Sl. No. Updated On Name of Project Daily Progress Project Layout Photo Album Scheduled date of completion AS Amount (in Lakhs) View Project
1
M T W T F S S
KIIFB- Design Construction and Commissioning of Water Supply Scheme to Zoological Park-Wild Life Conservation and Research centre at Puthur in Thrissur District (TCRGOK08185295) View Progress View Layout View Photos 31 Aug 2021 18382 View Project
2
M T W T F S S
Comprehensive Water Supply Scheme to Parassala and Adjoining Villages and Marukil Maranalloor villages in Thiruvananthapuram District (TVMGOK09095265) View Progress View Layout View Photos 31 Dec 2021 13640 View Project
3
M T W T F S S
13th finance commission award -Grant for kuttanad development proposal of KWA for completing the clean water transmission main of the kuttanad water supply augmentation scheme (ALPGOK1013621) View Progress View Layout View Photos 30 Nov 2021 7000 View Project
4
M T W T F S S
Alternate source to Thiruvananthapuram Corp - Construction of 120 MLD Water Treatment Plant near Neyyar Dam. (TVMGOK0118688) View Progress View Layout View Photos 28 Feb 2023 6000 View Project
5
M T W T F S S
GIDA - Water Supply Scheme to Elamkunnapuzha, Njarakkal and Nayarambalam Panchayaths (EKMGOK06115971) View Progress View Layout View Photos 31 Aug 2021 5685 View Project
6
M T W T F S S
State Plan 2010-11 - WSS to Erumeli Panchayath (KTMGOK09106017) View Progress View Layout View Photos 30 Sep 2021 5300 View Project
7
M T W T F S S
Interim Augmentation of WSS to Kochi City & adjoining panchayaths (EKMGOK1019473) View Progress View Layout View Photos 26 Jul 2022 5000 View Project
8
M T W T F S S
CWSS to Puramattom, Kalloopara, Ezhumattoor, Kunnamthanam, Eraviperoor, Koipuram,Thottapuzhassery & Panchayaths Phase I (PTAGOK0317605) View Progress NA View Photos 30 Jun 2022 4235 View Project
9
M T W T F S S
State plan-2020-21-water supply scheme to Cheekode and adjoining villages (MLPGOK06202831) View Progress NA View Photos 31 Mar 2022 4000 View Project
10
M T W T F S S
WSS To Payyoli Coastal Area In Kozhikode District (CLTGOK02217579) View Progress NA View Photos 30 Sep 2022 3500 View Project
11
M T W T F S S
Green Book - Providing gravity transmission line from Thekkumkal to Alumkal with available department pipes and providing FHTCs in Ayroor grama Panchayath (PTAGOK03177322) View Progress View Layout View Photos 31 Aug 2021 2800 View Project
12
M T W T F S S
Green book - WSS to Ayroor-Kanjeettukara in Pathanamthitta - Phase-II , Additionalpipe laying work in mookkannoor area (PTAGOK03177321) View Progress View Layout View Photos 30 Sep 2021 2800 View Project
13
M T W T F S S
WSS to Mallappally, Anicadu & Kottangal panchayats - Phase 2 (PTAGOK0317599) View Progress View Layout View Photos 31 Dec 2021 2400 View Project
14
M T W T F S S
State plan 2017-18 WSS to Maradu muncipality strengthening of the distribution system. Maradu Municipality - Various packages (EKMGOK11173885) View Progress View Layout View Photos 31 Oct 2021 2316 View Project
15
M T W T F S S
JNNURM-Improvements to water supply scheme in Thiruvananthapuram Municipal Corporation and adjoining panchayaths-State Plan-2017-18-supplying,laying,testing and commissioning of PVC pipes-balance work for Nemom zone WP9 (Part II) (TVMGOK0317632) View Progress View Layout View Photos 30 Nov 2021 2038 View Project
16
M T W T F S S
State plan -JNNURM-Improvements to WSS to TMC & adjoining panchayaths-State plan(WP2 part1, WP9 part1 ,WP10) (TVMGOK03175978) View Progress View Layout View Photos 30 Sep 2021 2038 View Project
17
M T W T F S S
