| Sl. No. |
Updated On |
Name of Project |
Daily Progress |
Project Layout |
Photo Album |
Scheduled date of completion |
AS Amount (in Lakhs) |
View Project |
| 1 |
|
KIIFB -Kuttanad Drinking Water Project Phase II in Alappuzha District (ALPKIIFB0619635) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2023 |
28954 |
View Project |
| 2 |
|
PROJECTS UNDER KERALA INFRA.INVT. FUND BOARD KIIFB(74)-Augmentation of WSS to Kollam Corporation Phase II(7503) (KLMKIIFB0117465) |
View Progress
|
View Layout |
View Photos
|
31 Mar 2022 |
23500 |
View Project |
| 3 |
|
KIIFB-Augmentation and Modernization of WSS to Alappuzha Municipality, Aryad, Mannanchery and Mararikulam South Panchayaths (ALPKIIFB0619496) |
View Progress
|
NA |
View Photos
|
31 Dec 2023 |
21171 |
View Project |
| 4 |
|
KIIFB- Supplying ,Laying,Testing And Commissioning of 1422mm MS Pipe(Spirall welded MS Pipe with 12 .5mm thick MS Plate with Inside and Out sideLining ) Clear Water Gravity Main From 120 Mld WTP Neyyar Dam To PTP (TVMKIIFB0619708) |
View Progress
|
NA |
View Photos
|
31 Mar 2022 |
20696 |
View Project |
| 5 |
|
KIIFB-WSS to Ala, Puliyoor, Budhanoor, Pandanad, Mulakkuzha, Venmony Panchayaths and Chengannur Municipality (ALPKIIFB0919495) |
View Progress
|
View Layout |
View Photos
|
30 Jun 2023 |
19913 |
View Project |
| 6 |
|
KIIFB-WSS to Thrissur Corporation and adjoining panchayaths (TCRKIIFB0117503) |
View Progress
|
NA |
View Photos
|
Date is not specified |
18500 |
View Project |
| 7 |
|
KIIFB Project: Tranche 13: WRD004-02- lmprovements to WSS of Kondotty Municipality- Phase-ll (MLPKIIFB0619570) |
View Progress
|
NA |
View Photos
|
31 Dec 2022 |
10870 |
View Project |
| 8 |
|
KIIFB special Investment package - WRD010-05-WSS to Tanur Municipality and adjoining 4 panchayaths (MLPKIIFB0117518) |
View Progress
|
NA |
View Photos
|
31 May 2022 |
10000 |
View Project |
| 9 |
|
KIIFB 2017-18- Drinking water project in Ettumanoor Municipality (KTMKIIFB0619525) |
View Progress
|
View Layout |
View Photos
|
31 May 2022 |
9323 |
View Project |
| 10 |
|
Budget -2017-2018-KIIFB project-TRAN10:WRD 025-13-WSS to Ramanchadi- Aligarh in Malappuram District (MLPKIIFB1118510) |
View Progress
|
NA |
View Photos
|
31 Mar 2022 |
9252 |
View Project |
| 11 |
|
Karode Comprehensive Drinking Water Project – PHASE - I (TVMKIIFB0919707) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2022 |
8919 |
View Project |
| 12 |
|
KIIFB WRD 025-15 THALASSERY-KOOTHUPARAMBA COMPREHENSIVE DRINKING WATER PROJECT (KNRKIIFB1118611) |
No Updates
|
NA |
No Updates
|
31 Aug 2023 |
8586 |
View Project |
| 13 |
|
KIIFB-2016-17-WRD 002-07- WSS to koyilandy muncipality and adjoining panchayath (phase1) (CLTKIIFB1117507) |
View Progress
|
NA |
View Photos
|
30 Nov 2021 |
8500 |
View Project |
| 14 |
|
KIIFB : CWSS to Pulimath,Nagaroor and Karavaram Panchayaths Phase I (TVMKIIFB0219618) |
View Progress
|
View Layout |
View Photos
|
