KIIFB 2017-18-WRD 025-27- Karimpukayam Water supply project- Augmentation of ARWSS to Kanjirappally, Elikkulam and Chirakkadavu panchayat in Kottayam district

Project KIIFB 2017-18-WRD 025-27- Karimpukayam Water supply project- Augmentation of ARWSS to Kanjirappally, Elikkulam and Chirakkadavu panchayat in Kottayam district
Project Code KTMKIIFB1118571
Type Main project
Funding Agency KIIFB
Category KIIFB
Type of scheme Water Supply
Scheme KIIFB
Description Augmentation of existing scheme.Augmentation consists of following components: 6 MLD WTP at Karimpukayam existing WTP premises. 500 MM DI K9 RWPM 400 MM DI K9 CWPM from sump to OHSR at WTP 6 LL OHSR at WTP site 5 LL OHSR at Panechapally 8.5 LL OHSR at Thambalakkadu 200 HP Raw water pump set 50 HP CW P/S to OHSR at WTP site 50 HP CW P/S to Panechapally Power enhancement at Gramadeepam and WTP premises Distribution network in Kanjirapally(Zone 1,2,3A),Chirakkadavu panchayath(Zone 1B,4 &5),Elikkulam Panchayath(Zone 3B) 75 HP P/S from Gramadeepm to Ponkunnam 10 HP P/S from Gramadeepm to Kanjirapally 120HP P/S from Gramadeepm to Thambalakkadu RR charges Cost of Land 2 ll sump at Gramadeepam, 350 mm DI K9 from OHSR at WTP to Gramadeepam 300 DI K9 CWPM from Gramadeepam to Thamabalakkadu 250 DI K9 CWPM from Gramadeepam to Ponkunnam
Status On-going
District Kottayam
Executing Office Kottayam Project Dn
AS Amount (Rs) 686400000
AS Number G.O(Rt) No 227/2018/WRD
TS Amount (Rs) 260600000
TS Number TS/2020-2021/2020/20420
Total Bill Submitted (Rs) 1
Total Bill Paid (Rs) 1
Population Benefitted 90000
Capacity in MLD 15.00
Actual Project Completion Date 30 Nov 2022
Coverage Kanjirapally,Elikkulam and Chirakkadavu panchayaths of kanjirapally and Pala constituencies
Implementation Schedule Download
Work Plan Download

Packages

No. Project Name Location View
1 KIIFB 2017-18 WRD 025-27:Augmentation of WSS to Karimpukayam-Package I Kottayam Project Dn
2 KIIFB 2017-18 WRD 025-27:Augmentation of WSS to Karimpukayam-Package II Kottayam Project Dn
3 KIIFB 2017-18 WRD 025-27:Augmentation of WSS to Karimpukayam-Package III Kottayam Project Dn

Overall Project Status

Status Date Overall Project Status Project Officer Contact
14 Nov 2023 Package 1-Regarding the handing over of the lands, meetings were conducted in the chamber of district collector, kottayam on 26/10/2022, 7/11/2022. As directed by the district collector, we have submitted the revised drawing for the 10cent land for 5LL OHSR at penechapally. The district collector has given direction to the LA Tahsildar (KIIFB) in order to fix the values for other two lands. The BVR for the 3 lands has to be issued from the Collectorate, 19(11) notification published on oct 2023. Award of land placed on 28.11.2023, after hand over of land works can be tendered Package 2- Pipe laying works and pressure testing works in the Chirakkadavu zone 1B , Zone 4 & Zone 5 area in progress. PWD road cutting sanction pending on 1, Ponkunnam - Azheekkal road, 2, Kanjirapally- Elikulam road, 3, Chamampathal-Thekkethukavala, 4, 19th mile- Chirakadavu, 5, Mooleplavu- Powathukavala-Koombukkal purayidam. NH 183 cutting sanction pending on Ponkunnam- KVMS , process at NH division Muvattupuzha Package 3- The Risk & cost estimate prepared with revised SOR in Price 3.0. The stay order has to be vacated for WP(C) 14792/2022 filed by J&B Engineering (Judgement dated 29/04/2022 on WP(C) 14792/2022). Kottayam Proj Dn AE4
23 Jan 2023 Package I: Regarding the handing over of the lands, meetings were conducted in the chamber of district collector, kottayam on 26/10/2022, 7/11/2022. As directed by the district collector, we have submitted the revised drawing for the 10cent land for 5LL OHSR at penechapally. The district collector has given direction to the LA Tahsildar (KIIFB) in order to fix the values for other two lands. The BVR for the 3 lands has to be issued from the Collectorate. PACKGE 2 Pipe laying works and pressure testing works in the Chirakkadavu area in progress. package 3:The Risk & cost estimate prepared with revised SOR in Price 3.0. The stay order has to be vacated for WP(C) 14792/2022 filed by J&B Engineering (Judgement dated 29/04/2022 on WP(C) 14792/2022). Kottayam Proj Dn AE4
01 Aug 2022 Package I Sub division sketch for 68 cent land is being prepared at LA Tahsildar office.On approval next step is 19(1) notification with submission of Basic Valuation Report. PACKGE 2 Tender docs with price bid submitted to CE office for evaluation on 30.07.2022 PACKGE3 TS for risk and cost estimate is awarded.Maintained STATUS QUO vide order from high court Kottayam Proj Dn AE4
10 Jul 2022 PAkage 1 Final survey at site is completed on 24.06.2022 by LA Tahsildar,Vaikom.All obligations from KWA side is complete.On discussuion,it is understood that Basic Valuation Report is being prepared by Tahsildr and will submit soon to District Collector.Meanwhile to expedite the procees of land availability,seperate movement from Panchayath side is ongoing to handover the land by including in JJM projects.resolution is recieved. Package 2 Tendered. Package 3 Is send for TS as risk and cost estimate. Kottayam Proj Dn AE4
30 Jun 2022 PAkage 1 Final survey at site is completed on 24.06.2022 by LA Tahsildar,Vaikom.All obligations from KWA side is complete.On discussuion,it is understood that Basic Valuation Report is being prepared by Tahsildr and will submit soon to District Collector.Meanwhile to expedite the procees of land availability,seperate movement from Panchayath side is ongoing to handover the land by including in JJM projects.resolution is recieved. Package 2 Tendered and due date is 19.6.22 Package 3 Is send for TS as risk and cost estimate. Kottayam Proj Dn AE4

Project Review

See All Review messages
Review Date Review Message Review Attended By
11 Oct 2021 Please follow up with DC , also explore the possibility to get the land in advance possession in coordination with GP

Duration & Sanction dates

Date of start of Project 04/05/2021
Scheduled date of Completion of the Project 31 Mar 2023
Expected date of Completion 31/03/2023

Processing Dates

AS Date 31 Mar 2018
TS Date 31 Mar 2018