State Plan Optimisation of Production and Transmission - CWSS to Vandazhi, Kizhakkenchery, Vadakkenchery and Kannambra Panchayaths in Alathur Taluk- Phase- I- Design, Construction, trial running commissioning and maintenance 24.5 MLD Water Treatment Plant & 24.50 LL OHSR, Construction of Substation, Supplying , laying, testing, commissioning and maintenance of Clear Water Pumping Main, Design, supply, erection, commissioning and maintenance of Clear Water pump sets & transformer etc– Phase I - Part I (PKDGOI0918625) View Progress View Layout View Photos 31 Oct 2021 2000 View Project
18
M T W T F S S
STATE PLAN 2018-19-WSS To Kunnummal Panchayath in Kozhikode District-Laying distribution system and construction of OHSR (CLTGOK0818547) View Progress View Layout View Photos 31 Dec 2021 1800 View Project
19
M T W T F S S
CWSS to Anadu,Kurupuzha and Palode Villages-Phase-II (TVMGOK0818664) View Progress View Layout View Photos 03 Jun 2022 1600 View Project
20
M T W T F S S
WSS to Vilappil panchayath-Construction of Intake Well,Supplying and Laying Raw water Pumping main,Construction of WTP and allied works ,Construction of OHSR (TVMGOK0317494) View Progress View Layout View Photos 31 Mar 2022 1600 View Project
21
M T W T F S S
Green Book - 2017-18 - Supplying and laying Distribution network in Venganoor Panchayath of Trivandrum District (TVMGOK0317691) View Progress View Layout View Photos 31 Dec 2021 1466 View Project
22
M T W T F S S
Annual Plan 2018 - 19 - Augmentation of Nemmara, Ayiloor and Melarcode WSS - Phase III - in Chittur and Alathur Taluk - Supply and laying distribution system using DI, GI, PVC pipes of size 200 mm DI K9 to 90mm PVC. (PKDGOK0818986) View Progress View Layout View Photos 31 Dec 2021 1460 View Project
23
M T W T F S S
REHABILITATION IMPROVEMENT WORKS OF UWSS(105)-Improvement ofWSS to Kollam corporation with Kallada river as source at Kadapuzha.(1565) (KLMGOK1014489) View Progress NA View Photos 31 Mar 2022 1450 View Project
24
M T W T F S S
State plan 2008-09-Guruvayoor drainage scheme (TCRGOK03095038) View Progress View Layout View Photos 30 Sep 2021 1250 View Project
25
M T W T F S S
STATE PLAN 2016-17 - Kochi Water Supply Scheme - Shifting pipe line from Edappally to Kaloor under Optimization of Production and Transmission (4215-01-190-97) (EKMGOK03176152) View Progress NA View Photos 31 Dec 2021 1250 View Project
26
M T W T F S S
State Plan 2018-19 WSS to Kavanoor Gramapanchayath -Phase-III- Distribution System SUPPLY LAYING BALANCE DISTRIBUTION OF 130KM 90MM PVC WITH600 Nos Connection replacment (MLPGOK0819588) View Progress NA View Photos 31 Aug 2021 1080 View Project
27
M T W T F S S
Deposit work:-DWSS to Central University-Construction of pump house, laying pumping main,erection of pumpsets,supplying and laying UG cable and construction of compound wall (KGDGOK09164807) No Updates NA No Updates 21 May 2021 1050 View Project
28
M T W T F S S
JICA Assisted Water Supply Scheme -The Supply and Installation of Electromagnetic Flow meters With Central Data Acquisition System (TVMGOK10096056) No Updates NA No Updates 31 Dec 2020 1014 View Project
29
M T W T F S S
STATE PLAN-2016-2017-Modernisation of Aruvikkara Pumping Station (TVMGOK12181907) View Progress View Layout View Photos 08 Dec 2021 1000 View Project
30
M T W T F S S
State plan-Mini WSS to Kodikunnu, Njandoorkonam Division in Thiruvananthapuram Corporation and Adjoining villages (TVMGOK07202431) View Progress View Layout View Photos 20 Jan 2022 950 View Project
31
M T W T F S S