31 Mar 2023 |
8181 |
View Project |
| 15 |
|
KIIFB-2017-2018- CWSS to Perumatty , Pattanchery ,Nallepilly,Elappully Panchayaths in palakkad district--Phase III (PKDKIIFB0220657) |
View Progress
|
NA |
View Photos
|
03 Nov 2021 |
7721 |
View Project |
| 16 |
|
KIIFB -WRD 002-11 -WSS TO MATTANNUR AND IRITTY MUNICIPALITIES (KNRKIIFB0117528) |
No Updates
|
NA |
No Updates
|
04 May 2022 |
7660 |
View Project |
| 17 |
|
KIIFB-WSS TO KASARAGOD MUNICIPALITY AND CHEMMANAD PANCHAYATH - PHASE I (KGDKIIFB0117579) |
No Updates
|
NA |
No Updates
|
31 Mar 2022 |
7600 |
View Project |
| 18 |
|
KIIFB - Special Investment package - WRD 002- 06 - CWSS to Ponnani Muncipality and adjoining villages. (MLPKIIFB1016554) |
View Progress
|
NA |
View Photos
|
31 May 2021 |
7440 |
View Project |
| 19 |
|
KIIFB - Augumentation of WSS To Angamaly Constituency -Part -I (EKMKIIFB1118475) |
View Progress
|
NA |
View Photos
|
22 Nov 2022 |
7335 |
View Project |
| 20 |
|
Budget 2017-18 KIIFB- Tranche - 10 - WRD 025- 25 Manjeri Suburban Drinking Water Project (MLPKIIFB1118517) |
View Progress
|
View Layout |
View Photos
|
31 Jul 2022 |
7258 |
View Project |
| 21 |
|
Budget 2017-18-KIIFB-TRAN 10-WRD025-05:WSS to Edayur Panchayath of Malappuram District (MLPKIIFB1118553) |
View Progress
|
NA |
View Photos
|
30 Mar 2022 |
7217 |
View Project |
| 22 |
|
KIIFB -WATER SUPPLY PROJECT to Peravoor, Muzhakkunnu, Payam and Ayyankunnu in Kannur District - Phase - I. (KNRKIIFB03187118) |
View Progress
|
NA |
View Photos
|
31 Mar 2023 |
7120 |
View Project |
| 23 |
|
KIIFB-Augmentation of CWSS to Nattika Firka (Phase I) (TCRKIIFB1118506) |
View Progress
|
View Layout |
View Photos
|
24 Feb 2022 |
6996 |
View Project |
| 24 |
|
Vandazhi, Kizhakkencherry, Vadakkencherry & Kannambra Comprehensive Fresh Water distribution project – Phase II in Palakkad District (PKDKIIFB1118631) |
View Progress
|
View Layout |
View Photos
|
04 Nov 2021 |
6954 |
View Project |
| 25 |
|
KIIFB 2017-18-WRD 025-27- Karimpukayam Water supply project- Augmentation of ARWSS to Kanjirappally, Elikkulam and Chirakkadavu panchayat in Kottayam district (KTMKIIFB1118571) |
View Progress
|
NA |
View Photos
|
30 Nov 2022 |
6864 |
View Project |
| 26 |
|
KIIFB 2017-18- CWSS to Resolve the Scarcity of Drinking Water in various Grama Panchayaths in Malampuzha in Palakkad District Phase-I (PKDKIIFB1118630) |
View Progress
|
View Layout |
View Photos
|
16 Sep 2021 |
6414 |
View Project |
| 27 |
|
KIIFB : TWSS Rehabilitation of the existing PSC pipe Transmission main with MS pipes of various sizes from Peroorkada to Manvila including interconnection and allied works. (TVMKIIFB0518602) |
View Progress
|
View Layout |
View Photos
|
13 Jan 2022 |
6372 |
View Project |
| 28 |
|
KIIFB-WSS to Pattazhy,Pattazhy Vadakkekkara,Mylom and Thalavoor panchayaths in Kollam District Phase II (KLMKIIFB0618467) |
View Progress
|
View Layout |
View Photos
|
16 Sep 2021 |
6013 |
View Project |
