| Sl. No. |
Updated On |
Name of Project |
Daily Progress |
Project Layout |
Photo Album |
Scheduled date of completion |
AS Amount (in Lakhs) |
View Project |
| 1 |
|
KIIFB- Design Construction and Commissioning of Water Supply Scheme to Zoological Park-Wild Life Conservation and Research centre at Puthur in Thrissur District (TCRGOK08185295) |
View Progress
|
View Layout |
View Photos
|
31 Aug 2021 |
18382 |
View Project |
| 2 |
|
Comprehensive Water Supply Scheme to Parassala and Adjoining Villages and Marukil Maranalloor villages in Thiruvananthapuram District (TVMGOK09095265) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2021 |
13640 |
View Project |
| 3 |
|
13th finance commission award -Grant for kuttanad development proposal of KWA for completing the clean water transmission main of the kuttanad water supply augmentation scheme (ALPGOK1013621) |
View Progress
|
View Layout |
View Photos
|
30 Nov 2021 |
7000 |
View Project |
| 4 |
|
Alternate source to Thiruvananthapuram Corp - Construction of 120 MLD Water Treatment Plant near Neyyar Dam. (TVMGOK0118688) |
View Progress
|
View Layout |
View Photos
|
28 Feb 2023 |
6000 |
View Project |
| 5 |
|
GIDA - Water Supply Scheme to Elamkunnapuzha, Njarakkal and Nayarambalam Panchayaths (EKMGOK06115971) |
View Progress
|
View Layout |
View Photos
|
31 Aug 2021 |
5685 |
View Project |
| 6 |
|
State Plan 2010-11 - WSS to Erumeli Panchayath (KTMGOK09106017) |
View Progress
|
View Layout |
View Photos
|
30 Sep 2021 |
5300 |
View Project |
| 7 |
|
Interim Augmentation of WSS to Kochi City & adjoining panchayaths (EKMGOK1019473) |
View Progress
|
View Layout |
View Photos
|
26 Jul 2022 |
5000 |
View Project |
| 8 |
|
CWSS to Puramattom, Kalloopara, Ezhumattoor, Kunnamthanam, Eraviperoor, Koipuram,Thottapuzhassery & Panchayaths Phase I (PTAGOK0317605) |
View Progress
|
NA |
View Photos
|
30 Jun 2022 |
4235 |
View Project |
| 9 |
|
State plan-2020-21-water supply scheme to Cheekode and adjoining villages (MLPGOK06202831) |
View Progress
|
NA |
View Photos
|
31 Mar 2022 |
4000 |
View Project |
| 10 |
|
WSS To Payyoli Coastal Area In Kozhikode District (CLTGOK02217579) |
View Progress
|
NA |
View Photos
|
30 Sep 2022 |
3500 |
View Project |
| 11 |
|
Green Book - Providing gravity transmission line from Thekkumkal to Alumkal with available department pipes and providing FHTCs in Ayroor grama Panchayath (PTAGOK03177322) |
View Progress
|
View Layout |
View Photos
|
31 Aug 2021 |
2800 |
View Project |
| 12 |
|
Green book - WSS to Ayroor-Kanjeettukara in Pathanamthitta - Phase-II , Additionalpipe laying work in mookkannoor area (PTAGOK03177321) |
View Progress
|
View Layout |
View Photos
|
30 Sep 2021 |
2800 |
View Project |
| 13 |
|
WSS to Mallappally, Anicadu & Kottangal panchayats - Phase 2 (PTAGOK0317599) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2021 |
2400 |
View Project |
| 14 |
|
State plan 2017-18 WSS to Maradu muncipality strengthening of the distribution system. Maradu Municipality - Various packages (EKMGOK11173885) |
View Progress
|
View Layout |
View Photos
|
31 Oct 2021 |
2316 |
View Project |
| 15 |
|
JNNURM-Improvements to water supply scheme in Thiruvananthapuram Municipal Corporation and adjoining panchayaths-State Plan-2017-18-supplying,laying,testing and commissioning of PVC pipes-balance work for Nemom zone WP9 (Part II) (TVMGOK0317632) |
View Progress
|
View Layout |
View Photos
|
30 Nov 2021 |
2038 |
View Project |
| 16 |
|
State plan -JNNURM-Improvements to WSS to TMC & adjoining panchayaths-State plan(WP2 part1, WP9 part1 ,WP10) (TVMGOK03175978) |
View Progress
|
View Layout |
View Photos
|
30 Sep 2021 |
2038 |
View Project |
| 17 |
|