STATE PLAN-2021-2022- Supplying and Commissioning of 2 Nos. of 1600 KVA Indoor Transformers, 1 No of 63 KVA Indoor transformer and 3 Nos. of Suitable HP pumpsets at 12m dia well cum pumphouse and allied works at Peroor (KTMGOK06218032) View Progress View Layout View Photos 28 Feb 2022 689 View Project
32
M T W T F S S
Jalanidhi Phase-2 Bulk water supply scheme to Chorode Grama Panchayath- Rehabilitation of KWA components & allied works - Supply, erection and commissioning of indoor type transformer ( Appendix : B ) (CLTGOK01171959) View Progress NA View Photos 31 Jul 2021 679 View Project
33
M T W T F S S
JJM-Irimbiliyam GP-Providing functional house hold tap connections (FHTC) in Irimbiliyam GramaPanchayath from on going (WSS to Irimbiliyam GP and Valancheri municipality and WSS to Edayur GP) (MLPGOK01171442) View Progress NA View Photos 31 May 2021 653 View Project
34
M T W T F S S
State Plan- 2017-18-WSS to Payyanur Municipality-Balance work- Construction of Intake well cum pump house, supply and erection of raw water pump sets and supply and erection of transformers (KNRGOK1217556) View Progress View Layout View Photos 31 Dec 2021 610 View Project
35
M T W T F S S
State Plan 18-19-UWSS Ottapalam - Replacing old and damaged DL AC/GI 80mm-300mm using 300mm DI-k9 -1250m, 160mm PVC -20290m, 150mm GI - 4020m at various locations (PKDGOK08181659) View Progress View Layout View Photos 31 Aug 2021 605 View Project
36
M T W T F S S
STATE PLAN- 2017-18- UWSS to Aluva - Replacement of old damaged 500/400mm premo pipe with 500mm DI K9 pipe from Pump Junction to Bypass and 100mm AC pipe with 160mm PVC pipe - Premo - 1.46 KM, AC - 4 KM. (EKMGOK05173256) View Progress NA View Photos 31 Oct 2021 575 View Project
37
M T W T F S S
WSS to Pavaratty and Mullassery Panchayaths - Gravity main (TCRGOK1018615) View Progress View Layout View Photos 15 Sep 2021 562 View Project
38
M T W T F S S
STATEPLAN -CWSS to resolve the scarcity of drinking water in various Gramapanchayaths in Malampuzha Constituency in palakkad District -Supplying Laying and commissioning of 700mm DI K9 Raw water main from Malampuzha garden to existing WTP at Malampuzha (PKDGOK11206016) View Progress NA View Photos 27 Nov 2021 560 View Project
39
M T W T F S S
Water supply improvements to Mynagappally- Phase I- S/L clear water 200mm and 300mm DI K9 pumping main from sasthamkottah WTP to ICS OHSR and Public Market OHSR at Mynagappally, Construction of 15.2 LL OHSR at Public Market compound, S/E of 40HP( one stand by) clear water pump and motor , additional power allocation to KSEB, interconnection works at TP site solar and automation charges, road restoration charges and LS provision for demolishing old Anganvadi building and similar works (KLMGOK11194404) View Progress View Layout View Photos 23 May 2022 510 View Project
40
M T W T F S S
Flood Relief Work:2018-WSS to Arayanjilimon ward of Perunadu panchayath (PTAGOK0919609) View Progress View Layout View Photos 31 Mar 2022 500 View Project
41
M T W T F S S
Kasaragod Development Package- Augumentation of WSS to Uppala and adjoining villages (KGDGOK02171355) View Progress NA View Photos 31 May 2022 500 View Project
42
M T W T F S S
Plan Schemes 2017-18 WSS to Ambalavayal by laying distribution line from ARWSS to Krishnagiri, Purakkadi and Ambalavayal Villages. Supplying laying testing and commissioning of 350mm to 150mm DI K9 pipes from Ambalavayal existing GLSR Design and construction of retaining wall compound wall and approch road to the treatment plant at Kacherikunnu. (WYDGOK1217574) View Progress View Layout View Photos 30 Sep 2021 500 View Project
43
M T W T F S S
