitration and conciliation act,1996 of DP-19 &GCCI ADRC case. Arbitration meeting was held on 8-05-2021 and the Honorable Mr Justice C K Buch (Rtd),Sole Arbitrator passed order that, ”till hearing and disposal of the present application-in the meantime, parties before the tribunal shall maintain status quo-as on date to the execution of contract in question. Hence as per the legal opinion received from CLO , further proceedings on arrangements of balance Work is kept pending until a decision is made. After a series of Arbitral hearings , a proceeding dated 11/2021 was received through e mail on 23-11-2021 and as per this, the interim protection granted has vacated by the Tribunal and stated that the work under contract requires to be completed is in ultimate interest and benefit of large number of people of a city of State of Kerala i.e Thiruvanthapuram. If the status quo granted if continued, and the contract between the parties is treated in existence, it may cause serious prejudice and inconvenience to the people as the work is of laying down water pipeline would remain hanging.Work arranged for the balance Work for Pallithura area under Risk and Cost and work started. Tendered the balance works in Thirumala Thrikkanapuram Road and the work order issued. Termination Order of the Original work WP1 is No.KWA/JNNURM-PIU/WS-27/09/DI dtd 03-03-2020 of the Project Coordinator, JNNURM PIU, Thiruvananthapuram. Construction of valve chambers were completed at Kunnapuzha Jn. and Puthenkadamukku Jn. MS fabrication work on both side of the Trikkannapuram Bridge has been completed. Interconnection works were completed and suitable valve chambers were constructed at Sree hills lane, Jai nagar , Plavila Junction, Plavila Jn (near bank) , Anayidavazhi road, Vaaliyakkattaikkal road,Aramada society road Ani company road, and Aramada park Jn. There is an existing valve chamber at Aramada MLA Jn. So interconnection works were only done there. Work completed and final bill submitted for supplying and fixing valve chambers work. A gap and nonalignment has found between 300mm and 500 mm DI pipe at Plangalamukku during earthwork for valve fixing in commissioning of DI pipeline work. So 300 mm MS pipe was fabricated and joined with 500 mm DI pipe. Construction of valve chamber completed at Plangalamukku and heavy duty covers fixed. Scour valve of 150 mm fixed after Trikkannapuram bridge. Air valve fixed at Puthenkadamukku and Kunnapuzha Jn. Earth leveling completed Thiruvananthapuram Project AE9
03 Jun 2023 Pump sets, electrical accessories, pipes and panel boards except Transformers (400NKV,11KV/433V) were supplied by the contractor. The other work can able to be started only after the completion of pump house building. Got TDS approval for the supply of transformer. Thiruvananthapuram Project AE9

No project review have been added to this project

Duration & Sanction dates

Date of start of Project 13/12/2008
Scheduled date of Completion of the Project 04 Oct 2011
Expected date of Completion 31/03/2023

Processing Dates

AS Date 14 Sep 2007
TS Date 05 Sep 2008