State Plan Optimisation of Production and Transmission - CWSS to Vandazhi, Kizhakkenchery, Vadakkenchery and Kannambra Panchayaths in Alathur Taluk- Phase- I- Design, Construction, trial running commissioning and maintenance 24.5 MLD Water Treatment Plant & 24.50 LL OHSR, Construction of Substation, Supplying , laying, testing, commissioning and maintenance of Clear Water Pumping Main, Design, supply, erection, commissioning and maintenance of Clear Water pump sets & transformer etc– Phase I - Part I (PKDGOI0918625) |
View Progress
|
View Layout |
View Photos
|
31 Oct 2021 |
2000 |
View Project |
| 18 |
|
STATE PLAN 2018-19-WSS To Kunnummal Panchayath in Kozhikode District-Laying distribution system and construction of OHSR (CLTGOK0818547) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2021 |
1800 |
View Project |
| 19 |
|
CWSS to Anadu,Kurupuzha and Palode Villages-Phase-II (TVMGOK0818664) |
View Progress
|
View Layout |
View Photos
|
03 Jun 2022 |
1600 |
View Project |
| 20 |
|
WSS to Vilappil panchayath-Construction of Intake Well,Supplying and Laying Raw water Pumping main,Construction of WTP and allied works ,Construction of OHSR (TVMGOK0317494) |
View Progress
|
View Layout |
View Photos
|
31 Mar 2022 |
1600 |
View Project |
| 21 |
|
Green Book - 2017-18 - Supplying and laying Distribution network in Venganoor Panchayath of Trivandrum District (TVMGOK0317691) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2021 |
1466 |
View Project |
| 22 |
|
Annual Plan 2018 - 19 - Augmentation of Nemmara, Ayiloor and Melarcode WSS - Phase III - in Chittur and Alathur Taluk - Supply and laying distribution system using DI, GI, PVC pipes of size 200 mm DI K9 to 90mm PVC. (PKDGOK0818986) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2021 |
1460 |
View Project |
| 23 |
|
REHABILITATION IMPROVEMENT WORKS OF UWSS(105)-Improvement ofWSS to Kollam corporation with Kallada river as source at Kadapuzha.(1565) (KLMGOK1014489) |
View Progress
|
NA |
View Photos
|
31 Mar 2022 |
1450 |
View Project |
| 24 |
|
State plan 2008-09-Guruvayoor drainage scheme (TCRGOK03095038) |
View Progress
|
View Layout |
View Photos
|
30 Sep 2021 |
1250 |
View Project |
| 25 |
|
STATE PLAN 2016-17 - Kochi Water Supply Scheme - Shifting pipe line from Edappally to Kaloor under Optimization of Production and Transmission (4215-01-190-97) (EKMGOK03176152) |
View Progress
|
NA |
View Photos
|
31 Dec 2021 |
1250 |
View Project |
| 26 |
|
State Plan 2018-19 WSS to Kavanoor Gramapanchayath -Phase-III- Distribution System SUPPLY LAYING BALANCE DISTRIBUTION OF 130KM 90MM PVC WITH600 Nos Connection replacment (MLPGOK0819588) |
View Progress
|
NA |
View Photos
|
31 Aug 2021 |
1080 |
View Project |
| 27 |
|
Deposit work:-DWSS to Central University-Construction of pump house, laying pumping main,erection of pumpsets,supplying and laying UG cable and construction of compound wall (KGDGOK09164807) |
No Updates
|
NA |
No Updates
|
21 May 2021 |
1050 |
View Project |
| 28 |
|
JICA Assisted Water Supply Scheme -The Supply and Installation of Electromagnetic Flow meters With Central Data Acquisition System (TVMGOK10096056) |
No Updates
|
NA |
No Updates
|
31 Dec 2020 |
1014 |
View Project |
| 29 |
|
STATE PLAN-2016-2017-Modernisation of Aruvikkara Pumping Station (TVMGOK12181907) |
View Progress
|
View Layout |
View Photos
|
08 Dec 2021 |
1000 |
View Project |
| 30 |
|
State plan-Mini WSS to Kodikunnu, Njandoorkonam Division in Thiruvananthapuram Corporation and Adjoining villages (TVMGOK07202431) |
View Progress
|
View Layout |
View Photos
|
20 Jan 2022 |
950 |
View Project |
| 31 |
|
