KIIFB -17-18 - Vandazhi, Kizhakkencherry, Vadakkencherry & Kannambra Comprehensive Fresh Water distribution project – Phase II in Palakkad District

Project KIIFB -17-18 - Vandazhi, Kizhakkencherry, Vadakkencherry & Kannambra Comprehensive Fresh Water distribution project – Phase II in Palakkad District
Project Code PKDKIIFB1118631
Type Main project
Funding Agency KIIFB
Category KIIFB
Type of scheme Water Supply
Scheme KIIFB
Description The project is designed to provide adequate drinking water to the entire population of all wards except the elevated places of Vandazhy, Kizhakkanchery, Vadakkanchery and Kannambra Panchayaths in Alathur and Tharur constituencies of Palakkad district.The proposed project includes the components for pumping treated water to the proposed OHSR at Ponkandam and gravity feeding from balancing reservoir at WTP plant site to the proposed OHSRs at Cheerakuzhy palam, Vadakkanchery and Kannambra and boosting pumping from Cheerakuzhy to existing OHSR at Kanichiparutha so as to meet the water demand of the benefitted panchayaths at the rate of 100 liters per capita per day in the design year 2050. The Executive Engineer, Project Division, Palakkad vide letter no KWA/WSP/PKD/D2-01/2014 (Mangalam) dated 17.07.2019 has informed the Superintending Engineer, PPD, Kozhikkode that the proposed tank site at PWD rest house not available. Sri K D Prasenan, Hon'ble MLA of Alathur constituency, directed for ensuring the water supply coverage to the people residing in the high level areas of the benefitted Panchayaths in the meeting held at the chamber of honorable minister Sri. A K. Balan. Hence new tank locations are identified which will ensure the water supply coverage of the high level and low level zones of all 4 Grama panchayaths and design was modified accordingly by PPD. Location of service reservoirs are finalized for design based on the joint inspection of PPD and Project Division, Palakkad.The original proposal of transmission of treated water to OHSRs through gravity changed to Pumping. Hence motor pumpsets introduced in the revised proposal for pumping of treated water to the OHSRs. Due to the rezoning of the entire benfitted area in to 8 zones, the locations and capacities of proposed OHSRs are changed. The locations and revised capacities of OHSRs are 22 LL at Karimkunnam for covering the low level zones of Vadakkenchery and Kannambra panchayaths, 16 LL OHSR at Kavalupara Nannagadi for high level zones of Vandazhy and Kizhakkenchery panchayaths, 10LL OHSR at Palakuzhy for high level zones of Vadakkenchery and Kannambra, 0.20 LL OHSR capacity at a level of +507.000m to cater the demand of Palakuzhy highly elevated areas. The change in the diameter of transmission mains, length, route etc occurred. For pumping clear water from the Palakuzhy OHSR at a level of +187.00m to the 0.20LL OHSR at +507.00m, and two online booster stations are proposed.
Status On-going
District Palakkad
Executing Office Chittur Project Dn
AS Amount (Rs) 695400000
AS Number WRD0025-20-PA-01 dated 19.11.2018
TS Amount (Rs) 685400000
TS Number
Total Bill Submitted (Rs) 195353980
Total Bill Paid (Rs) 195353980
Population Benefitted 45000
Capacity in MLD 24.50
Actual Project Completion Date 12 Mar 2021
Coverage Vandazhy, vadakkenchery, kizhakkenchery
Implementation Schedule Download
Work Plan Download

