Package: Deposit work-200-21-KWA-MCH-Deposit Work-Replacing the Damaged and Old GI Pump Main Water Supply line in Super Speciality Block of medical college
20/05/2021 by Pattoor Sewerage Dn - 8547638033
Non starter | 0.00% Completed
Work Not Started Work Not Started
17/05/2021 by Pattoor Sewerage Dn - 8547638033
Non starter | 0.00% Completed
Work Not Started Work Not Started
Package: Deposit work -2020-2021-KWA MCH Urgent laying of sewer mains and construction of RCC manholes and allied works in front of casualty and back side of mother and Child statue and near the Sasitharoor building to main hospital entrance etc in the Medical college campus
20/05/2021 by Pattoor Sewerage Dn - 8547638033
On going | 47.00% Completed
Work stopped due to Triple lock down. Work stopped due to Triple lock down.
17/05/2021 by Pattoor Sewerage Dn - 8547638033
On going | 47.00% Completed
Work in Progress. Seven Manhole Constructed. 85 meter Sewer Line Pipe Laying Excavation Competed. Excavation for Eighth manhole started. Work in Progress. Seven Manhole Constructed. 85 meter Sewer Line Pipe Laying Excavation Competed. Excavation for Eighth manhole started.
Package: Deposit work -2020-2021-KWA Urgent Rectification works-Rectifying the leakages of 10LL capacity main sump at Medical college campus
20/05/2021 by Pattoor Sewerage Dn - 8547638033
Non starter | 0.00% Completed
Not Started Not Started
17/05/2021 by Pattoor Sewerage Dn - 8547638033
Non starter | 0.00% Completed
Not Started Not Started
Package: Deposit work-2020-21-Deposit work MCH-TSS-Mace-Providing Additional Water storage at Government Nursing hostel
20/05/2021 by Pattoor Sewerage Dn - 8547638033
Completed | 100.00% Completed
Work completed. Bill preparation in progress. Work completed. Bill preparation in progress.
17/05/2021 by Pattoor Sewerage Dn - 8547638033
Completed | 100.00% Completed
Work completed. Bill preparation in progress. Work completed. Bill preparation in progress.
Package: Deposit work-2020-21--KWA MCH Deposit work providing and fixing PVC storage water tank over the roof slab of Physical Medicine Department at Medical college campus
20/05/2021 by Pattoor Sewerage Dn - 8547638033
Completed | 100.00% Completed
Work has been completed Work has been completed
17/05/2021 by Pattoor Sewerage Dn - 8547638033
Completed | 100.00% Completed
Work completed. Work completed.