STATE PLAN-2021-2022- Supplying and Commissioning of 2 Nos. of 1600 KVA Indoor Transformers, 1 No of 63 KVA Indoor transformer and 3 Nos. of Suitable HP pumpsets at 12m dia well cum pumphouse and allied works at Peroor (KTMGOK06218032) |
View Progress
|
View Layout |
View Photos
|
28 Feb 2022 |
689 |
View Project |
| 32 |
|
Jalanidhi Phase-2 Bulk water supply scheme to Chorode Grama Panchayath- Rehabilitation of KWA components & allied works - Supply, erection and commissioning of indoor type transformer ( Appendix : B ) (CLTGOK01171959) |
View Progress
|
NA |
View Photos
|
31 Jul 2021 |
679 |
View Project |
| 33 |
|
JJM-Irimbiliyam GP-Providing functional house hold tap connections (FHTC) in Irimbiliyam GramaPanchayath from on going (WSS to Irimbiliyam GP and Valancheri municipality and WSS to Edayur GP) (MLPGOK01171442) |
View Progress
|
NA |
View Photos
|
31 May 2021 |
653 |
View Project |
| 34 |
|
State Plan- 2017-18-WSS to Payyanur Municipality-Balance work- Construction of Intake well cum pump house, supply and erection of raw water pump sets and supply and erection of transformers (KNRGOK1217556) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2021 |
610 |
View Project |
| 35 |
|
State Plan 18-19-UWSS Ottapalam - Replacing old and damaged DL AC/GI 80mm-300mm using 300mm DI-k9 -1250m, 160mm PVC -20290m, 150mm GI - 4020m at various locations (PKDGOK08181659) |
View Progress
|
View Layout |
View Photos
|
31 Aug 2021 |
605 |
View Project |
| 36 |
|
STATE PLAN- 2017-18- UWSS to Aluva - Replacement of old damaged 500/400mm premo pipe with 500mm DI K9 pipe from Pump Junction to Bypass and 100mm AC pipe with 160mm PVC pipe - Premo - 1.46 KM, AC - 4 KM. (EKMGOK05173256) |
View Progress
|
NA |
View Photos
|
31 Oct 2021 |
575 |
View Project |
| 37 |
|
WSS to Pavaratty and Mullassery Panchayaths - Gravity main (TCRGOK1018615) |
View Progress
|
View Layout |
View Photos
|
15 Sep 2021 |
562 |
View Project |
| 38 |
|
STATEPLAN -CWSS to resolve the scarcity of drinking water in various Gramapanchayaths in Malampuzha Constituency in palakkad District -Supplying Laying and commissioning of 700mm DI K9 Raw water main from Malampuzha garden to existing WTP at Malampuzha (PKDGOK11206016) |
View Progress
|
NA |
View Photos
|
27 Nov 2021 |
560 |
View Project |
| 39 |
|
Water supply improvements to Mynagappally- Phase I- S/L clear water 200mm and 300mm DI K9 pumping main from sasthamkottah WTP to ICS OHSR and Public Market OHSR at Mynagappally, Construction of 15.2 LL OHSR at Public Market compound, S/E of 40HP( one stand by) clear water pump and motor , additional power allocation to KSEB, interconnection works at TP site solar and automation charges, road restoration charges and LS provision for demolishing old Anganvadi building and similar works (KLMGOK11194404) |
View Progress
|
View Layout |
View Photos
|
23 May 2022 |
510 |
View Project |
| 40 |
|
Flood Relief Work:2018-WSS to Arayanjilimon ward of Perunadu panchayath (PTAGOK0919609) |
View Progress
|
View Layout |
View Photos
|
31 Mar 2022 |
500 |
View Project |
| 41 |
|
Kasaragod Development Package- Augumentation of WSS to Uppala and adjoining villages (KGDGOK02171355) |
View Progress
|
NA |
View Photos
|
31 May 2022 |
500 |
View Project |
| 42 |
|
Plan Schemes 2017-18 WSS to Ambalavayal by laying distribution line from ARWSS to Krishnagiri, Purakkadi and Ambalavayal Villages. Supplying laying testing and commissioning of 350mm to 150mm DI K9 pipes from Ambalavayal existing GLSR Design and construction of retaining wall compound wall and approch road to the treatment plant at Kacherikunnu. (WYDGOK1217574) |
View Progress
|
View Layout |
View Photos
|
30 Sep 2021 |
500 |
View Project |
| 43 |
|
State Plan 2019 - 2020 TSS - Tertiary Treatment of Sewage at STP Muttathara. (TVMGOK06191797) |