Packages

No. Project Name Location View
1 KIIFB – 2017-18 Vandazhi, Kizhakkenchery, Vadakkanchery and Kannambra Panchayaths in Palakkad District – phase II - package I - Design, construction,Commissioning and Maintenance of 22.00 LL OHSR at Karimkunnam in Vadakkanchery Panchayath, Supplying and Laying 350mm DI K9 CWPM from WTP to Karimkunnam OHSR, Supplying and Erection of ,CW motor pump sets including road restoration work Project Division Chittur
2 KIIFB 2017-2018--CWSS to Vandazhy,Kizhakkenchery,vadakkenchery and kannambra panchayaths in palakkad district-Phase-II-Package-2-part-II Project Division Chittur
3 KIIFB-2017-2018-CWSS TO Vandazhy,Kizhakkenchery,vadakkenchery and kannambra panchayaths in palakkad district-Phase-II-Package-III -Supplying and Laying distribution network in Low level zone of Vandazhy grama panchayath from 24.50 LL OHSR at Mangalam Dam WTP - Zone 1 Project Division Chittur
4 KIIFB-2017-2018-CWSS TO Vandazhy,Kizhakkenchery,vadakkenchery and kannambra panchayaths in palakkad district-Phase-II-Package-II-Part-I-Supplying laying testing commissioning and maintenance of distribution net work from 22 LL OHSR at Karimkunnam and Transmission main from OHSR up to Diana Hotel including NH 544 crossing for kannambra low level zone and road restoration Project Division Chittur