State Plan 2019 - 2020 TSS - Tertiary Treatment of Sewage at STP Muttathara. (TVMGOK06191797) View Progress NA View Photos 31 Dec 2022 500 View Project
44
M T W T F S S
Green Book-2017-18-Augmentation of RWSS to Aryad Panchayath-Construction of 3.5 LL capacity OHSr at komalapuram and Supplying and Laying of Clear water Pumping main and distribution lines and connected works in Aryad Panchayath (ALPGOK0317486) View Progress View Layout View Photos 31 Aug 2021 499 View Project
45
M T W T F S S
Augmentation of Pavaratty and adjoining panchayaths (TCRGOK1217548) View Progress View Layout View Photos 31 Dec 2021 476 View Project
46
M T W T F S S
UWSS to Adoor & Adj: Panchayaths- Replacement of 300mm AC transmission main and Distribution main from PArakkodu Jn to High School Jn , Adoor in Kayamkulam - Punaloor Road ( KP Road) by using 300mm DIK7 Pipe (PTAGOK12147578) View Progress NA View Photos 31 Dec 2021 470 View Project
47
M T W T F S S
STATE PLAN 2019 - RWSS to Thazhava - Replacement of old and damaged (PM) 200 mm AC 11000 m pipe with 160 mm PVC CL5 (22000m) from Manappally to Aramathumadom AVHS (4850 m), from Manappally to Mullassery Vadimukku jn (3250 m), from Manappally to Pavumba bridge (1800 m), from Pavumba bridge to Palamoodu (1100 m). (KLMGOK06194258) View Progress NA View Photos 31 Oct 2021 415 View Project
48
M T W T F S S
State Plan 2020-21: WSS to Eraviperoor, Koipuram & Thottapuzhasserry (PTAGOK02217323) View Progress View Layout View Photos 30 Nov 2021 400 View Project
49
M T W T F S S
State Plan 2021-22 TSS - D Block - Zone II - Supplying conveying and laying 700 mm dia RCC NP3 pipe sewer Trunk main II from Murinjapalam towards Kannammoola Ch. 342 M to 952 M - land acquisition cost (TVMGOK05217484) View Progress View Layout View Photos 31 Mar 2022 381 View Project
50
M T W T F S S
State Plan 2020-21-Pipe replacement in Peroorkada-Sasthamangalam Road in Thiruvananthapuram. (TVMGOK02217848) View Progress NA View Photos 16 Feb 2022 369 View Project
51
M T W T F S S
RWSS to Vazhappally- Augmentation of water supply to Thuruthy (KTMGOK1116780) View Progress NA View Photos 31 Oct 2021 360 View Project
52
M T W T F S S
State Plan-2020-21-"TSS Laying 300mm dia SW Sewer main line and 250mm&200 mm dia SW pipe sewer branch lines from Kannammoola Ayyankali road proposed common MH towards Padinjattil lane" (TVMGOK09204297) View Progress View Layout View Photos 31 Dec 2021 350 View Project
53
M T W T F S S
Stateplan 2021-22 EMWSS-Remittance of cash deposit and power allocation charges to KSEB for commissioning the 110 KV Substation at H W .aluva. (EKMGOK06217688) View Progress NA View Photos 31 Dec 2021 350 View Project
54
M T W T F S S
WSS to Pavaratty and Mullassery Panchayaths in Chavakkad Taluk of Thrissur District - Construction of 5.50 LL capacity OHSR at Mullassery and 6.70 LL capacity OHSR at Pavaratty panchayath (TCRGOK0818505) View Progress View Layout View Photos 31 Dec 2021 350 View Project
55
M T W T F S S
Stateplan 2021-22 EMWSS - Replacing old damaged existing AC pipes in various wards in Aluva Municipality (EKMGOK06217659) View Progress NA View Photos 31 Dec 2021 332 View Project
56
M T W T F S S
WSS to Perinadu and Athikkayam Villages-Phase I- Remaining components (PTAGOK1217608) View Progress View Layout View Photos 31 Mar 2022 331 View Project
57
M T W T F S S
State Plan 2017-18: Procurement of sewer cleaning machines and safety equipments for sewer maintenanace (Auto mounted desilting machine-3no,medium vehicle mounted high pressure jetting machine-2No, heavy vehicle mounted high pressure jetting cum sucking machine 1No, vacuum operated suction machine-1No, self priming potable diesel dewatering pump set 4No, safety equipments for labourers-15set, other safety equipments-9set. (TVMGOK12171750) View Progress View Layout View Photos 17 Aug 2022 317 View Project