| 29 |
|
KIIFB-Chathannoor drinking water project (KLMKIIFB0918466) |
View Progress
|
View Layout |
View Photos
|
05 Nov 2021 |
6000 |
View Project |
| 30 |
|
KIIFB- WSS to Kodassery, Pariyaram and Athirappally Panchayaths in Thrissur District (TCRKIIFB1118498) |
View Progress
|
NA |
View Photos
|
28 Jun 2022 |
5861 |
View Project |
| 31 |
|
KIIFB-Renovation and Augmentation of 25 mld. WTP at Kallissery and Renovation of 33 mld WTP at Thiruvalla for Thiruvalla and Changanassery Municipalities and Adjoining Panchayths (PTAKIIFB0117560) |
View Progress
|
View Layout |
View Photos
|
22 Jun 2022 |
5800 |
View Project |
| 32 |
|
KIIFB-TRAN-10-WRD 025-30:WSS to Cheruthazham and Kunhimangalam Panchayaths and Ezhimala Naval Academy in Kannur District-Phase-I (KNRKIIFB1118610) |
No Updates
|
View Layout |
No Updates
|
31 Dec 2021 |
5689 |
View Project |
| 33 |
|
KIIFB-2016-17- WRD-002-09 Augmentation of UWSS to Kottayam Municipality (KTMKIIFB0117545) |
View Progress
|
View Layout |
View Photos
|
16 Feb 2022 |
5000 |
View Project |
| 34 |
|
KIIFB – PROJECT TRANCHE-8-WRD025 - 14 WSS to Edavanna Panchayath in Malappuram District (MLPKIIFB0218679) |
View Progress
|
NA |
View Photos
|
05 May 2022 |
4721 |
View Project |
| 35 |
|
KIIFB Project: TRAN 10: WRD025-06 - WSS to Ayyappankovil Panchayat in Idukki District (IDKKIIFB1118653) |
View Progress
|
NA |
View Photos
|
31 Mar 2023 |
4642 |
View Project |
| 36 |
|
Kizhakkanmala Water Supply Scheme (TVMKIIFB0919697) |
View Progress
|
View Layout |
View Photos
|
30 Jun 2022 |
4309 |
View Project |
| 37 |
|
KIIFB - Augumentation of WSS To Angamaly Constituency -Part -II (EKMKIIFB1118478) |
View Progress
|
NA |
View Photos
|
12 Oct 2022 |
4258 |
View Project |
| 38 |
|
KIIFB_WSS to Perinadu and Athikkayam Villages-Phase II (PTAKIIFB0117573) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2021 |
4140 |
View Project |
| 39 |
|
KIIFB- WSS TO KARUMALOOR & KUNNUKARA PANCHAYATHS (EKMKIIFB0619471) |
View Progress
|
NA |
View Photos
|
28 Aug 2022 |
3750 |
View Project |
| 40 |
|
KIIFB-Water Supply Scheme to Mudhakkal Panchayath in Thiruvananthapuram Districtt-Phase I & II- (TVMKIIFB12207409) |
View Progress
|
View Layout |
View Photos
|
28 Feb 2022 |
3610 |
View Project |
| 41 |
|
KIIFB -Project-(TRAN2-WRD005-127):Replacement of Transmission Mains in Thrissur Circle (TCRKIIFB04181359) |
View Progress
|
NA |
View Photos
|
31 Dec 2021 |
3514 |
View Project |
| 42 |
|
KIIFB- WSS to Chazhoor, Thanniyam and Anthikkad Panchayath in Thrissur District (TCRKIIFB1118516) |
View Progress
|
View Layout |
View Photos
|
24 Aug 2021 |
3476 |
View Project |
| 43 |
|
WRD025-31-KIIFB - WSS to Paingottor Panchayath (EKMKIIFB0219651) |
View Progress
|
NA |
View Photos
|
31 Mar 2023 |
2882 |
View Project |
| 44 |
|