Overall Project Status

Status Date Overall Project Status Project Officer Contact
23 Apr 2024 PHASE II – PACK 1- Work in progress | 91% Completed | 23/04/2024 OHSR colour washing work and compound wall work are also in progress and, 350mm DI work- 15.00KM PIPE supplied at site and 14810.20km laid,GAP filling work is in progress PHASE II – PACK – 2 PART 2 - Not Started | 23/04/2024 Work not started PHASE II – PACK 3 ZONE 1 - Work in progress |85%Completed | 23/04/2024 1300 FHTC provided. Various dia of pvc pipes and GI pipes are supplied at site Total supply-120 km, Total laid- 100.500 km /out of 120km , 1.) 90 mm 6 kg-48540m supplied- 33872 m laid 2.) 90 mm 8 kg-37362m supplied and 31415 m laid 3.) 90mm 10 kg 240m supplied-60m 3a) 110mm 6 kg-4278m supplied and 2966 m laid 4) 110mm 8kg-5268 m supplied and 4665.80 m laid 5) 140mm 6kg-5620 m supplied 3811m laid 6) 140mm 8 kg-1953 m supplied -1146 m laid 7) 160 mm 6 kg 2928 m supplied -3834 m laid 8) 160 mm 8 kg-1050 m supplied 1009.50m 9) 80 mm GI- 2520 m laid-1304.5 m laid 10)100 mm GI-312 m supplied-224 .50M laid 11)125mm GI-130m supplied -105 M laid 12)150MM GI-136.50 m supplied 102M 13)450MM DI-2189 m supplied-1713.25 laidM 14)200mm DI-1977.50 m supplied -1099.75 laidM 15)250mm di-2915m supplied – 831.05mlaid 16)400MM DI-2833.00m supplied -2766.25 M laid 17) 350mm di 1407 m supplied-493.5 M PHASE II – PACK – 2 PART 1 - Work in progress | 72% Completed | 23/04/2024 WORK FORE CLOSED ON 17.05.2023 VIDE ORDER NO KWA/PHC/PKD/KIIFB/Vandazhy/ph II/PACK-II/17-18, Balance work arranged in kiifb vandazhy vadakkenchery kizhakkenchery kannambra panchayaths phase-2 pack-2 part-1 Chittur Project Dn - AE 3
11 Apr 2024 Pack-1 Work in progress | 91% Completed | 11/04/2024 OHSR colour washing work and compound wall work are also in progress and, 350mm DI work- 15.00KM PIPE supplied at site and 14810.20km laid,GAP filling work is in progress Pack-pack-2-part2 Not Started | 11/04/2024 Work not started Pack-3 Work in progress | 83% Completed | 11/04/2024 1300 FHTC provided. Various dia of pvc pipes and GI pipes are supplied at site Total supply-120 km, Total laid- 100.248 km /out of 120km , 1.) 90 mm 6 kg-48540m supplied- 33872 m laid 2.) 90 mm 8 kg-37362m supplied and 31109. m laid 3.) 90mm 10 kg 240m supplied-60m 3a) 110mm 6 kg-4278m supplied and 2966 m laid 4) 110mm 8kg-5268 m supplied and 4665.80 m laid 5) 140mm 6kg-5620 m supplied 3790.00 m laid 6) 140mm 8 kg-1953 m supplied -1146 m laid 7) 160 mm 6 kg 2928 m supplied -3834 m laid 8) 160 mm 8 kg-1050 m supplied 1009.50m 9) 80 mm GI- 2520 m laid-1292.5 m laid 10)100 mm GI-312 m supplied-224 .50M laid 11)125mm GI-130m supplied -105 M laid 12)150MM GI-136.50 m supplied 102M 13)450MM DI-2189 m supplied-1713.25 laidM 14)200mm DI-1977.50 m supplied -1099.75 laidM 15)250mm di-2915m supplied – 831.05mlaid 16)400MM DI-2833.00m supplied -2720.25M laid 17) 350mm di 1407 m supplied-225.50 Pack-2-part-1 Work in progress | 72% Completed | 16/02/2024 WORK FORE CLOSED ON 17.05.2023 VIDE ORDER NO KWA/PHC/PKD/KIIFB/Vandazhy/ph II/PACK-II/17-18, Balance work arranged in kiifb vandazhy vadakkenchery kizhakkenchery kannambra panchayaths phase-2 pack-2 part-2 Chittur Project Dn - AE 3
16 Feb 2024 PACK-3 Work in progress | 80% Completed | 16/02/2024 1300 FHTC provided. Various dia of pvc pipes and GI pipes are supplied at site Total supply-120 km, Total laid- 96.37 km /out of 120km , 1.) 90 mm 6 kg-48540m supplied- 31850 m laid 2.) 90 mm 8 kg-37362m supplied and 30803.00 m laid 3.) 90mm 10 kg 240m supplied-laid nil 3a) 110mm 6 kg-4278m supplied and 2966 m laid 4) 110mm 8kg-5268 m supplied and 4107.80 m laid 5) 140mm 6kg-5620 m supplied 3346.00 m laid 6) 140mm 8 kg-1953 m supplied -1146 m laid 7) 160 mm 6 kg 2928 m supplied -3834 m laid 8) 160 mm 8 kg-1050 m supplied 1009.50m 9) 80 mm GI- 2520 m laid-1175.50 m laid 10)100 mm GI-312 m supplied-224 .50M laid 11)125mm GI-130m supplied -33.30M laid 12)150MM GI-136.50 m supplied 102M 13)450MM DI-2189 m supplied-1465.75 laidM 14)200mm DI-1977.50 m supplied -1099.75 laidM 15)250mm di-2915m supplied - 811.55mlaid 16)400MM DI-2833.00m supplied -2720.25M laid 17) 350mm di 1407 m supplied-225.50M PART2 Not Started | 16/02/2024 New estimate submitted to kiifb for approval PACK-1 Work in progress | 91% Completed | 16/02/2024 OHSR colour washing work and compound wall work are also in progress and, 350mm DI work- 15.00KM PIPE supplied at site and 14810.20km laid,GAP filling work is in progress Pack-2-part-1 Work in progress | 72% Completed | 16/02/2024 WORK FORE CLOSED ON 17.05.2023 VIDE ORDER NO KWA/PHC/PKD/KIIFB/Vandazhy/ph II/PACK-II/17-18, Balance work arranged in kiifb vandazhy vadakkenchery kizhakkenchery kannambra panchayaths phase-2 pack-2 part-2 Chittur Project Dn - AE 3