58
M T W T F S S
STATE PLAN 2018-19-EMWSS-Supply, Erection, Testing and commissioning of110 KV additional bay with consumer structure and metering units including construction of additional yard and allied works for the commissioning of 110KV substation at Head works Aluva including rehabilation of substation building (EKMGOK0818769) View Progress View Layout View Photos 18 Feb 2022 315 View Project
59
M T W T F S S
KIIFB - Budget work 2016-17 of PWD - Pipe line replacement due to PWD road widening work from Akkikavu to Mukkilpeedika Junction in Akkikavu Erumapetty road at Kadavallur Panchayath (TCRGOK09194958) View Progress View Layout View Photos 31 Dec 2021 300 View Project
60
M T W T F S S
State Plan 17-18-CWSS to Anakkara & Pattithara- Replacing the old and damaged 100/80mm AC with 110 mm PVC from Kokkad to Othallur-20000m (PKDGOK07171741) View Progress View Layout View Photos 31 Aug 2021 300 View Project
61
M T W T F S S
State Plan 2018-19-CWSS to Anakkara, Pattithara and Kappur Panchayaths - Replacing old and damaged DM AC-150mm,100mm & 80mm, PVC – 63mm,50mm using DI-K9 – 250mm-1545, 200mm -2060, PVC 160mm- 20, 140mm -1200, 110mm -90, 90mm -1040, 150mm GI-6, 125mm GI-120, 100mm GI -18, 80mm GI -114 (Total 6213m) Mukkotta jn to Chirattakkunnu, Kumbidi High school to Union shed Road of Anakkara panchayath. (PKDGOK08181657) View Progress View Layout View Photos 31 Aug 2021 300 View Project
62
M T W T F S S
State Plan- 2018 -19 KGWSS- Replacing old 250 mm AC pipe with 400 mm DI pipe from Veterinary jn to Kunnamkulam Sn office (TCRGOK08186060) View Progress NA View Photos 31 Dec 2021 300 View Project
63
M T W T F S S
State plan 2018 - 19 - TWSS - Replacing damaged Filter Media for 36 MLD water Treatment plant (TCRGOK04195081) View Progress NA View Photos 31 Dec 2021 300 View Project
64
M T W T F S S
State Plan 2020-21 - "Source improvement of Sasthamcotta water treatment plant" - Construction of recycling plant at Sasthamcotta in Kollam District. (KLMGOK04206064) View Progress View Layout View Photos 31 Oct 2021 262 View Project
65
M T W T F S S
State plan 2020-21 Optimization of production and Transmission-Central region-Replacement of old pipe- CWSS to Kadungalloor and Alangad panchayaths- Replacing worst affected AC Pumping main from treatment plant at Muppathadam to Manjali Kunnumpuram with 250 mm DI K(9) pipe. (EKMGOK12206044) No Updates View Layout No Updates 31 Oct 2021 260 View Project
66
M T W T F S S
STATE PLAN 2018-19 - Optimization Production and Transmission-WSS to Kumaranalloore.Replacing Old and damaged 300 mm AC gravity main from OHSR at Incherikunnuto OHSRat S H mount using 300 mm DI K9 Pipe (KTMGOK08181188) View Progress View Layout View Photos 31 Aug 2021 253 View Project
67
M T W T F S S
KWA- Flood related work 2018 -work under SDRF and State plan -Replacing old&damaged (frequently bursting after flood ) 250mm ACpumping cum distribution pipe with 300mm DIpipe -new proposal through new NH from Thiniyakavu to valluvally in Kottuvally Panchayath -Unique -ID007- WSK -M-020 (EKMGOK01193744) No Updates View Layout No Updates 31 Jan 2022 240 View Project
68
M T W T F S S
WSS to Anjarakandy-Peralassery and adjoining panchayaths- Replacement of old AC main distribution pipes of 350mm,250mm and 200mm dia from GLSR Kundurmala in Eranholi Panchayath with DI K9 pipes. (KNRGOK06217765) View Progress NA View Photos 31 Mar 2022 222 View Project
69
M T W T F S S