KIIFB 2017-18-Comprehensive drinking water scheme to Karimba and Kongad panchayaths in Mannarkkad and palakkad taluk in Palakkad Dt.-Phase I-Construction of pumphouse and control room, supplying and laying of raw water pumping main of 450mm dia DI K9 pipe for a length of 920m, construction, trial running and maintenance of 12 MLD WTP, construction of drainage pond at WTP premise, supplying and erection of RW and CW pumpsets and transformers. (PKDKIIFB1118667) |
View Progress
|
NA |
View Photos
|
31 Mar 2022 |
2830 |
View Project |
| 45 |
|
PROJECTS UNDER KERALA INFRA.INVT. FUND BOARD KIIFB(74)--WSS to Kalluvathukkal Parippallay and Velinalloor(Part) Villages-Phase I (7520) (KLMKIIFB0117468) |
View Progress
|
NA |
View Photos
|
12 Mar 2022 |
2700 |
View Project |
| 46 |
|
KIIFB-2017-2018- CWSS to Perumatty , Pattanchery ,Nallepilly,Elappully Panchayaths in palakkad district--Phase II (PKDKIIFB1118624) |
View Progress
|
View Layout |
View Photos
|
31 Jul 2021 |
2599 |
View Project |
| 47 |
|
Tranche 14: WRD025-09- Treated Drinking Water Projectincluding Kottukal and Athiyannoor Panchayaths- Phase I in Thiruvananthapuram District (TVMKIIFB0919638) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2022 |
2549 |
View Project |
| 48 |
|
KIIFB - 16-17 - Augmentation of Nenmara, Ayiloor and Melarcode in Chittur and Alathur Taluk in Palakkad District- Phase II- (PKDKIIFB1117627) |
View Progress
|
View Layout |
View Photos
|
09 Jul 2021 |
2450 |
View Project |
| 49 |
|
Jalagramam- CWSS to Kozhijampara, Vadakarapathy and Eruthenpathy Panchayaths in palakkad district -Phase I (PKDKIIFB1118675) |
View Progress
|
View Layout |
View Photos
|
30 Jun 2021 |
2377 |
View Project |
| 50 |
|
WSS to Ambalappara panchayath in Ottappalam Taluk (PKDKIIFB0117643) |
No Updates
|
NA |
No Updates
|
24 Jun 2021 |
2114 |
View Project |
| 51 |
|
KIIFB-TRAN11- WRD025-10- Drinking Water Project in Coastal panchayaths of Chirayinkeezhu Constituency - phase I & II (TVMKIIFB0219541) |
View Progress
|
View Layout |
View Photos
|
09 Sep 2021 |
1987 |
View Project |
| 52 |
|
KIIFB 2017-18-WRD-025-19- WSS To Feroke Karuvanhuruthy Village (CLTKIIFB1218537) |
View Progress
|
NA |
View Photos
|
31 May 2021 |
1864 |
View Project |
| 53 |
|
KIIFB (TRAN2-WRD 005-130) - RENOVATION OF WSS TO PERAMBRA, KOOTHALI, CHAKKITTAPARA AND CHANGAROTH PANCHAYATHS (CLTKIIFB03196093) |
View Progress
|
NA |
View Photos
|
04 Feb 2022 |
1823 |
View Project |
| 54 |
|
KIIFB- 2017-18- CWSS to Pallassena ,Elevanchery ,Alathur,Erimayur, pudukkode and Kavassery panchayaths in Chittur and alathur taluks in Palakkad district - Phase I - design, construction, commissioning and maintenance of 26 MLD WTP, supplying, laying 600 mm DI k9 pipe for RWPM, road restoration, supply and erection of RW pumpset, transformer (PKDKIIFB0318634) |
View Progress
|
View Layout |
View Photos
|
31 Dec 2021 |
1758 |
View Project |
| 55 |
|