03 Nov 2023 Phase-1 Work in progress | 91% Completed | 03/11/2023 OHSR colour washing work and compound wall work are also in progress and, 350mm DI work- 15.00KM PIPE supplied at site and 14810.20km laid,GAP filling work is in progress Phase-2-pack-3 Work in progress | 60% Completed | 03/11/2023 Work in progress | 60% Completed | 12/10/2023 1300 FHTC provided. Various dia of pvc pipes and GI pipes are supplied at site Total supply-110 km, Total laid- 72.1090 km /out of 120km , 1.) 90 mm 6 kg-26km supplied- 29714 m laid 2) 90 mm 8 kg-25km supplied and 26585 m laid 3) 110mm 6 kg-4278m supplied and 2966 m laid 4) 110mm 8kg-3150m supplied and 3537.80 m laid 5) 140mm 6kg-3540 m supplied 2734.00 m laid 6) 140mm 8 kg-648 m laid 7)160 mm 6 kg 2490 m supplied 2844 m laid 8) 160 mm 8 kg-1050 m supplied 996m 9) 80 mm GI- 1061 m laid 10)100 mm GI-224 M laid 11)125mm GI-33M 12)150MM GI-102M 13)450MM DI-1424.50M 14)200mm DI-984.50M 15)250mm di-613.55m Phase 2-prt-2- Not Started | 03/11/2023 work not started Chittur Project Dn - AE 3
12 Oct 2023 PACK-1 Work in progress | 91% Completed | 12/10/2023 OHSR colour washing work and compound wall work are also in progress and, 350mm DI work- 15.00KM PIPE supplied at site and 14810.20km laid,GAP filling work is in progress PACK-2-PART-2 Not Started | 12/10/2023 work not started PART-1 Work in progress | 72% Completed | 12/10/2023 Anchor block work,GI Pip work ,leak rectification works are in progress. And TOTAL K 113.766kM LAID/OUT OF 160KM 1.) 90 mm pvc -8 kg 28.233 km laid 2.) 90mm pvc-6 kg-55.567 KM laid 3.) 110 mm pvc 8 kg- 2.277 k m laid 4.)110mm pvc -6kg-6.365Km laid 5.)140mm pvc-6kg-1.530Km 6). 160mm pvc-6kg-1.861Km laid 7).160mm pvc -8kg-1.558 Km laid 8).300 MM DI k9-0.5465Km laid 9). 200mm DI K9-1.195 KM laid 10).250mm DI pipe-0.5501Km 11)140mm pvc 8 kg-0.048km, 12) 80 mm GI- 1.9853km Rider main 90mm 6 kg-1.803 km laid , 13)100 mm GI-1.847km , 14) 150mm GI-0.186km 15)200 mm MS pipe-9.40m 16)125mm GI-30M 17)500MM DI K9-175.008M 18)450MM DI -531.293M 19)400 MM DI-215.008m 20)350MM DI-206.09M . FHTC -1843 provided / out of 6480 PACK-3 Work in progress | 55% Completed | 12/10/2023 Work in progress | 67% Completed | 12/10/2023 1300 FHTC provided. Various dia of pvc pipes and GI pipes are supplied at site Total supply-110 km, Total laid- 65.039 km /out of 120km , 1.) 90 mm 6 kg-25km supplied- 25628 m laid 2) 90 mm 8 kg-25km supplied and 26585 m laid 3) 110mm 6 kg-4278m supplied and 2966 m laid 4) 110mm 8kg-3150m supplied and 3537.80 m laid 5) 140mm 6kg-3540 m supplied 2734.00 m laid 6) 140mm 8 kg-648 m laid 7)160 mm 6 kg 2490 m supplied 2844 m laid 8) 160 mm 8 kg-1050 m supplied 996m 9) 80 mm GI- 1061 m laid 10)100 mm GI-224 M laid 11)125mm GI-33M 12)150MM GI-102M 13)450MM DI-38.50M Chittur Project Dn - AE 3

Project Review

See All Review messages
Review Date Review Message Review Attended By
23 Dec 2021 HDD along NH at Wadakkanchery area. NHAI will not permit excavation along the service road and is insisting HDD for nearly 7km. There are many branches on either side and so pipes will have to be laid on both sides. Acquisition of land on either side is an option, but the NHAI has plans for widening plans on the anvil, which is not finalized. EE is directed to prepare estimate for HDD Baby George, EE, A S Raju, AEE

Duration & Sanction dates

Date of start of Project 13/03/2020
Scheduled date of Completion of the Project 27 May 2022
Expected date of Completion 31/12/2023

Processing Dates

AS Date 19 Nov 2018
TS Date 13 Dec 2019

Other details

Project Officers View