STATE PLAN 2016-17 - ARWSS TO LALAM VALLICHIRA - LAYING 200mm DI PUMPING MAIN FROM KADAPATTOOR TO NELLIYANI GL TANK . (KTMGOK02175028) View Progress View Layout View Photos 31 Oct 2021 218 View Project
70
M T W T F S S
State Plan 2019-20-RWSS to Vaniyamkulam in Vaniyamkulam Grama panchayath - Replacing old and damaged 200 mm AC Class 10 Gravity Main with 350mm DI K9 pipe from 20.50 LL capacity OHSR Kulappully to Koonathara Sump-3200m (PKDGOK06191509) View Progress View Layout View Photos 31 Aug 2021 216 View Project
71
M T W T F S S
State plan 2017-2018-CWSS to Vandazhy, Vadakkenchery,Kizhakkenchery and Kannambra Panchayaths in Alathur Thaluk-Phase-I (Part II)-Supply and errection of raw water pumpsets,supplying and laying of rawwater pumping main (600mm DI K9) (PKDGOK12176050) View Progress View Layout View Photos 31 Oct 2021 200 View Project
72
M T W T F S S
State Plan 2019-20. Replacing damaged 300mm AC Gravity pipe with 300mm DI pipe from the RCC Weir at Kandappan Chalil Natural source to Narangathodu Tank in Kodenchery Grama Panchayath. (CLTGOK0619884) No Updates NA No Updates 31 Dec 2021 200 View Project
73
M T W T F S S
State Plan 2018-2019- ARWSS to Thirunelly- Replacement of old and damaged 100 mm GI pumping main using 150 mm DI pipes from clear water sump at Karthikulam to GLSR Anappara (WYDGOK08182517) View Progress View Layout View Photos 31 May 2021 188 View Project
74
M T W T F S S
Deposit Work-2020-21-KWA Medical college (TVMGOK08206041) View Progress View Layout View Photos 08 Feb 2022 184 View Project
75
M T W T F S S
State plan 2021-22 optimisation of production and transmission - renovation of WTP and energy conservation-WSS to Palakkad renovation of 9MLD and 12.5MLD WTP (PKDGOK06217565) View Progress NA View Photos 31 Mar 2022 181 View Project
76
M T W T F S S
State Plan-Improvements to the existing WSS to Chavakkad Muncipality - strengthening of distribution network replacing existing 350 mm AC gravity line 1500 m with 350 mm DI K9 (TCRGOK12171785) View Progress NA View Photos 31 Oct 2021 180 View Project
77
M T W T F S S
State Plan 2021-22 TSS- E Block Zone II - Laying 630mm dia HDPE pipe sewer main from Edapazhanji to Chithra nagar first reach- Ch 1841 m to 2133 m (TVMGOK05217499) View Progress NA View Photos 31 Mar 2022 165 View Project
78
M T W T F S S
State Plan - 2020-21-TSS- E- Block Zone II -Laying 700mm dia RCC NP3 pipe sewer main from Jagathy towards common manhole Ch.512m to 785m & Interconnection of 700mm dia DI pipe between Jagathy Chadiyara sewer main and parallel main across Killi river and constructing 450mm dia board cast in situ piles inside of river and connected works.Ch.649m to 679m. (TVMGOK10206732) View Progress NA View Photos 31 Dec 2021 163 View Project
79
M T W T F S S
State Plan 2021-22- Optimization of Production and Transmission -Pipe line extension-RWSS to Kumaramangalam -Providing distribution lines in various wards of Kumaramangalam Panchayath (IDKGOK06217640) View Progress NA View Photos 31 Dec 2021 161 View Project
80
M T W T F S S
2018-19- OPTIMISATION OF PRODUCTION AND TRANSMISSION: RENOVATION OF WTP- UWSS to Perinthalmanna - Dedicated KSEB power line to Water Treatment Plant at Cherukara (MLPGOK08181914) No Updates NA No Updates 30 Oct 2021 160 View Project
81
M T W T F S S
State Plan 2018 - 2019 TSS Plan - 30 - Construction of well and Grit Chamber with Supplying and Installing 3 No's submersible Pump set etc. at Thaliyal Pump House. (TVMGOK02191783) View Progress View Layout View Photos 30 Sep 2021 160 View Project
82
M T W T F S S