View Progress
|
NA |
View Photos
|
31 Dec 2022 |
500 |
View Project |
| 44 |
|
Green Book-2017-18-Augmentation of RWSS to Aryad Panchayath-Construction of 3.5 LL capacity OHSr at komalapuram and Supplying and Laying of Clear water Pumping main and distribution lines and connected works in Aryad Panchayath (ALPGOK0317486) |
View Progress
|
View Layout |
View Photos
|
31 Aug 2021 |
499 |
View Project |
| 45 |
|
Augmentation of Pavaratty and adjoining panchayaths (TCRGOK1217548) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2021 |
476 |
View Project |
| 46 |
|
UWSS to Adoor & Adj: Panchayaths- Replacement of 300mm AC transmission main and Distribution main from PArakkodu Jn to High School Jn , Adoor in Kayamkulam - Punaloor Road ( KP Road) by using 300mm DIK7 Pipe (PTAGOK12147578) |
View Progress
|
NA |
View Photos
|
31 Dec 2021 |
470 |
View Project |
| 47 |
|
STATE PLAN 2019 - RWSS to Thazhava - Replacement of old and damaged (PM) 200 mm AC 11000 m pipe with 160 mm PVC CL5 (22000m) from Manappally to Aramathumadom AVHS (4850 m), from Manappally to Mullassery Vadimukku jn (3250 m), from Manappally to Pavumba bridge (1800 m), from Pavumba bridge to Palamoodu (1100 m). (KLMGOK06194258) |
View Progress
|
NA |
View Photos
|
31 Oct 2021 |
415 |
View Project |
| 48 |
|
State Plan 2020-21: WSS to Eraviperoor, Koipuram & Thottapuzhasserry (PTAGOK02217323) |
View Progress
|
View Layout |
View Photos
|
30 Nov 2021 |
400 |
View Project |
| 49 |
|
State Plan 2021-22 TSS - D Block - Zone II - Supplying conveying and laying 700 mm dia RCC NP3 pipe sewer Trunk main II from Murinjapalam towards Kannammoola Ch. 342 M to 952 M - land acquisition cost (TVMGOK05217484) |
View Progress
|
View Layout |
View Photos
|
31 Mar 2022 |
381 |
View Project |
| 50 |
|
State Plan 2020-21-Pipe replacement in Peroorkada-Sasthamangalam Road in Thiruvananthapuram. (TVMGOK02217848) |
View Progress
|
NA |
View Photos
|
16 Feb 2022 |
369 |
View Project |
| 51 |
|
RWSS to Vazhappally- Augmentation of water supply to Thuruthy (KTMGOK1116780) |
View Progress
|
NA |
View Photos
|
31 Oct 2021 |
360 |
View Project |
| 52 |
|
State Plan-2020-21-"TSS Laying 300mm dia SW Sewer main line and 250mm&200 mm dia SW pipe sewer branch lines from Kannammoola Ayyankali road proposed common MH towards Padinjattil lane" (TVMGOK09204297) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2021 |
350 |
View Project |
| 53 |
|
Stateplan 2021-22 EMWSS-Remittance of cash deposit and power allocation charges to KSEB for commissioning the 110 KV Substation at H W .aluva. (EKMGOK06217688) |
View Progress
|
NA |
View Photos
|
31 Dec 2021 |
350 |
View Project |
| 54 |
|
WSS to Pavaratty and Mullassery Panchayaths in Chavakkad Taluk of Thrissur District - Construction of 5.50 LL capacity OHSR at Mullassery and 6.70 LL capacity OHSR at Pavaratty panchayath (TCRGOK0818505) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2021 |
350 |
View Project |
| 55 |
|
Stateplan 2021-22 EMWSS - Replacing old damaged existing AC pipes in various wards in Aluva Municipality (EKMGOK06217659) |
View Progress
|
NA |
View Photos
|
31 Dec 2021 |
332 |
View Project |
| 56 |
|
WSS to Perinadu and Athikkayam Villages-Phase I- Remaining components (PTAGOK1217608) |
View Progress
|
View Layout |
View Photos
|
31 Mar 2022 |
331 |
View Project |
| 57 |
|
State Plan 2017-18: Procurement of sewer cleaning machines and safety equipments for sewer maintenanace (Auto mounted desilting machine-3no,medium vehicle mounted high pressure jetting machine-2No, heavy vehicle mounted high pressure jetting cum sucking machine 1No, vacuum operated suction machine-1No, self priming potable diesel dewatering pump set 4No, safety equipments for labourers-15set, other safety equipments-9set. (TVMGOK12171750) |