WRD005-129-Project 4 - UWSS to Manjeri- Replacing old aged AC pipes with DI pipes of Manjeri MunicipalityExisting RWSS to Manjeri Muniiplality Intake well 8mtr at South putthalam OHSR 25LL capacity at Cherani Water Traetment Plant 12MLD at Cherani Raw water pumping main 400 CI 2350mtr Gravity 600mm DI 13. 5 KM Clear water sump cum booster at Cherani Total distribution from 600mm AC to 80mm Ac & PVC =150 KM ( Existing connection 9250) Annual Revenue @ 4 /KL Rs 100laks/ ( less revenue due to excessive loss in old AC distribution net work) Annual revenue expected to increase to 200 lakhs after completing this replacement (MLPKIIFB0418590) |
View Progress
|
NA |
View Photos
|
30 Sep 2021 |
1689 |
View Project |
| 56 |
|
KIIFB-VARAPUZHA (EKMKIIFB0117719) |
View Progress
|
NA |
View Photos
|
31 Dec 2021 |
1650 |
View Project |
| 57 |
|
KIIFB - UWSS to Pathanamthitta - Replacing damaged AC pipe line at town area (PTAKIIFB04186057) |
View Progress
|
NA |
View Photos
|
31 Aug 2021 |
1141 |
View Project |
| 58 |
|
KIIFB - WSS to Adoor and adjoining Panchayaths - Replacing of damaged distribution main in Pallickal Panchayath. (PTAKIIFB04186058) |
View Progress
|
NA |
View Photos
|
31 Aug 2021 |
1035 |
View Project |
| 59 |
|
KIIFB - Comprehensive & RWSS to Kollengode and adjoining Panchayaths - Replacement of 300 mm AC CW Gravity Main from Meenkara Kalikavu OHSR to Kollengode OHSR with 300mm DI K9 pipe (PKDKIIFB03195477) |
No Updates
|
NA |
No Updates
|
21 Jul 2021 |
898 |
View Project |
| 60 |
|
KIIFB - CWSS to Chithara Phase I - Replacement of AC pipe from Madathara Treatment Plant to Pezhummoodu and Kanjirathumood (KLMKIIFB09186111) |
View Progress
|
NA |
View Photos
|
Date is not specified |
761 |
View Project |
| 61 |
|
KIIFB-Project-11-Replacing 350 mm dia AC pipe of distribution main of zone II-Kolecheery WSS with DI pipes from Vaduvankulam to Panayathamparamba Break pressure tank for enhancement of coverage in Kuttiattoor, Koodali, Munderi and Keezhallur panchayaths (KNRKIIFB01192315) |
No Updates
|
NA |
No Updates
|
30 Nov 2021 |
741 |
View Project |
| 62 |
|
UWSS to Shornur Municipality - Replacement of 300 to 80mm AC distribution lines for zone III Kulappully area (PKDKIIFB0319663) |
View Progress
|
NA |
View Photos
|
30 Jun 2021 |
703 |
View Project |
| 63 |
|
UWSS to Shornur Municipality - Replacement of 300 to 80mm AC distribution lines for zone I OHSR area (PKDKIIFB0319660) |
View Progress
|
NA |
View Photos
|
30 Jun 2021 |
688 |
View Project |
| 64 |
|
KIIFB- PROJECT (TRAN2-WRD-005-131)- Replacement of Transmission Mains in Kannur Circle – Project No.12-WSS to Pallikkunnu, Puzhathi, Chirakkal & Valapattanam-Replacement of Gravity/ Pumping Main by laying direct Gravity Main to OHSR at Pallikkunnu and to Panankaav (KNRKIIFB0118829) |
View Progress
|
NA |
View Photos
|
31 Aug 2021 |
652 |
View Project |
| 65 |
|
KIIFB-RWSS to Vallikkodu Kodumon - Replacement of damaged ACpipe from Vallikodu OH tank to Vazhamuttom kurisu transmission line and Zonekunnu to Kodumon transmission line. (PTAKIIFB0418890) |
No Updates
|
NA |
No Updates
|
30 Jun 2021 |