State plan 2021-22-Optimization of production and Transmission - Replacement of old pipes in existing WSS - Replacing damaged 250mm PVC from Eranhippalam junction to Arayadathupalam junction along mini bypass road for a length of 3000m. (CLTGOK06217954) No Updates NA No Updates Date is not specified 151 View Project
83
M T W T F S S
State plan 2018-19-WSS Akalakunnam, Mutholi &Kozhuvanal- Supply and erection of Raw water & Clear Water Pump set for new scheme (KTMGOK0818606) View Progress View Layout View Photos 15 Sep 2021 150 View Project
84
M T W T F S S
STATE PLAN 2021-22 - WSS to Pattuvam and adjoing Villages- Anthoor Municipality- Replacing the existing 110mm line with 450mm,400mm and 300mm DI in Dharmasala (KNRGOK06217784) View Progress NA View Photos 31 Dec 2021 150 View Project
85
M T W T F S S
STATE PLAN 2021-22 - TWSS- Raising the road towards Podiyakkala in connection with raising the water level of Peppara dam (TVMGOK06217753) View Progress NA View Photos 31 Dec 2021 141 View Project
86
M T W T F S S
State plan 2021-22 Optimization of Production and Transmission Replacement of old pipes in Existing WSS - WSS to Puthencruz Replacement of damaged 250 mm AC pipe with 300 mm DI K9 from Choondy to Meempara in Poothrikka panchayath (EKMGOK06197691) View Progress View Layout View Photos 31 Dec 2021 140 View Project
87
M T W T F S S
State Plan-2019-20 UWSS to Piravom and Adj Panchayaths-Replacing old and damaged 80mm GI pipe with 150 mm DI K9 pipe from Kalanimattam to Koorumala (2850 m) (EKMGOK06191363) View Progress NA View Photos 30 Nov 2021 140 View Project
88
M T W T F S S
State plan 2020-21 Optimization of production and Transmission-Central region-Replacement of old pipe- CWSS to Kadungalloor , Karumaloor and Alangad Panchayaths- Replacing the worst affected 250 mm AC Pumping main from Muppathadam water treatment plant to Alangad OH tank with 300 mm DI(K9) pipe. (EKMGOK12206045) No Updates View Layout No Updates 30 Sep 2021 140 View Project
89
M T W T F S S
State Plan 2018-19-UWSS to Marthakakra Census Town -Laying Gap Connection and Replacing AC Pipe and Commissioning Distribution network (TCRGOK06181249) View Progress View Layout View Photos 31 Dec 2021 135 View Project
90
M T W T F S S
STATE PLAN PHASE IV IMPROVEMENTS OF EXISTING SUBSTAION BY PROVIDING STAND BY TRANSFORMER FACILITY 400 KVA WITH YARD EXPANSION WORK AT WTP COMPOUND MEDICAL COLLEGE KOTTAYAM (KTMGOK12197708) View Progress NA View Photos 31 Dec 2021 133 View Project
91
M T W T F S S
STATE PLAN 20.-21- Improvements to RWSS to Manjeri-Water Supply to Veettikunnu area -Phase 2- Providing Distribution Line in Ward No.28,29,30&32 of Manjeri Municipality (MLPGOK10204653) View Progress NA View Photos 30 Dec 2021 132 View Project
92
M T W T F S S
State Plan (2018-2019 )- RWSS to Nooranad-Replacing of old damaged AC pipe line from Edapon towards Para Jn with 160 mm (6 kg/cm2 ) PVC pipe line (ALPGOK04181399) View Progress View Layout View Photos 31 Dec 2021 131 View Project
93
M T W T F S S
State Plan 2021-22- Improvement works of water supply scheme to Shornur Municipality- Replacement of 500mm CI pumping main with 500mm DI K9 pipe from raw water pump house to Railway over bridge (Reach 1) (PKDGOK06217867) View Progress NA View Photos Date is not specified 127 View Project
94
M T W T F S S
State Plan 2021-22 TSS - D Block - Zone II - Supplying Conveying and Laying 700mm dia RCC NP3 pipe sewer trunk main II from Murinjapalam to Kannamoola - Ch 0 to 342m (TVMGOK05217477) View Progress NA View Photos 31 Mar 2022 126 View Project
95
M T W T F S S