View Progress
|
View Layout |
View Photos
|
17 Aug 2022 |
317 |
View Project |
| 58 |
|
STATE PLAN 2018-19-EMWSS-Supply, Erection, Testing and commissioning of110 KV additional bay with consumer structure and metering units including construction of additional yard and allied works for the commissioning of 110KV substation at Head works Aluva including rehabilation of substation building (EKMGOK0818769) |
View Progress
|
View Layout |
View Photos
|
18 Feb 2022 |
315 |
View Project |
| 59 |
|
KIIFB - Budget work 2016-17 of PWD - Pipe line replacement due to PWD road widening work from Akkikavu to Mukkilpeedika Junction in Akkikavu Erumapetty road at Kadavallur Panchayath (TCRGOK09194958) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2021 |
300 |
View Project |
| 60 |
|
State Plan 17-18-CWSS to Anakkara & Pattithara- Replacing the old and damaged 100/80mm AC with 110 mm PVC from Kokkad to Othallur-20000m (PKDGOK07171741) |
View Progress
|
View Layout |
View Photos
|
31 Aug 2021 |
300 |
View Project |
| 61 |
|
State Plan 2018-19-CWSS to Anakkara, Pattithara and Kappur Panchayaths - Replacing old and damaged DM AC-150mm,100mm & 80mm, PVC – 63mm,50mm using DI-K9 – 250mm-1545, 200mm -2060, PVC 160mm- 20, 140mm -1200, 110mm -90, 90mm -1040, 150mm GI-6, 125mm GI-120, 100mm GI -18, 80mm GI -114 (Total 6213m) Mukkotta jn to Chirattakkunnu, Kumbidi High school to Union shed Road of Anakkara panchayath. (PKDGOK08181657) |
View Progress
|
View Layout |
View Photos
|
31 Aug 2021 |
300 |
View Project |
| 62 |
|
State Plan- 2018 -19 KGWSS- Replacing old 250 mm AC pipe with 400 mm DI pipe from Veterinary jn to Kunnamkulam Sn office (TCRGOK08186060) |
View Progress
|
NA |
View Photos
|
31 Dec 2021 |
300 |
View Project |
| 63 |
|
State plan 2018 - 19 - TWSS - Replacing damaged Filter Media for 36 MLD water Treatment plant (TCRGOK04195081) |
View Progress
|
NA |
View Photos
|
31 Dec 2021 |
300 |
View Project |
| 64 |
|
State Plan 2020-21 - "Source improvement of Sasthamcotta water treatment plant" - Construction of recycling plant at Sasthamcotta in Kollam District. (KLMGOK04206064) |
View Progress
|
View Layout |
View Photos
|
31 Oct 2021 |
262 |
View Project |
| 65 |
|
State plan 2020-21 Optimization of production and Transmission-Central region-Replacement of old pipe- CWSS to Kadungalloor and Alangad panchayaths- Replacing worst affected AC Pumping main from treatment plant at Muppathadam to Manjali Kunnumpuram with 250 mm DI K(9) pipe. (EKMGOK12206044) |
No Updates
|
View Layout |
No Updates
|
31 Oct 2021 |
260 |
View Project |
| 66 |
|
STATE PLAN 2018-19 - Optimization Production and Transmission-WSS to Kumaranalloore.Replacing Old and damaged 300 mm AC gravity main from OHSR at Incherikunnuto OHSRat S H mount using 300 mm DI K9 Pipe (KTMGOK08181188) |
View Progress
|
View Layout |
View Photos
|
31 Aug 2021 |
253 |
View Project |
| 67 |
|
KWA- Flood related work 2018 -work under SDRF and State plan -Replacing old&damaged (frequently bursting after flood ) 250mm ACpumping cum distribution pipe with 300mm DIpipe -new proposal through new NH from Thiniyakavu to valluvally in Kottuvally Panchayath -Unique -ID007- WSK -M-020 (EKMGOK01193744) |
No Updates
|
View Layout |
No Updates
|
31 Jan 2022 |
240 |
View Project |
| 68 |
|
WSS to Anjarakandy-Peralassery and adjoining panchayaths- Replacement of old AC main distribution pipes of 350mm,250mm and 200mm dia from GLSR Kundurmala in Eranholi Panchayath with DI K9 pipes. (KNRGOK06217765) |
View Progress
|
NA |
View Photos
|
31 Mar 2022 |
222 |
View Project |
| 69 |