610 |
View Project |
| 66 |
|
KIIFB-Project5 WSS to Onchiyam chorode etc Villages - Replacing Damaged AC Distribution main from Edakkandikunnu - Vellikulangara, Vellikulangara - Orkattery, Vellikulangara - Chorode, Edakkandikunnu to Madappally with 350mm & 300 mm DI K9 Pipe (CLTKIIFB03191942) |
View Progress
|
NA |
View Photos
|
31 Mar 2021 |
608 |
View Project |
| 67 |
|
KIIFB PROJECT-CARWSS to kozhinjampara and adjoining villages-Replacement of 200 mm AC clear water gravity main from master OHSR at moongilmada to sathram sump with 200 mm DI k9 pipe for 16000 m-replacement of 200 mm AC Clear water gravity main from master OHSR at oonkilmada to kozhinjampara OHSR with 250 mm DI K9 PIPE FOR 6750 M (PKDKIIFB0319689) |
View Progress
|
NA |
View Photos
|
31 May 2021 |
587 |
View Project |
| 68 |
|
KIIFB-RWSS to Angadi-Replacement of damaged pipe lines at various places of RWSS to Angdi( 5 Nos of Replacement) (PTAKIIFB0418879) |
View Progress
|
NA |
View Photos
|
31 May 2021 |
577 |
View Project |
| 69 |
|
UWSS to Shornur Municipality - Replacement of 300 to 80mm AC distribution lines for zone II GLSR area (PKDKIIFB0319662) |
View Progress
|
NA |
View Photos
|
30 Jun 2021 |
576 |
View Project |
| 70 |
|
KIIFB-TWSS-Replacement of existing damaged 315mm HDPE pipes with 350mm DI pipe from Observatory to Ayurveda College (TVMKIIFB0418656) |
View Progress
|
View Layout |
View Photos
|
30 Sep 2021 |
562 |
View Project |
| 71 |
|
KIIFB - project-(TRAN2-WRD 005-131;Replacement of transmission mains in Kannur circle-project no4-kolachery wss(from panayathamparamba break pressure tank to kudukimotta for enhancement of coverage in koodali and munderi panchayaths (KNRKIIFB01192301) |
No Updates
|
NA |
No Updates
|
30 Jun 2021 |
561 |
View Project |
| 72 |
|
KIIFB-PROJECTS-TRAN2-WRD005-126-Replacement of Transmission mains in Muvattupuzha circle-ARWSS to Rajakkad-Rajakumary (IDKKIIFB01196084) |
View Progress
|
NA |
View Photos
|
Date is not specified |
487 |
View Project |
| 73 |
|
KIIFB-RWSS to Vechoochira- Relaying of damaged pipe lines Chethackal- Koothattukulam and Treatment plant to Vechoochira town. (PTAKIIFB0418887) |
View Progress
|
NA |
View Photos
|
31 May 2021 |
478 |
View Project |
| 74 |
|
KIIFB Project - 2-Augmentation to BWSS- Replacement of 300mm AC pipe Distribution System (CLTKIIFB0319997) |
No Updates
|
NA |
No Updates
|
30 Jun 2021 |
420 |
View Project |
| 75 |
|
KIIFB - UWSS to Adoor and adj pt. (2215-01-190-94) 2018-19 - Replacement of 400 mm AC Transmission line and Distribution main by using 400mm DI K9 pipe from TP at Chiranikkal to Parakodu junction in Adoor municipality (PTAKIIFB04186079) |
View Progress
|
NA |
View Photos
|
Date is not specified |
391 |
View Project |
| 76 |
|
KIIFB - pROJECT 5-CWSS to Kallara and Pangode - Replacing 350 mm AC transmission cum distribution main from Chamavila - Nellimukku with 350 mm DI K9 pipe and 250 mm AC pipe along KT Kunnu - Pattara road with 250 mm DI K9 pipe. (TVMKIIFB04186109) |