Stateplan-2019-20-Optimisation and production and transmission-WSS to Thalassery Municipality-Morakkunnu zone-Replacing old distribution pipes along Thalassery-Kodiyeri PWD road using PVC pipes for utility shifting of workReplacement of pipes- (KNRGOK11191776) View Progress NA View Photos 31 Dec 2021 125 View Project
96
M T W T F S S
RWSS to Kottakkal Parappur replacing old damaged 200 mm AC distribution main with 200 mm DI K9 pipe at Kurbani junction in Kottakkal Municipality (MLPGOK06211689) View Progress NA View Photos 30 Sep 2021 118 View Project
97
M T W T F S S
State Plan-2020-21-Thalassery Water Supply Scheme and WSS to Mahe region - Supply and erection of 300HP VT Pumpset-2Nos at Keezhallur pumphouse. (KNRGOK10205131) View Progress NA View Photos 30 Nov 2021 115 View Project
98
M T W T F S S
State Plan-2020-21-TSS - Providing and laying 300mm dia main and 200mm SW branch sewer line towards Sreekrishna Nagar infront of Jagathy School in Jagathy Kochar Road (TVMGOK10204314) View Progress NA View Photos 31 Dec 2021 113 View Project
99
M T W T F S S
State Plan 2021-22 - TSS -Zone II - Laying 600mm dia RCC NP3 pipe sewer main towards Edapazhanji Chithra nagar (IV th reach ) Chainage 2738 m to 2908 m in connection with the commissioning of Jagathy -Koottamvila scheme- land acquisition cost (TVMGOK05217476) View Progress View Layout View Photos 31 Mar 2022 112 View Project
100
M T W T F S S
State Plan 2018-19-CWSS to Amboori-replacing old damaged 200mm AC line using 200mm AC class distribution main with 200mm DI k9 pipe from Kallimoodu to Killiyoor in Vellarda Panchayth (TVMGOK08182100) View Progress View Layout View Photos 31 Dec 2021 111 View Project
101
M T W T F S S
State Plan 2019-20 : EMWSS - Replacing old and damaged (DM) 200 mm CI with 250 mm DI K9 pipe along Kaloor Jn. Puthiya road Jn. Perandoor /LFC road (710m). (EKMGOK06192631) View Progress View Layout View Photos 30 Sep 2021 109 View Project
102
M T W T F S S
Optimisation of Production and Transmission-Replacement of Old pipes in Existing WSS 2019-20 1 RWSS to Kumaliy-Replacing old and damaged 80,50,40 mm distribution main (7500m) GI with 80 mm,50 mm,40 mm (7500m ) at Rosapookandam (IDKGOK06195927) No Updates NA No Updates 15 Mar 2022 106 View Project
103
M T W T F S S
State Plan 30 - 2018-19 - TSS- Rehabilitation of Exisitng Sewerline near Thaliyal Pump house to avoid sewage overflow to Killi river (TVMGOK02194473) View Progress NA View Photos 31 Dec 2021 103 View Project
104
M T W T F S S
STATE PLAN 2016-17 RWSS Pudussery shiftins distribution main passing through RLY coach factory 160 mm pvc (PKDGOK02171014) View Progress View Layout View Photos 31 Oct 2021 100 View Project
105
M T W T F S S
State Plan 2018-19- ARWSS to Vorkady & adjoining Panchayaths- Renovation of vented weir across Uppala river at Anakallu (KGDGOK08181372) View Progress NA View Photos 31 May 2022 100 View Project
106
M T W T F S S
State Plan 2019-20- RWSS to Kanhangad-replacing old damaged 200 mm Ac distribution main with 200 mm DI K9 pipe(2850m) from Ambalathungara to Chemmattam vayal. (KGDGOK06191375) No Updates View Layout No Updates 31 Oct 2021 100 View Project
107
M T W T F S S
State Plan 2020-21-WSS TO Edakad Zone I-Replacement of old damaged 140/110 mmPVC pipeline from Chala temple to Nambolankunnu in Chala Padinharekkara Road (KNRGOK12205888) View Progress View Layout View Photos 31 Dec 2021 100 View Project
108
M T W T F S S
STATE PLAN 20.-21- ARWSS to Wandoor-Replacing old AC 150/125 mm distribution main - 4000m with 140/160 mm PVC along Kalikavu-and Nilambur Road under PH Section Wandoor. (MLPGOK10204656) View Progress NA View Photos 30 Dec 2021 100 View Project