|
STATE PLAN 2016-17 - ARWSS TO LALAM VALLICHIRA - LAYING 200mm DI PUMPING MAIN FROM KADAPATTOOR TO NELLIYANI GL TANK . (KTMGOK02175028) |
View Progress
|
View Layout |
View Photos
|
31 Oct 2021 |
218 |
View Project |
| 70 |
|
State Plan 2019-20-RWSS to Vaniyamkulam in Vaniyamkulam Grama panchayath - Replacing old and damaged 200 mm AC Class 10 Gravity Main with 350mm DI K9 pipe from 20.50 LL capacity OHSR Kulappully to Koonathara Sump-3200m (PKDGOK06191509) |
View Progress
|
View Layout |
View Photos
|
31 Aug 2021 |
216 |
View Project |
| 71 |
|
State plan 2017-2018-CWSS to Vandazhy, Vadakkenchery,Kizhakkenchery and Kannambra Panchayaths in Alathur Thaluk-Phase-I (Part II)-Supply and errection of raw water pumpsets,supplying and laying of rawwater pumping main (600mm DI K9) (PKDGOK12176050) |
View Progress
|
View Layout |
View Photos
|
31 Oct 2021 |
200 |
View Project |
| 72 |
|
State Plan 2019-20. Replacing damaged 300mm AC Gravity pipe with 300mm DI pipe from the RCC Weir at Kandappan Chalil Natural source to Narangathodu Tank in Kodenchery Grama Panchayath. (CLTGOK0619884) |
No Updates
|
NA |
No Updates
|
31 Dec 2021 |
200 |
View Project |
| 73 |
|
State Plan 2018-2019- ARWSS to Thirunelly- Replacement of old and damaged 100 mm GI pumping main using 150 mm DI pipes from clear water sump at Karthikulam to GLSR Anappara (WYDGOK08182517) |
View Progress
|
View Layout |
View Photos
|
31 May 2021 |
188 |
View Project |
| 74 |
|
Deposit Work-2020-21-KWA Medical college (TVMGOK08206041) |
View Progress
|
View Layout |
View Photos
|
08 Feb 2022 |
184 |
View Project |
| 75 |
|
State plan 2021-22 optimisation of production and transmission - renovation of WTP and energy conservation-WSS to Palakkad renovation of 9MLD and 12.5MLD WTP (PKDGOK06217565) |
View Progress
|
NA |
View Photos
|
31 Mar 2022 |
181 |
View Project |
| 76 |
|
State Plan-Improvements to the existing WSS to Chavakkad Muncipality - strengthening of distribution network replacing existing 350 mm AC gravity line 1500 m with 350 mm DI K9 (TCRGOK12171785) |
View Progress
|
NA |
View Photos
|
31 Oct 2021 |
180 |
View Project |
| 77 |
|
State Plan 2021-22 TSS- E Block Zone II - Laying 630mm dia HDPE pipe sewer main from Edapazhanji to Chithra nagar first reach- Ch 1841 m to 2133 m (TVMGOK05217499) |
View Progress
|
NA |
View Photos
|
31 Mar 2022 |
165 |
View Project |
| 78 |
|
State Plan - 2020-21-TSS- E- Block Zone II -Laying 700mm dia RCC NP3 pipe sewer main from Jagathy towards common manhole Ch.512m to 785m & Interconnection of 700mm dia DI pipe between Jagathy Chadiyara sewer main and parallel main across Killi river and constructing 450mm dia board cast in situ piles inside of river and connected works.Ch.649m to 679m. (TVMGOK10206732) |
View Progress
|
NA |
View Photos
|
31 Dec 2021 |
163 |
View Project |
| 79 |
|
State Plan 2021-22- Optimization of Production and Transmission -Pipe line extension-RWSS to Kumaramangalam -Providing distribution lines in various wards of Kumaramangalam Panchayath (IDKGOK06217640) |
View Progress
|
NA |
View Photos
|
31 Dec 2021 |
161 |
View Project |
| 80 |
|
2018-19- OPTIMISATION OF PRODUCTION AND TRANSMISSION: RENOVATION OF WTP- UWSS to Perinthalmanna - Dedicated KSEB power line to Water Treatment Plant at Cherukara (MLPGOK08181914) |
No Updates
|
NA |
No Updates
|
30 Oct 2021 |
160 |
View Project |
| 81 |
|
State Plan 2018 - 2019 TSS Plan - 30 - Construction of well and Grit Chamber with Supplying and Installing 3 No's submersible Pump set etc. at Thaliyal Pump House. (TVMGOK02191783) |
View Progress
|
View Layout |
View Photos
|
30 Sep 2021 |
160 |
View Project |
| 82 |
|