View Progress
|
NA |
View Photos
|
Date is not specified |
343 |
View Project |
| 77 |
|
KIIFB-BAWSS to Kundara and adjoining panchayath-Replacement of old 300 mm AC transmission main with 300 mm DI K9 pipe from Ezhukone GLSR to Cheerankaavu junction (KLMKIIFB01182401) |
No Updates
|
View Layout |
No Updates
|
30 Jun 2021 |
313 |
View Project |
| 78 |
|
KIIFB-Project-10-WSS to Anjarakandy, Peralassery and adjoining panchayats-Replacing old 300mm, 250mm and 200mm AC distribution main pipes with 300 mm, 250 mm and 200 mm DI K9 pipes in Anjarakandy Panchayat (KNRKIIFB01192313) |
View Progress
|
NA |
View Photos
|
31 Oct 2021 |
292 |
View Project |
| 79 |
|
KIIFB - RWSS to Konni Aruvappulam - Replacing of damaged 250 mm AC gravity main pipe with 250 mm DI K9 pipe near intake pump house Konni Aruvappulam. (PTAKIIFB04186059) |
View Progress
|
NA |
View Photos
|
Date is not specified |
285 |
View Project |
| 80 |
|
WRD005-126-UWSS to Piravom- Replacement of 350 mm AC gravity main from Kakkad TP to Piravom hospital jn-Laying 350 mm DI K9 pipe 3350m. (EKMKIIFB0119647) |
View Progress
|
NA |
View Photos
|
31 Dec 2021 |
278 |
View Project |
| 81 |
|
KIIFB Project 6 - RWSS to Thuneri Village- Replacing existing 200mm AC gravity main with 250mm DI K9 pipe from Nadapuram junction to Kakkamvellikkunnu GLSR (CLTKIIFB03191955) |
No Updates
|
NA |
No Updates
|
15 Jul 2021 |
259 |
View Project |
| 82 |
|
KIIFB project - Kasargode WSS- Replacing of old and damaged premo and PVC pipe from Vidhyanagar KWA compund to old bus stand Kasaragod (balance work) (KGDKIIFB01192409) |
No Updates
|
NA |
No Updates
|
31 Jul 2021 |
247 |
View Project |
| 83 |
|
KIIFB-CWSS to Ettumanoor and Adjoining Villages -Replacing Conveyance main from OHSR at Medical College to OHSR at Kuriyattukunnu Using 250mm DI K9 pipe. (KTMKIIFB03192664) |
View Progress
|
View Layout |
View Photos
|
30 Jun 2021 |
239 |
View Project |
| 84 |
|
KIIFB Project 7 - RWSS to Edachery- Replacing 200mm and 150mm AC distribution mains (CLTKIIFB03191963) |
No Updates
|
NA |
No Updates
|
31 Jul 2021 |
238 |
View Project |
| 85 |
|
KIIFB-Project-7-Kolecherry WSS-Zone I-Replacing old 400/350 mm premo/AC pipe from Kothery GLtank to Vayanthode Jn. with 400 mm DI pipe (KNRKIIFB01192310) |
No Updates
|
NA |
No Updates
|
30 Oct 2021 |
229 |
View Project |
| 86 |
|
KIIFB - PROJECT(TRAN 2- WRD 005-131) Replacement of Transmission Mains in Kannur Circle - Project No: 8 - W.S.S to Anjarakandy, Peralassery & adjoining Panchayaths(MOONUPERIYA JUNCTION TO VELLACHAL TOWN JUNCTION) - Replacement of A.C distribution main in Peralassery Panchayath. (KNRKIIFB01191850) |
No Updates
|
NA |
No Updates
|
30 Jun 2021 |
211 |
View Project |
| 87 |
|
KIIFB- RWSS to Chennerkkara-Mezhuveli - Replacing damaged AC pipe at Pannikuzy,Elavumthitta,Muttathukonam,Manjanikkara and Ramanchira area. (PTAKIIFB0418883) |