State plan 2021-22-Optimization of production and Transmission - Replacement of old pipes in existing WSS - Replacing damaged 250mm PVC from Eranhippalam junction to Arayadathupalam junction along mini bypass road for a length of 3000m. (CLTGOK06217954) |
No Updates
|
NA |
No Updates
|
Date is not specified |
151 |
View Project |
| 83 |
|
State plan 2018-19-WSS Akalakunnam, Mutholi &Kozhuvanal- Supply and erection of Raw water & Clear Water Pump set for new scheme (KTMGOK0818606) |
View Progress
|
View Layout |
View Photos
|
15 Sep 2021 |
150 |
View Project |
| 84 |
|
STATE PLAN 2021-22 - WSS to Pattuvam and adjoing Villages- Anthoor Municipality- Replacing the existing 110mm line with 450mm,400mm and 300mm DI in Dharmasala (KNRGOK06217784) |
View Progress
|
NA |
View Photos
|
31 Dec 2021 |
150 |
View Project |
| 85 |
|
STATE PLAN 2021-22 - TWSS- Raising the road towards Podiyakkala in connection with raising the water level of Peppara dam (TVMGOK06217753) |
View Progress
|
NA |
View Photos
|
31 Dec 2021 |
141 |
View Project |
| 86 |
|
State plan 2021-22 Optimization of Production and Transmission Replacement of old pipes in Existing WSS - WSS to Puthencruz Replacement of damaged 250 mm AC pipe with 300 mm DI K9 from Choondy to Meempara in Poothrikka panchayath (EKMGOK06197691) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2021 |
140 |
View Project |
| 87 |
|
State Plan-2019-20 UWSS to Piravom and Adj Panchayaths-Replacing old and damaged 80mm GI pipe with 150 mm DI K9 pipe from Kalanimattam to Koorumala (2850 m) (EKMGOK06191363) |
View Progress
|
NA |
View Photos
|
30 Nov 2021 |
140 |
View Project |
| 88 |
|
State plan 2020-21 Optimization of production and Transmission-Central region-Replacement of old pipe- CWSS to Kadungalloor , Karumaloor and Alangad Panchayaths- Replacing the worst affected 250 mm AC Pumping main from Muppathadam water treatment plant to Alangad OH tank with 300 mm DI(K9) pipe. (EKMGOK12206045) |
No Updates
|
View Layout |
No Updates
|
30 Sep 2021 |
140 |
View Project |
| 89 |
|
State Plan 2018-19-UWSS to Marthakakra Census Town -Laying Gap Connection and Replacing AC Pipe and Commissioning Distribution network (TCRGOK06181249) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2021 |
135 |
View Project |
| 90 |
|
STATE PLAN PHASE IV IMPROVEMENTS OF EXISTING SUBSTAION BY PROVIDING STAND BY TRANSFORMER FACILITY 400 KVA WITH YARD EXPANSION WORK AT WTP COMPOUND MEDICAL COLLEGE KOTTAYAM (KTMGOK12197708) |
View Progress
|
NA |
View Photos
|
31 Dec 2021 |
133 |
View Project |
| 91 |
|
STATE PLAN 20.-21- Improvements to RWSS to Manjeri-Water Supply to Veettikunnu area -Phase 2- Providing Distribution Line in Ward No.28,29,30&32 of Manjeri Municipality (MLPGOK10204653) |
View Progress
|
NA |
View Photos
|
30 Dec 2021 |
132 |
View Project |
| 92 |
|
State Plan (2018-2019 )- RWSS to Nooranad-Replacing of old damaged AC pipe line from Edapon towards Para Jn with 160 mm (6 kg/cm2 ) PVC pipe line (ALPGOK04181399) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2021 |
131 |
View Project |
| 93 |
|
State Plan 2021-22- Improvement works of water supply scheme to Shornur Municipality- Replacement of 500mm CI pumping main with 500mm DI K9 pipe from raw water pump house to Railway over bridge (Reach 1) (PKDGOK06217867) |
View Progress
|
NA |
View Photos
|
Date is not specified |
127 |
View Project |
| 94 |
|
State Plan 2021-22 TSS - D Block - Zone II - Supplying Conveying and Laying 700mm dia RCC NP3 pipe sewer trunk main II from Murinjapalam to Kannamoola - Ch 0 to 342m (TVMGOK05217477) |
View Progress
|
NA |
View Photos
|
31 Mar 2022 |
126 |
View Project |
| 95 |
|
Stateplan-2019-20-Optimisation and production and transmission-WSS to Thalassery Municipality-Morakkunnu zone-Replacing old distribution pipes along Thalassery-Kodiyeri PWD road using PVC pipes for utility shifting of workReplacement of pipes- (KNRGOK11191776) |
View Progress
|
NA |
View Photos
|
31 Dec 2021 |
125 |
View Project |
| 96 |
|
RWSS to Kottakkal Parappur replacing old damaged 200 mm AC distribution main with 200 mm DI K9 pipe at Kurbani junction in Kottakkal Municipality (MLPGOK06211689) |
View Progress
|
NA |
View Photos
|
30 Sep 2021 |
118 |
View Project |
| 97 |
|
State Plan-2020-21-Thalassery Water Supply Scheme and WSS to Mahe region - Supply and erection of 300HP VT Pumpset-2Nos at Keezhallur pumphouse. (KNRGOK10205131) |
View Progress
|
NA |
View Photos
|
30 Nov 2021 |
115 |
View Project |
| 98 |
|
State Plan-2020-21-TSS - Providing and laying 300mm dia main and 200mm SW branch sewer line towards Sreekrishna Nagar infront of Jagathy School in Jagathy Kochar Road (TVMGOK10204314) |
View Progress
|
NA |
View Photos
|
31 Dec 2021 |
113 |
View Project |
| 99 |
|
State Plan 2021-22 - TSS -Zone II - Laying 600mm dia RCC NP3 pipe sewer main towards Edapazhanji Chithra nagar (IV th reach ) Chainage 2738 m to 2908 m in connection with the commissioning of Jagathy -Koottamvila scheme- land acquisition cost (TVMGOK05217476) |
View Progress
|
View Layout |
View Photos
|
31 Mar 2022 |
112 |
View Project |
| 100 |
|
State Plan 2018-19-CWSS to Amboori-replacing old damaged 200mm AC line using 200mm AC class distribution main with 200mm DI k9 pipe from Kallimoodu to Killiyoor in Vellarda Panchayth (TVMGOK08182100) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2021 |
111 |
View Project |
| 101 |
|
State Plan 2019-20 : EMWSS - Replacing old and damaged (DM) 200 mm CI with 250 mm DI K9 pipe along Kaloor Jn. Puthiya road Jn. Perandoor /LFC road (710m). (EKMGOK06192631) |
View Progress
|
View Layout |
View Photos
|
30 Sep 2021 |
109 |
View Project |
| 102 |
|
Optimisation of Production and Transmission-Replacement of Old pipes in Existing WSS 2019-20 1 RWSS to Kumaliy-Replacing old and damaged 80,50,40 mm distribution main (7500m) GI with 80 mm,50 mm,40 mm (7500m ) at Rosapookandam (IDKGOK06195927) |
No Updates
|
NA |
No Updates
|
15 Mar 2022 |
106 |
View Project |
| 103 |
|
State Plan 30 - 2018-19 - TSS- Rehabilitation of Exisitng Sewerline near Thaliyal Pump house to avoid sewage overflow to Killi river (TVMGOK02194473) |
View Progress
|
NA |
View Photos
|
31 Dec 2021 |
103 |
View Project |
| 104 |
|
STATE PLAN 2016-17 RWSS Pudussery shiftins distribution main passing through RLY coach factory 160 mm pvc (PKDGOK02171014) |
View Progress
|
View Layout |
View Photos
|
31 Oct 2021 |
100 |
View Project |
| 105 |
|
State Plan 2018-19- ARWSS to Vorkady & adjoining Panchayaths- Renovation of vented weir across Uppala river at Anakallu (KGDGOK08181372) |
View Progress
|
NA |
View Photos
|
31 May 2022 |
100 |
View Project |
| 106 |
|
State Plan 2019-20- RWSS to Kanhangad-replacing old damaged 200 mm Ac distribution main with 200 mm DI K9 pipe(2850m) from Ambalathungara to Chemmattam vayal. (KGDGOK06191375) |
No Updates
|
View Layout |
No Updates
|
31 Oct 2021 |
100 |
View Project |
| 107 |
|
State Plan 2020-21-WSS TO Edakad Zone I-Replacement of old damaged 140/110 mmPVC pipeline from Chala temple to Nambolankunnu in Chala Padinharekkara Road (KNRGOK12205888) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2021 |
100 |
View Project |
| 108 |
|
STATE PLAN 20.-21- ARWSS to Wandoor-Replacing old AC 150/125 mm distribution main - 4000m with 140/160 mm PVC along Kalikavu-and Nilambur Road under PH Section Wandoor. (MLPGOK10204656) |
View Progress
|
NA |
View Photos
|
30 Dec 2021 |
100 |
View Project |