View Progress
|
NA |
View Photos
|
31 May 2021 |
198 |
View Project |
| 88 |
|
Project-15-RWSS to Thrikodithanam - Replacing old exising 150mm AC conveyance main line with 200mm DI K9 pipe from Mittayi company Fathimapuram to Thrikodithanam boosting pump house (KTMKIIFB0518768) |
View Progress
|
NA |
View Photos
|
30 Sep 2021 |
189 |
View Project |
| 89 |
|
WRD005-126-UWSS to Piravom and adjoining panchayaths- Replacement of damaged 250 mm AC gravity main from Kakkadu WTP to Pazhoor sump by laying 250 mm DI pipe line 2650 m (EKMKIIFB0119520) |
View Progress
|
NA |
View Photos
|
30 Jun 2021 |
182 |
View Project |
| 90 |
|
WRD 005-126-ARWSS to Pothanikad and Pallarimangalam- Replacing damaged 250 mm AC and 200 mm AC distribution line with 250 mm & 200mm in Pothanikad pt (EKMKIIFB0119649) |
View Progress
|
NA |
View Photos
|
24 Aug 2021 |
180 |
View Project |
| 91 |
|
KIIFB Project 3 Augmentation to BWSS - Replacement of 250mm AC pipe distribution system (CLTKIIFB09191265) |
No Updates
|
NA |
No Updates
|
30 Jun 2021 |
180 |
View Project |
| 92 |
|
KIIFB Project- 4 RWSS to Velom- Supplying and 250mm DI K9 pipes for Distribution main in place of damaged 250mm AC pipe for 3200m and supplying and laying 90mm PVC pipe line for rider main (CLTKIIFB03191938) |
No Updates
|
NA |
No Updates
|
31 May 2021 |
180 |
View Project |
| 93 |
|
WRD 005-126-UWSS to Kothamangalam- Replacement of 300 mm AC pipe with 300 mm DI K9 from Jawahar jn to mathirappilly in kothamanagalam Municipality. (EKMKIIFB0119648) |
View Progress
|
NA |
View Photos
|
26 Aug 2021 |
176 |
View Project |
| 94 |
|
KIIFB-UWSS to Kottayam -Replacing old and Damaged 160mm PVC Conveyance main from OHSR at KWA Kottayam to OHSR at Thalikkotta Using 150mm DI K9 pipe (KTMKIIFB03192674) |
View Progress
|
NA |
View Photos
|
31 Dec 2021 |
171 |
View Project |
| 95 |
|
KIIFB -ARWSS Parathodu- Replacing Existing 250mm AC line with 250mm DI from Booster Pump house Kooramthookku to Koovappally (KTMKIIFB03192672) |
View Progress
|
NA |
View Photos
|
31 May 2021 |
139 |
View Project |
| 96 |
|
KIIFB WRD 005 -UWSS to Muvattupuzha-replacing damaged200mm AC and150mmAC distribution pipe from Latha bus stand jn to Kizhakkekkara with with 200mmDI and 160mmPVC pipe (EKMKIIFB01191694) |
View Progress
|
NA |
View Photos
|
31 Aug 2021 |
137 |
View Project |
| 97 |
|
KIIFB -Project 4- CWSS to Kallara and Pangode Panchayaths - Replacing 300 mm AC pipeline along Nellimukku Iyyermukku(Thannichal) road with 300 mm DI K9 pipe and Replacing 125 mm AC pipe near Paluvalli and Vattakkarikkakom with 140 mm PVC 10 Kg/cm2 pipe. (TVMKIIFB04186107) |
View Progress
|
NA |
View Photos
|
Date is not specified |
104 |
View Project |
| 98 |
|
KIIFB-RWSS to Pathanapuram Panchayath-Replacement of very old and damaged AC & PVC pipes at various places in Pathanapuram Panchayath (KLMKIIFB01182403) |
View Progress
|
NA |
View Photos
|
30 Jun 2021 |
102 |
View Project |